MUHAMMAD KHIZAR

QA/QC Precast Inspector


+966 57 3022760
khizarriaz529@gmail.com

Q UALITY DRIVEN AND RESULT ORIENTED PROFESSIONAL WITH DETAIL FOCUSED WORK ACUMEN
I have 7.4 years of work experience in my profession. Some of the key skills I have
acquired are as follows: Involved in Quality, management and supervision of different
prestigious project such as: buildings, bridges, precast civil works and other industrial &
infrastructure project.

ACADEMIC VIGNETTE
 D.A.E : Diploma of Associate Civil Engineering (3 years).2016
 Matriculation : Board of intermediate and secondary Education
Gujranwala, Pakistan. (2013)

CERTIFICATIONS

 Approved from Neom Precast Quality Inspector- A”


 Certified American Concrete Institute (ACI). Grade-1
 Certified ISO 9001 Awareness: 2015
 Approved from Aramco BP&CTU Precast Pre-Stressed Laboratory Inspector
(BP&CTU Control Number: 1553)

Professional Experience

Company: RDB Al-Seif Precast Company Al Kharj Industrial Area, KSA


Date: June 2021 – Until Date
Position: Precast Inspector
Project: Neom Oxagon Design, Build & Operate Precast Facilities
Security Forces Medical Center Riyadh & Jeddah
Client: Neom
Ministry of Interior

 Monitoring quality inspections and ensuring completion without any delays.


Inspections include bindings of reinforcement steel, different molds like beams,
columns, hollow core, and solid slabs, foundations of towers, claddings, wall panels
with architectural finishing, stair and landings.
 Supervision of onsite and offsite testing works.
 Making sure that production team follows documented procedure and standards.
 Perform pre-inspection to ensure that all installed materials are within the
standards in conformance to applicable drawings & specs.
 Preparing RFI (Request for Inspection) for all civil activities.
 To ensure that all execution and inspection are carried out as per inspection plan /
drawings / codes & specifications
MUHAMMAD KHIZAR
QA/QC Precast Inspector
+966 57 3022760
khizarriaz529@gmail.com

 Issuing the NCR (Non Conformance Report) for any nonconformance.


 Ensure all inspection and test requirement of the project are met all stages of
process production as per the specification and contract requirements.
 The Discipline Precast Quality inspector is responsible for the implementation of the
project Quality plan and project specification through local and surveillance.
 Conducted the Trial Mix for Mix Design approval.
 To comply with Quality Assurance/Quality control laws, norms, standards and
specification.
 Coordinate in the preparation of final RFI and handover documents.
 Keep record of all Mix Design using at our project.
 Involved in different projects ranging from industrial projects to prestigious multi
stories residential, commercial projects, Housing Schemes, Metro projects.
 Coordinating with safety team and ensuring highest safety standards are being
maintained.
 To coordinate with the Consultant / Supervisor for inspection of works stages
according to method statement after being inspected internally to gain his approval
on the works requested and to make the corrective action needed to gain his
acceptance.

Company: Prainsa Precast Factory Saudi Arabia


Date: Feb 2018 – May 2021
Position: Laboratory Technician / Precast Pre-Stressed Qc Inspector
Project: Residential camps, bridges, substations, Sharma Complex,
Power Plants
Client: SEC, Saudi Aramco, Nesma & Partner.

Responsibilities:

 Monitoring/Inspecting Concrete Pouring of elements such as HCS, Wall Panel, Slab


TT, Column, Beams, Stair case, parapet, solid slabs, bridges and foundations.
 Co-ordinate with the client, consultants.
 Reviewing third party laboratory inspection.
 Witnessing of the testing of compressive strength of concrete at the 3rd party
laboratory.
 Making the entire reports related laboratory.
 Check slump test, temperature of every truck batch.
 Check temperature of chiller water, Ph. TDS of mixing water.
 Checking calibration of batch plant.
 Make sure that each mix design is allotted uniform code.
 To verify that plant possess approved mix design copy as a part of documentation.
MUHAMMAD KHIZAR
QA/QC Precast Inspector
+966 57 3022760
khizarriaz529@gmail.com

 Make sure that concrete is being batched as per approved mixing proportions.
 Ensure that all concrete raw materials are being procured by approved vendors.
 To verify also that all raw material test results reports has been submitted to client.

 Ensure all inspection and test requirements of the project are met all stages of
process production as per the specification and contract requirements.
 Inspection & approval of cast sample for delivery.
 Inspection of footing, columns, beams, panel, HCS and roof slabs.

 Conduct inspection of incoming raw materials like fine and Course aggregates.
 Perform sieving for aggregate and provide data results.
 Conducted the Trail Mix for Mix design approval
 To comply with Quality Assurance/Quality Control laws, norms, standards and
specifications.

 Documentation of all RFI’s (Request for Inspection) after signed by the consultant.
 Reporting all the related activities to Quality Manager.
.

Habib Rafiq (Pvt.) Limited Lahore, (Jan 2017 — Jun 2017)


(Laboratory Technician.)

 Making all the reports related laboratory.


 Witness for clients of concrete specimens crushing & taking care of lab activities...
 Conduct sampling of fresh concrete for correct temperature, slump, density, and
Compressive strength based on specification, either cylinder and cubes fabrication.
 Conduct inspection of incoming raw materials like sand and aggregates.
 Perform sieving for aggregate and provide data results.
 Check temp of chiller water, ph. TDS of mixing water.
 Testing and checking of concrete pouring.
 Co-ordinate with the client consultants & engineers.
 To report regularly about quality performance and deficiency trends.

PERSONAL INFORMATION
Name : MUHAMMAD KHIZAR
Date of Birth : 12th April 1996
Marital Status : Single
Phone no : +966 57 3022760, +966 50 6321959
MUHAMMAD KHIZAR
QA/QC Precast Inspector
+966 57 3022760
khizarriaz529@gmail.com

Iqama Type : Transferable


Personal Driving License : Available

DECLARATION
I hereby declare that the information given above is true to the best of my knowledge.

Place: Saudi Arabia


1/24/24, 11:20 AM Aconex

NEOM Infrastructure DC Final (WF-124829) 11-640000-4800000678-RED-HRM-… 21/01/2024


NEOM - PROJECTS WORKFLOW TRANSMITTAL NPR-WTRAN-132074

11 Regional Infrastructure
Regional Infrastructure
NEOM
Saudi Arabia

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal NPR-WTRAN-132074 NPR-WTRAN-132074

Final (WF-124829) 11-640000-4800000678-RED-HRM-CVS-000137_01_Curriculum


Vitae Muhammad Khizar (Quality Control Inspector)

From Mr NEOM Infrastructure DC - NEOM - Projects

To (2) Mr NEOM Infrastructure DC - NEOM - Projects (+1 more...)

Cc (7) Mr Mazin Mohammad Amad - Bechtel KSA (+6 more...)

Sent Sunday, 21 January 2024 9:46:54 PM AST (GMT +03:00)

Status N/A

DOCUMENT ATTACHMENTS (2)

(0 selected)

Revision
File Document No Revision Title Status
Date

11-640000-4800000678-RED- Curriculum Vitae Muhammad Khizar A - Work May


01 13/01/2024
HRM-CRS-000138 (Quality Control Inspector) Proceed

11-640000-4800000678-RED- Curriculum Vitae Muhammad Khizar A - Work May


01 13/01/2024
HRM-CVS-000137 (Quality Control Inspector) Proceed

MESSAGE

Workflow Review History

The attached documents have completed the "11-640000-4800000678-RED-HRM-CVS-000137_01_Curriculum Vitae Muhammad Khizar
(Quality Control Inspector)" workflow with the following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

https://ksa1.aconex.com/hub/index.html 1/2
1/24/24, 11:20 AM Aconex

11-640000-4800000678-
RED DCC - EPM DCC N Infrastructure DC A - Work May Proceed
RED-HRM-CRS-000138

11-640000-4800000678-
RED DCC - EPM DCC N Infrastructure DC A - Work May Proceed
RED-HRM-CVS-000137

https://ksa1.aconex.com/hub/index.html 2/2
COMPANY Comments to Transmittal
SA-MIP-UFP-T-0964
MIP PKG12 - UTILITIES, FLARE AND PIPERACK FOR TANAJIB GAS PLANT PROJECT CONTRACTOR Ref. No.

CONTRACT No. : 6600044615(IK) SM12-HT-SA-T-1390


Subject: Closed_PRAINSA Corrective Action Request CAR No.1 (IFA, Rev. 00C)
Drawing & Document Reference Comment
No. Section No. COMPANY Comment CONTRACTOR Reply
Number Standard Initiator
1- This evaluation for the proposed corrective action, root- causes and
preventive action of the pending CARs been issued for Prainsa Saudi
Arabia for Precast PSRCP BP #1 and PCRCP.BP #2 (Manuf. No.
30006447) on
Material 9COM 6000000560 and Material 9COM 6000000561. Located
in 2nd
Industrial Area, Dammam.
2- In line with the correction progress and to secure the required
corrective action of CAR 4043335946 -05. BP&CTU reviewed and
evaluate the proposed internal Pre-Stressed Lab Technician
documents,
CV, certificates, experiences, and found has the required competency
for
carrying this position.
2.1- The interview has been conducted on Wednesday, March 31, 2021,
with
the following results:
2.1.1-
Name: Mr. Muhammad Khizar
Proposed Position: Internal Pre-Stressed Lab Technician
Status: Pass and Approved
BP&CTU Control Number: 1553 (Take-01)
2.2- BP&CTU approve the proposed Internal Pre-Stressed Lab
Technician with the following comments:
2.2.1- The approval is for Saudi Aramco material 9COM: 6000000560
CONCRETE; PRESTRESSED ONLY.
2.2.2- BP&CTU reserves the right to revoke this approval if found
unsatisfactory performance while carrying out their duties and fall
short of the knowledge requirement and when found not adhering to
Saudi
1 Aramco Quality Standard Implementation.
2.2.3- Internal batch plant quality personnel shall not be changed. The
absence of the key personnel such as BP Manager, QMR, BP
Inspector,
Laboratory Technicians and HSE personnel due to vacation or
emergency
leave shall be notified by the BP manager to ITSD. BP&CTU in
writing 30 days during regular leaves or 24 hours in advance in case of
emergency.
2.2.4- The Proposed Organization Chart is approved for material
9COM:
6000000560 and material 9COM: 6000000561, the manufacturer shall
update
the organization chart of the subject batch plant accordingly.
3- Proposed Corrective Action Evaluation:
3.1. CAR - 4043474844 - Q05:
No approved internal QC Lab Technicians: Aramco Asia: Company General Use PAGE : 1 of 2
Evaluation:
The proposed corrective action is implemented, evaluated and
accepted.
2.2.3- Internal batch plant quality personnel shall not be changed. The
absence of the key personnel such as BP Manager, QMR, BP
Inspector,
Laboratory Technicians and HSE personnel due to vacation or
emergency
COMPANY
leave shall be notified by the BP manager to ITSD.Comments
BP&CTU in to Transmittal
writing 30 days during regular leaves or 24 hours SA-MIP-UFP-T-0964
in advance in case of
emergency.
2.2.4-
MIP The Proposed
PKG12 Organization
- UTILITIES, FLARE AND Chart is approved
PIPERACK FORfor TANAJIB
material GAS PLANT PROJECT CONTRACTOR Ref. No.
9COM:
6000000560 and material 9COM:CONTRACT No. : 6600044615(IK)
6000000561, the manufacturer shall SM12-HT-SA-T-1390
Subject: Closed_PRAINSA Corrective Action Request CAR No.1 (IFA, Rev. 00C)
update
the organization chart of the subject batch plant accordingly.
Drawing & Document Reference Comment
No. Section No. 3- Proposed Corrective Action
COMPANYEvaluation:
Comment CONTRACTOR Reply
Number 3.1. CAR - 4043474844 - Q05: Standard Initiator
No approved internal QC Lab Technicians:
Evaluation:
The proposed corrective action is implemented, evaluated and
accepted.
CAR 4043335946 -05 Closure is Attached.
4- Attachments:
4.1. Accepted CAR Closure # April 01, 2021

Aramco Asia: Company General Use PAGE : 2 of 2