FORMAT NO: TPIT/HGU/GEN/F-64 Rev.

Project : HGU, EPCC-06, VRMP Project- Visakh Refinery, Visakhapatnam (A.P)


CLIENT : Hindustan Petroleum Corporation Ltd Report No. :T1/F/FP/
LEPCONTRACTOR : Technip Italy S.p.A Date :
PMC: Engineers India Ltd. UNIT :HGU

FINISH PAINT INSPECTION REPORT


ITEM:(Ex.PIPE,PIPE SPOOLS,STRUCTURE,TANK PLATE/TANK) LOOP NO: 505-VT-1037-818 Measuring Instruments Sl. No. CALIBRATION DUE DATE

(Surface/Ambient) Temperature: 33⁰C DFT Gauge 2101EC394307 21/04/2023


Humidity%: 67 Hygrometer M18039235 10/4/2023
PRIMER-2 INTERMEDIATE & FINISH PAINT
Touch-up paint
2nd Coat 1st Coat 2nd Coat 3rd Finish Coat RAL No.
Expiry
Paint Material Details: F12 Batch No. Batch No. Expiry date Batch No. Expiry date Batch No. Expiry date Batch No. Expiry date
date

300/412101/08/2022 Aug-23

Surface / Ambient Temp.: Surface / Ambient Temp.: Surface / Ambient Temp.: Surface / Ambient Temp.: Surface / Ambient Temp.: 33⁰C
Humidity%: Humidity%: Humidity%: Humidity%: Humidity%: 67
Paint Material System: 11.1.2 Dew Point Temp.: Dew Point Temp.: Dew Point Temp.: Dew Point Temp.: Dew Point Temp.: 18⁰C
Application: Airless spray /
Application: Airless spray / Brush Application: Airless spray / Brush Application: Airless spray / Brush Application: Airless spray / Brush
Brush
INTERMEDIATE & FINAL PAINT INSPECTION
DFT of Primer coat in Microns
ITEM DFT in Microns DFT in Microns DFT in Microns
Repair Coat/
Sl. No. (Drg. No./ Pipe Mat. Spec./ Line No./ Eqp. Quantity Remarks
Touch-up
No./ Str. Mark No.) Result Checker's Result Checker's Result Checker's Result Checker's
2nd coat Avg. 1st Coat Avg. Avg. 3rd FINISH Coat Avg.
Acc/ Rej Signature Acc/ Rej Signature 2 Coat
nd
Acc/ Rej Signature Acc/ Rej Signature

1 2"-D1-P-505-12508_01 1 80 70 69 73 ACC IRN-92

2 2"-D1-P-505-12508_02 2 68 77 71 72 ACC IRN-191 ,154

3 2"-D1-P-505-12509_01 2 70 78 67 72 ACC IRN-95 ,196

4 3"-D1-VT-505-R1131_01 1 68 69 66 68 ACC IRN-83

5 3"-D1-VT-505-R1131_02 1 80 65 78 74 ACC IRN-8116970849-12

Based on visual check, DFT readings, proper color coding, ID mark including weld joints ,primary and secondary supports: Final painting of above items is accepted.
Checkers/ Reviewers/ Approvers TPIT - EXECUTION TPIT - QUALITY EIL / HPCL

Inspector’s name