Switch Houses Inspection Checklist

Tag Description: Tag No.:

P. O. No.: Inspection Classification Area/Unit:

Subcontractor: Subcontractor Owner Turnover System:

Work Package: Company Other Sub – System:


Item Description of Check Subcontractor Client
Tidiness and general condition of station and yard in satisfactory condition.
Verify the following items:
01 Station exterior:
Has the station been numbered and fire fighting instructions and danger
signs been provided?
02 Is the station equipment complete with:
First aid/electrical shock treatment directions
03 Verify instructions required by local authority.
04 Key diagram of main power system
05 Single line diagrams of switchgear
06 Schematic/wiring diagrams of switchgear
07 Blackboard and/or log book
08 Sufficient caution and danger notices and spare fuses
09 If a telephone is provided:
10 Fire extinguisher State
11 type: equipment
Special operating tools/grounding CO2/BCF

12 Proper operation of:


Safety locks
13 Doors, door locks and panic bars
14 Lighting, socket outlets, emergency lighting
15 H. V. A. C.
16 Verify appropriate and in operating condition.

Notes:

Company
Name:

Signature:

Date: