Analisa Harga Satuan r1
Analisa Harga Satuan r1
Analisa Harga Satuan r1
I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 69,000.00
2 Kaca Polos 3 mm ( ASAHI ) m2 87,400.00
3 Kaca Polos 5 mm ( ASAHI ) m2 111,000.00
4 Kaca Polos 8 mm ( ASAHI ) m2 183,100.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 148,700.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 323,400.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 627,000.00
8 Kaca cermin 5 mm m2 150,500.00
9 Kaca cermin 6 mm m2 186,400.00
10 Kaca cermin 8 mm m2 234,300.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,621,100.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 3,425,700.00
13 Kaca 6 mm Gravver m2 1,263,900.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 22,000.00
15 Glass Block DN 20 x 20 Ex LN bh 125,700.00
16 Sealant kg 211,800.00
17 Jendela Nako bh 109,200.00
K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 166,700.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 210,200.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 298,000.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 351,800.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 439,300.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 595,000.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 869,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,423,400.00
9 Besi Pipa Hitam 1" t = 2 mm bt 172,300.00
10 Besi Pipa Hitam 2" t = 2 mm bt 227,900.00
11 Besi Pipa Hitam 3" t = 2mm bt 365,800.00
12 Besi Pipa Hitam 4" t = 2 mm bt 573,100.00
13 Besi Pipa Hitam 6" t = 2 mm bt 772,400.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 109,100.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 159,400.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 181,500.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 259,300.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 280,500.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 326,400.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 467,400.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 672,100.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 849,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 920,300.00
24 Macam2 Sambungan GIP 1/2" bh 6,300.00
25 Macam2 Sambungan GIP 3/4" bh 8,600.00
26 Macam2 Sambungan GIP 1" bh 16,700.00
27 Macam2 Sambungan GIP 1 1/4" bh 19,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 20,700.00
29 Macam2 Sambungan GIP 1 3/4" bh 22,700.00
30 Macam2 Sambungan GIP 2" bh 51,200.00
31 Macam2 Sambungan GIP 2 1/2" bh 60,400.00
32 Macam2 Sambungan GIP 3" bh 75,900.00
33 Macam2 Sambungan GIP 4" bh 118,600.00
34 Pipa PVC RUCIKA type AW 1/2" bt 40,100.00
35 Pipa PVC RUCIKA type AW 3/4" bt 52,200.00
36 Pipa PVC RUCIKA type AW 1" bt 63,200.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 79,900.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 105,900.00
39 Pipa PVC RUCIKA type AW 2" bt 110,700.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 167,100.00
41 Pipa PVC RUCIKA type AW 3" bt 205,100.00
42 Pipa PVC RUCIKA type AW 4" bt 347,900.00
43 Pipa PVC RUCIKA type AW 6" bt 640,000.00
44 Pipa PVC RUCIKA type AW 8" bt 818,300.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 22,500.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 27,800.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 40,500.00
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt 58,500.00
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt 60,200.00
50 Pipa PVC MASPION ABU ( AW ) 2" bt 75,800.00
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 126,300.00
52 Pipa PVC MASPION ABU ( AW ) 3" bt 145,700.00
53 Pipa PVC MASPION ABU ( AW ) 4" bt 256,800.00
54 Macam2 Sambungan Paralon 1/2" bh 4,400.00
55 Macam2 Sambungan Paralon 3/4" bh 4,700.00
56 Macam2 Sambungan Paralon 1" bh 4,900.00
57 Macam2 Sambungan Paralon 1 1/4" bh 7,200.00
58 Macam2 Sambungan Paralon 1 1/2" bh 9,500.00
59 Macam2 Sambungan Paralon 1 3/4" bh 13,500.00
60 Macam2 Sambungan Paralon 2" bh 15,800.00
61 Macam2 Sambungan Paralon 2 1/2" bh 26,400.00
62 Macam2 Sambungan Paralon 3" bh 29,700.00
63 Macam2 Sambungan Paralon 4" bh 34,000.00
64 Sambungan Pipa PVC Jenis AW 4" TY bh 89,900.00
65 Lem Paralon tb 10,100.00
66 Solatip Ledeng gl 4,200.00
67 Pipa PVC 4" Berlobang Jenis AW m1 36,700.00
68 PVC Waterstop lebar 150 m1 53,500.00
69 PVC Waterstop lebar 200 m1 57,900.00
70 PVC Waterstop lebar 230 m1 65,700.00
71 PVC Waterstop lebar 250 m1 74,700.00
72 PVC Waterstop lebar 300 m1 83,600.00
73 PVC Waterstop lebar 320 m1 92,500.00
L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 103,900.00
2 Stop Kran 1" KIT bh 124,200.00
3 Stop Kran 1 1/2" KIT bh 208,000.00
4 Stop Kran 2" KIT bh 267,900.00
5 Stop Kran 2 1/2" KIT bh 713,200.00
6 Stop Kran 3" KIT bh 830,300.00
7 Check Valve 1/2" bh 86,400.00
8 Double Neple 1/2" bh 32,400.00
9 Water Mur 1/2" bh 40,200.00
10 Gate walve 1/2" bh 55,500.00
11 Saringan Air Lt. KM Stainless Steel bh 66,600.00
12 Apooer Bath Tube bh 267,800.00
13 Kran Stainless Lokal Kait bh 46,100.00
14 Shower Dengan Tiang bh 221,000.00
15 Shower Tanpa Tiang bh 134,800.00
16 Kran Tembok Sun Eui dia. 1/2" bh 86,900.00
17 Kran Tembok ITAP dia. 1/2" bh 40,900.00
18 Kran Bebek Sun Eui 1/2" bh 144,600.00
19 Kran Bebek ITAP 1/2" bh 51,500.00
20 Kran Panas Dingin San Eui Standard bh 228,400.00
21 Bath Cape Washteren unit 2,098,700.00
22 Tempat Sabun Poslin bh 46,300.00
23 Wastafel Lengkap TOTO LW 230 unit 1,012,700.00
24 Wastafel Lengkap INA unit 699,900.00
25 Closet Jongkok Poslin Warna TOTO unit 205,600.00
26 Closet Jongkok Standard Putih Poslin TOTO unit 188,200.00
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,032,900.00
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,724,700.00
29 Wastafel Bulat Warna Standard Lengkap unit 910,800.00
30 Closet Duduk Warna Standard INA Lengkap bh 1,272,300.00
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit 1,773,400.00
32 Penyekat Poslin Urinoar TOTO lbr 495,900.00
33 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) bh 397,800.00
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh 1,272,300.00
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) bh 1,650,200.00
36 Talang PVC U - 15 cm btng 60,000.00
N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit 71,396,400.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit 216,358,900.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit 591,647,100.00
4 Presure Tank kap. 500 liter lengkap unit 36,997,300.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 6,854,400.00
6 Fire House 1.5 x 30 m + nose unit 4,866,100.00
7 Exhose Fan H 360 W 60 x 60 cm unit 6,862,900.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 5,491,100.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,092,600.00
10 AC Split 3 PK Setara TOSHIBA unit 30,791,800.00
11 AC Split 2 PK Setara TOSHIBA unit 21,926,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,174,100.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 4,200,000.00
O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL 102,700.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 151,700.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m' 6,600.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m' 7,600.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m' 4,900.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m' 10,900.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 7,600.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 6,300.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 15,400.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 20,700.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 11,800.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 13,700.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 18,600.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 17,600.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 119,700.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 26,500.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 29,700.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 12,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 19,300.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m' 23,800.00
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m' 14,500.00
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m' 19,200.00
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m' 18,500.00
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' ) m' 20,400.00
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' ) m' 25,800.00
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' ) m' 35,800.00
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) m' 41,900.00
28 NSFB FUJI EA - 100 A bh 841,900.00
29 NSFB FUJI EA - 150 A bh 2,182,600.00
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 153,500.00
31 Skring Kas 2 grop Biasa unt 204,800.00
32 Skring Kas 3 grop Biasa unt 222,600.00
33 Skring Kas 5 grop Biasa unt 468,800.00
34 MCB 1 PAS bh 55,100.00
35 MCB 3 PAS bh 106,000.00
36 Tahanan 50 A Merk Fuji bh 521,100.00
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh 23,800.00
38 Saklar Broko Seri Standard ( 1 Phase ) bh 26,300.00
39 Stop Kontak Broko Standard ( 1 Phase ) bh 23,800.00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 87,700.00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 144,900.00
42 Stop Kontak Handle 3 Phase bh 87,800.00
43 Instalas Titik Lampu / Stop Kontak (Upah dan Alat) ttk 179,600.00
44 Lampu pijar 25 Watt s/d 100 Watt bh 61,200.00
45 Lampu Neon Phillips 20 Watt bh 29,700.00
46 Lampu Neon Phillips 40 Watt bh 35,200.00
47 Trapo TL 20 W (Phillips) bh 41,800.00
48 Trapo TL 40 W (Phillips) bh 37,900.00
49 Trapo TL 20 W (Sinar) bh 40,600.00
50 Trapo TL 40 W (sinar) bh 41,300.00
51 Stater Neon Phillips bh 8,300.00
52 Stater Neon Biasa bh 6,500.00
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) bh 144,000.00
54 Down Light + SL 25 W bh 306,900.00
55 Lampu SL Philip 25 W bh 306,900.00
56 Lampu Sirkel TL 20 W Lengkap bh 67,900.00
57 Lampu Mercuri 80 W bh 147,400.00
58 Lampu Taman + Tiang + Lampu 1 Buah bh 307,600.00
59 Lampu Baret 30 cm + Neon bh 221,700.00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 738,000.00
61 Jarum Penangkal Petir 16 bh 101,500.00
62 Kawat BC ( Tembaga ) kg 65,100.00
63 Pentanahan Penangkal Petir ttk 423,700.00
64 Pentanahan Panel ttk 296,100.00
T ALAT TUKANG
1 Palu 0.5 kg bh 39,300.00
2 Cangkul bh 24,500.00
3 Singkup bh 41,400.00
4 Sekrop bh 50,100.00
5 Pengki bh 12,300.00
6 Linggis bh 41,700.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 101,000.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 37,800.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm m 1,600.00
10 Water Pas Alumunium 60 cm bh 88,200.00
V BAHAN PAGAR
1 Panel Beton Pracetak lbr 199,200.00
2 Kolom Beton Pracetak btg 264,000.00
B. BIDANG PERTAMANAN
1 Aglonema batang 50,000.00
2 Bambu krisik/jepang batang 50,000.00
3 Furadan kg 24,000.00
4 Kompos/pupuk kandang karung 25,000.00
5 M atoa (2 m) batang 40,000.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 100,000.00
7 Philo batang 75,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m batang 25,000.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 10,000.00
10 Rumput gajah mini m2 15,000.00
HARGA SATUAN UPAH KERJA BANGUNAN
NO URAIAN SAT HARGA ( Rp )
HARGA SATUAN
NO URAIAN SATUAN VOLUME
(Rp)
35,000.00
3,515.00 70,300.00 Zak
1,277.00
1,800.00
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,216.00
269,200.00
35,000.00
3,515.00
75,480.00
1,277.00
1,800.00
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,136.00
355,100.00
28,000.00
2,812.00
158,750.00
1,277.00
1,800.00
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,743.00
222,700.00
22,446.00
468.00
14,501.90
4,200.00
6,500.00
750.00
400.00
49,265.90
49,200.00
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
30,000.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,133,400.75
1,133,400.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,000.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,380.00
861,300.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,000.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,380.00
861,300.00
4,200.00
4,000.00
8,200.00
8,200.00
30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,700.00
280,014.00
2,640.00
282,654.00
282,600.00
280,140.00
2,400.00
282,540.00
282,500.00
196,411.20
138,600.00
18,899.60
29,200.00
63,270.00
15,750.00
8,125.00
900.00
1,520.00
472,675.80
472,600.00
6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,800.00
15,750.00
9,375.00
900.00
1,520.00
167,963.32
167,900.00
25,000.00
5,850.00
10,500.00
1,105.00
150.00
1,040.00
43,645.00
43,600.00
31,250.00
21,000.00
2,000.00
54,250.00
54,200.00
B. ANALISA HARGA SATUAN PEKERJAAN TANAH
HARGA SATUAN
NO URAIAN SATUAN VOLUME
(Rp)
16,800.00
3,200.00
20,000.00
20,000.00
2,209.20
4,160.00
6,369.20
6,300.00
30,870.00
5,840.00
36,710.00
36,700.00
26,250.00
4,960.00
31,210.00
31,200.00
34,566.00
6,640.00
41,206.00
41,200.00
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI
HARGA SATUAN
NO URAIAN SATUAN VOLUME
(Rp)
226,050.00
284,012.00 70,300.00 zak
113,199.00
63,000.00
39,000.00
4,500.00
6,000.00
735,761.00
735,700.00
226,050.00
229,178.00
121,368.00
63,000.00
39,000.00
4,500.00
6,000.00
689,096.00
689,000.00
226,050.00
191,216.00
126,969.60
63,000.00
39,000.00
4,500.00
6,000.00
656,735.60
656,700.00
246,600.00
52,590.00
32,760.00
25,350.00
292.50
3,120.00
360,712.50
360,700.00
D. ANALISA HARGA SATUAN PEKERJAAN BETON
D-01 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
Kayu papan terentang M3 0.27
Paku Biasa 2" - 5" Kg 2
Besi Beton Kg 180
Kawat Beton Kg 3
Semen Portland Kg 32.3
Pasir Beton M3 0.52
Koral Beton 2/3 M3 0.78
Pekerja Oh 4.85
Tukang Batu Oh 0.35
Tukang Kayu Oh 1.56
Tukang Besi Oh 1.4
Kepala Tukang Oh 0.331
Mandor Oh 0.17
Jumlah
HARGA SATUAN
TOTAL (Rp)
(Rp)
2,850,000.00 769,500.00
23,400.00 46,800.00
16,500.00 2,970,000.00
27,700.00 83,100.00
1,406.00 45,413.80
255,400.00 132,808.00
200,000.00 156,000.00
42,000.00 203,700.00
65,000.00 22,750.00
65,000.00 101,400.00
65,000.00 91,000.00
75,000.00 24,825.00
80,000.00 13,600.00
4,660,896.80
E. ANALISA HARGA SATUAN PEKERJAAN DINDING
775.00 108,500.00
1,406.00 46,327.70
233,400.00 21,239.40
42,000.00 27,300.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 2,400.00
220,267.10
220,200.00
775.00 108,500.00
1,406.00 37,329.30
233,400.00 21,706.20
42,000.00 27,300.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 2,400.00
211,735.50
211,700.00
775.00 108,500.00
1,406.00 31,213.20
233,400.00 23,806.80
42,000.00 27,510.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 2,400.00
207,930.00
207,900.00
775.00 54,250.00
1,406.00 20,204.22
233,400.00 9,336.00
42,000.00 13,440.00
65,000.00 6,500.00
75,000.00 750.00
80,000.00 1,200.00
105,680.22
105,600.00
775.00 54,250.00
1,406.00 16,169.00
233,400.00 10,036.20
42,000.00 13,440.00
65,000.00 6,500.00
75,000.00 750.00
80,000.00 1,200.00
102,345.20
102,300.00
775.00 54,250.00
1,406.00 13,610.08
233,400.00 10,503.00
42,000.00 13,440.00
65,000.00 6,500.00
75,000.00 750.00
80,000.00 1,200.00
100,253.08
100,200.00
F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN DAN ACI
1,406.00 11,979.12
233,400.00 3,967.80
42,000.00 8,400.00
65,000.00 9,750.00
75,000.00 1,125.00
80,000.00 800.00
36,021.92
36,000.00
1,406.00 9,110.88
233,400.00 4,434.60
42,000.00 8,400.00
65,000.00 9,750.00
75,000.00 1,125.00
80,000.00 800.00
33,620.48
33,600.00
1,406.00 7,311.20
233,400.00 4,668.00
42,000.00 8,400.00
65,000.00 9,750.00
75,000.00 1,125.00
80,000.00 800.00
32,054.20
32,000.00
1,406.00 15,184.80
233,400.00 6,068.40
42,000.00 10,500.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,000.00
47,253.20
47,200.00
1,406.00 12,204.08
233,400.00 6,535.20
42,000.00 10,500.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,000.00
44,739.28
44,700.00
1,406.00 10,249.74
233,400.00 6,068.40
42,000.00 10,500.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,000.00
42,318.14
42,300.00
1,406.00 5,624.00
42,000.00 6,006.00
65,000.00 6,955.00
75,000.00 787.50
80,000.00 840.00
20,212.50
20,200.00
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
1,900.00 47,500.00
42,000.00 6,300.00
65,000.00 4,875.00
75,000.00 600.00
80,000.00 640.00
59,915.00
59,900.00
6,000.00 300,000.00
1,406.00 11,248.00
233,400.00 7,468.80
42,000.00 16,800.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 160.00
350,176.80
350,100.00
100,000.00 60,000.00
23,800.00 1,190.00
42,000.00 5,880.00
65,000.00 4,355.00
75,000.00 525.00
80,000.00 560.00
72,510.00
72,500.00
80,000.00 28,000.00
23,800.00 2,856.00
42,000.00 5,880.00
65,000.00 4,550.00
75,000.00 525.00
80,000.00 560.00
42,371.00
42,300.00
73,300.00 30,786.00
23,800.00 2,856.00
42,000.00 5,880.00
65,000.00 4,550.00
75,000.00 525.00
80,000.00 560.00
45,157.00
45,100.00
65,900.00 28,996.00
23,800.00 2,856.00
42,000.00 5,880.00
65,000.00 4,355.00
75,000.00 525.00
80,000.00 560.00
43,172.00
43,100.00
1,900.00 836.00
23,800.00 2,856.00
42,000.00 5,880.00
65,000.00 4,355.00
75,000.00 525.00
80,000.00 560.00
15,012.00
15,000.00
80,900.00 35,596.00
23,800.00 2,856.00
42,000.00 5,880.00
65,000.00 4,355.00
75,000.00 525.00
80,000.00 560.00
49,772.00
49,700.00
38,100.00 80,010.00
800.00 4,800.00
42,000.00 3,528.00
65,000.00 8,125.00
75,000.00 975.00
80,000.00 344.00
97,782.00
97,700.00
8,500.00 93,500.00
23,400.00 702.00
42,000.00 8,400.00
65,000.00 6,500.00
75,000.00 750.00
80,000.00 800.00
110,652.00
110,600.00
2,700.00 48,600.00
42,000.00 6,300.00
65,000.00 4,875.00
75,000.00 600.00
80,000.00 640.00
61,015.00
61,000.00
4,000.00 72,000.00
42,000.00 6,300.00
65,000.00 4,875.00
75,000.00 600.00
80,000.00 640.00
84,415.00
84,400.00
H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT
NO URAIAN SATUAN
NO URAIAN SATUAN
1 56,000.00 56,000.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
92,670.20
92,600.00
1 62,500.00 62,500.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
99,170.20
99,100.00
1 53,000.00 53,000.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
89,670.20
89,600.00
1 58,000.00 58,000.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
94,670.20
94,600.00
1 56,800.00 56,800.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
93,470.20
93,400.00
1 65,500.00 65,500.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
102,170.20
102,100.00
1 72,200.00 72,200.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
108,870.20
108,800.00
1 75,200.00 75,200.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
111,870.20
111,800.00
1 68,900.00 68,900.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
105,570.20
105,500.00
1 76,600.00 76,600.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
113,270.20
113,200.00
1 72,500.00 72,500.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
109,170.20
109,100.00
1 77,000.00 77,000.00
8 1,406.00 11,248.00
0.0215 233,400.00 5,018.10
0.013 15,700.00 204.10
0.25 42,000.00 10,500.00
0.12 65,000.00 7,800.00
0.012 75,000.00 900.00
0.0125 80,000.00 1,000.00
113,670.20
113,600.00
NO URAIAN SATUAN
NO URAIAN SATUAN
1 306,600.00 306,600.00
1.05 42,000.00 44,100.00
1.5 65,000.00 97,500.00
0.105 75,000.00 7,875.00
0.0052 80,000.00 416.00
456,491.00
456,400.00
1 211,800.00 211,800.00
1.05 42,000.00 44,100.00
1.05 65,000.00 68,250.00
0.105 75,000.00 7,875.00
0.0052 80,000.00 416.00
332,441.00
332,400.00
15 18,300.00 274,500.00
32.8 24,000.00 787,200.00
0.05 23,600.00 1,180.00
0.2 42,000.00 8,400.00
0.2 65,000.00 13,000.00
0.02 75,000.00 1,500.00
0.001 80,000.00 80.00
1,085,860.00
1,085,800.00
1 501,700.00 501,700.00
1.05 42,000.00 44,100.00
1.05 65,000.00 68,250.00
0.105 75,000.00 7,875.00
0.0052 80,000.00 416.00
622,341.00
622,300.00
1 537,300.00 537,300.00
0.35 42,000.00 14,700.00
0.35 65,000.00 22,750.00
0.035 75,000.00 2,625.00
0.0018 80,000.00 144.00
577,519.00
577,500.00
K. ANALISA HARGA SATUAN PEKERJAAN PENUTUP BESI DAN ALMUNIUM
NO URAIAN SATUAN
HARGA SATUAN
VOLUME TOTAL (Rp)
(Rp)
K. ANALISA HARGA SATUAN PEKERJAAN PENUTUP BESI DAN ALMUNIUM
NO URAIAN SATUAN
HARGA SATUAN
VOLUME TOTAL (Rp)
(Rp)
M. ANALISA HARGA SATUAN PEKERJAAN SANITASI
NO URAIAN SATUAN
1 188,200.00 188,200.00
6 1,406.00 8,436.00
0.01 233,400.00 2,334.00
1 42,000.00 42,000.00
1.5 65,000.00 97,500.00
1.5 75,000.00 112,500.00
0.16 80,000.00 12,800.00
463,770.00
463,700.00
1 1,773,400.00 1,773,400.00
6 1,406.00 8,436.00
0.01 233,400.00 2,334.00
1 42,000.00 42,000.00
1 65,000.00 65,000.00
0.1 75,000.00 7,500.00
0.001 80,000.00 80.00
0.3 1,773,400.00 532,020.00
2,430,770.00
2,430,700.00
1 1,012,700.00 1,012,700.00
6 1,406.00 8,436.00
0.01 233,400.00 2,334.00
1.2 42,000.00 50,400.00
1.45 65,000.00 94,250.00
0.15 75,000.00 11,250.00
0.1 80,000.00 8,000.00
0.12 1,012,700.00 121,524.00
1,308,894.00
1,308,800.00
1 255,300.00 255,300.00
1.8 42,000.00 75,600.00
2.7 65,000.00 175,500.00
0.54 75,000.00 40,500.00
0.11 80,000.00 8,800.00
0.18 255,300.00 45,954.00
601,654.00
601,600.00
53 775.00 41,075.00
44 1,406.00 61,864.00
0.07 233,400.00 16,338.00
0.07 200,000.00 14,000.00
1.6 16,500.00 26,400.00
0.06 255,400.00 15,324.00
3.2 42,000.00 134,400.00
1.015 65,000.00 65,975.00
0.0015 75,000.00 112.50
0.016 80,000.00 1,280.00
376,768.50
376,700.00
NO URAIAN SATUAN
HARGA SATUAN
VOLUME TOTAL (Rp)
(Rp)