PEMBANGUNAN 2 UNIT PC 60M (MULTIYEARS TA 2020,2021,2022)

DAILY ACTIVITY REPORT

REPORT Minggu ke - 16
DAY / DATE Selasa,16 Juni 2020

DESCRIPTION OF ACTIVITY
NO. MANPOWER / JOB TITLE Q'TY UNIT NO. EQUIPMENT / TOOLS QTY UNIT
TO DAY ACTIVITY TOMORROW ACTIVITY
Engineering Engineering 1 Koord. Project Manager 1 Org 1 Mesin Las SAW Unit
Submission drawing piping system (Fire Fighting) Submission drawing piping system (Fire Fighting) 2 Project Manager 1 Org 2 Mesin Las FCAW Unit
Pembuatan drawing structural frame 17 – 24, Pembuatan drawing bollard construction & arrangement Pembuatan drawing structural frame 17 – 24, Pembuatan drawing bollard construction & arrangement 3 Engineer 1 Org 3 Mesin Las SMAW 2 Unit
4 Project Control 1 Org 4 Mesin Las Gouging Unit
5 Design Engineer 1 Org 5 Compressor Unit
Quality Control Quality Control 6 Owner Surveyor Org 6 Cutting Wheel Unit
Identifikasi material:Heat Number, Shot blast & shop prime,Cutting & bending plat 6mm BV-AH36 (H47&H48) Identifikasi material:Heat Number, Shot blast & shop prime,Cutting & bending plat 6mm BV-AH36 (H47&H48) 7 QA-QC 2 Org 7 Portable gas cutting Unit
Record hasil Witness BV Class, Komandan Satgas dan QC untuk survey keel elevation H47 Record hasil Witness BV Class, Komandan Satgas dan QC untuk survey keel elevation H47 8 HSE Officer 1 Org 8 Oven drier 7.5 KW Unit
Pengecekan ulang keel elevation H48 Pengecekan ulang keel elevation H48 9 Structural Supervisor Org 9 Disc Grinder 6" 1 Unit
Hull Construction Hull Construction 10 Mechanical Piping Supervisor Org 10 Disc Grinder 4" 3 Unit
Pekerjaan shotblast & shop prime,cutting & bending Corrugated BHD type D plat 6mm BV-AH36 (H47&H48) Pekerjaan shotblast & shop prime,cutting & bending Corrugated BHD type D plat 6mm BV-AH36 (H47&H48) 11 Electrical supervisor Org 11 Blower Kerja 2 Unit
Fabrikasi dan assembly corrugated plat type D plat 6mm BV-AH36 (H47&H48) Fabrikasi dan assembly corrugated plat type D plat 6mm BV-AH36 (H47&H48) 12 Mechanical supervisor Org 12 Bor Magnet Unit
Kedatangan material plat: Unloading & penempatan plat 6mm qty: 15 lbr BV-AH36 (H47&H48) 13 Utilities Foreman / Supv. 3 Org 13 Bor Tangan Unit
Kedatangan material plat: Unloading & penempatan corrugated BHD type D qty: 12 pcs BV-AH36 (H47&H48) 14 Fitter 12 Org 14 Lampu spot 2 Unit
15 Welder 4 Org 15 Lampu Jalan Unit
16 Helper 8 Org 16 Kabel Las Unit
Health Safety Environment Health Safety Environment 17 Mechanic Operator Org 17 Kabel power 3 Unit
Memonitor item pekerjaan yang akan dilakukan pada area kerja (workshop H47&H48) Memonitor item pekerjaan yang akan dilakukan pada area kerja (workshop H47&H48) 18 Crane Operator Org 18 Cutting torch 1 Unit
Pemeriksaan kelengkapan APD pekerja sebelum memasuki area workshop Pemeriksaan kelengkapan APD pekerja sebelum memasuki area workshop 19 Electrical Tecnician Org 19 Selang blander Unit
Pengawasan pekerjaan fabrikasi & assembly konstruksi pada area kerja (workshop H47&H48) Pengawasan pekerjaan fabrikasi & assembly konstruksi pada area kerja (workshop H47&H48) 20 Mechanic Tecnician Org 20 Selang angin Unit
Pengawasan unloading & penempatan material plat dari truck menuju area kerja (workshop H47&H48) 21 Safety Man 1 Org 21 Regulator Oksigen Unit
Machinery and Propulsion Machinery and Propulsion 22 Driver Org 22 Regulator LPG Unit
23 Tukang 1 Org 23 Regulator CO2 Unit
24 Tukang 2 Org 24 Air Disc grinder Unit
Piping and Valve Piping and Valve 25 Painter Org 25 Level block Unit
26 Chain block 2 Unit
27 Mechanical jack Unit
Outfiting, sistem bantu dan pompa Outfiting, sistem bantu dan pompa 28 Enerpac Hydraulic Unit
29 Portable Bevelling Machine 1 Unit

Interior dan furniture Interior dan furniture

Electrical Electrical

Navigation & Communication Navigation & Communication


Peralatan khusus Peralatan khusus
TOTAL MANPOWER 36 Org
Topic of Safety Meeting WEATHER CONDITION NOTE : MATERIAL ONSITE GALANGAN
Safety Man : _________ Jam 08.00 - 12.00 Cerah Deviasi - BV AH36 Steel Plate 6 mm 15 lbr
- Gunakan PPE yang sesuai saat melakukan pekerjaan. Jam 13.00 - 16.30 Cerah Total 135 lbr
- Cek konsentrasi gas sebelum mulai pekerjaan panas. Jam 16.30 - 17.30 Cerah - BV AH36 Corrugated BHD type D 12 pcs
- Cek peralatan pengelasan sebelum digunakan pastikan aman digunakan. Jam 17.30 - 21.30 Total 48 pcs
- Siapkan APAR dan air di sekitar area pengelasan.

Disiapkan / diperiksa Disetujui Disetujui


PT. Caputra Mitra Sejati PT. Caputra Mitra Sejati Pjs. Komandan Satgas DN Yekda
Kapal PC 60

Denny Indracahya M. Iqbal Kurniawan


Project Planning Project Manager Imam Nurhadi, S.T., M.T
Kolonel Laut (T) NRP 11396/P

FORM/CMS-PNB-PNB/001. REV. 00

You might also like