Testing of CT
Testing of CT
Testing of CT
a) IR Measurement.
b) CT ratio check.
c) CT polarity check.
d) CT winding resistance and lead resistance measurement.
e) CT excitation test for metering, protection and PS class CT.
f) Secondary injection testing of metering and protection core including unit
protection schemes.
g) Combined primary and secondary injection testing of metering and
protection cores up to rated current.
A) IR Measurement
Outline of Procedure
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
P1
E L S1
M S2
P2
Fig . 1
P1
S1
E L
M
P2 S2
Fig . 2
c) Secondary to earth IR measurement
1. Connect the test setup as per Fig. 3
2. Note IR readings at 1kV.
3. The minimum acceptable value will be > 1 MΩ.
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
P1
S1
L E
M
P2 S2
Fig . 3
d) Core 1 to Core 2 IR measurement
1. Connect the test setup as per Fig. 4
2. Note IR readings at 1kV.
3. The minimum acceptable value will be > 1 MΩ.
P1 S1
S2 L E
M
S1
S2
P2
Fig . 4
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
B) Polarity Checks
Outline of Procedure
+ C
P1
S1
+
- S2
S1
S2
P2
Fig . 5
Precautions
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
C) Ratio Checks
Outline of Procedure
P1
PORTABLE
CORE 1
AMMETER
S1
C 5A/1A
~ S2
CORE 2
P2
Fig . 6
Outline of Procedure
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
4. Apply voltage gradually and note down the voltage and current. Increase
the voltage till rated CT current is reached.
5. Check the kPV from the test vis-a vis the kPV specified for the CT core.
6. Compare the readings for all the three phases for each core. It shall be
approximately same.
7. Compare the knee point voltages of metering and protection core. The
knee point voltage of metering core should be less than the protection
core.
8. After final measurement reduce the supply gradually.
9. To facilitate comparison, make measurements for the three phases at
same voltage readings.
2A/8A
P1 S1
AM VARIAC PH
S2 VM ~ 230V AC
5OHZ
P2
NE
Fig . 7
Precautions
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
E) CT secondary winding and lead resistance measurement
Outline of Procedure
S1 I1
V1
S2
I2 V2
MICRO OHM
METER
Fig.8
F) CT secondary injection test
Outline of Procedure
1. Connect the test setup as per Fig. 9, 10, 11 for phase to earth fault
simulation.
2. Retain common terminal connection of CT secondary ‘C1’
3. Disconnect phase side CT connection of CT secondary ‘C2’.
4. Measure injected current in respective phases relay terminals.
5. Repeat the test for phase to phase fault simulation
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
6. Connect the test setup as per Fig. 12, 13, 14 for phase to phase fault
simulation.
7. Repeat the above for all cores and all CT including unit protection
schemes.
8. After the test ensure that CT connections are restored.
R Y B
DIRECT CONNECTION,
IF ‘Y’ PHASE
NOT INSTALLED
S1 51 R RN
10 A 51 N
~ AC
S2 S1 51 Y
SOURC
S2 S1 51 B
S2 C2 DISCONNECT HERE
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
R Y B
DIRECT CONNECTION,
IF ‘Y’ PHASE
NOT INSTALLED
S1 51 R
10 A 51 N
~ AC
S2 S1 51 Y YN
SOURC
S2 S1 51 B
S2 C2 DISCONNECT HERE
R Y B
DIRECT CONNECTION,
IF ‘Y’ PHASE
NOT INSTALLED
S1 51 R
10 A 51 N
~ AC
S2 S1 51 Y
SOURC
S2 S1 51 B BN
S2 C2 DISCONNECT HERE
C1
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
R Y B
10A AC,
DIRECT CONNECTION,
SOURCE IF ‘Y’ PHASE RELAY
NOT INSTALLED
51 R
S1
~ S2
DISCONNECT HERE
51 Y
C2 51 N
S1
S2 S1 51 B
S2
C1
RETAIN CONNECTION
R Y B
DIRECT CONNECTION,
10 A AC, IF ‘Y’ PHASE RELAY
SOURCE NOT INSTALLED 51 R
S1
DISCONNECT HERE
S2 51 Y
C2
~ S1
51 N
S2 51 B
S1
S2
C1 RETAIN CONNECTION
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
R Y B
10 A AC, DIRECT CONNECTION,
SOURCE IF ‘Y’ PHASE RELAY
NOT INSTALLED
51 R
S1
C2
S2 51 Y
DISCONNECT HERE
~ S1
51 N
S2 51 B
S1
S2
C1 RETAIN CONNECTION
Precautions
Outline of Procedure
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
2. Connect the test setup as per Fig. 15, 16, 17 for R, Y, B phase current
injection.
3. Inject the current on primary and measure current on secondary as per
rough ratio, at all relay/ meter terminals.
4. Repeat the above test R-Y, Y-B, B-R current injection.
5. Connect the test setup as per Fig. 18, 19, 20 for R-Y, Y-B, B-R current
injection.
6. Repeat the above tests for all other cores except unit protection cores.
R Y B
P1 P1 P1 51 R
3 KVA S1
PRIMARY 51 Y 51 N
INJECTION ~ S2 S1
SET
S2 S1 51 B
S2
P2 P2 P2
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
R Y B
P1 P1 P1 51 R
S1
3 KVA
PRIMARY 51 Y 51 N
INJECTION ~ S2 S1
SET
S2 S1 51 B
S2
P2 P2 P2
R Y B
P1 P1 P1 51 R
S1
3 KVA
PRIMARY 51 Y 51 N
INJECTION S2 S1
SET
~ S2 S1 51 B
S2
P2 P2 P2
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
R Y B
P1 P1 P1 51 R
3 KVA S1
PRIMARY 51 N
INJECTION ~ S2 S1
51 Y
SET
S2 S1 51 B 0 0
0 S2
P2 P2 P2
R Y B
P1 P1 P1 51 R
0
3 KVA S1
PRIMARY 51 N
~ 0 S1
51 Y
INJECTION S2
SET
S2 S1 51 B 0
S2
P2 P2 P2
Reliance Energy Center, Santacruz, Mumbai – 400 055, Tel – (022) 3009 9999
R Y B
P1 P1 P1 51 R
3 KVA S1
PRIMARY 51 N
INJECTION ~ S2 S1
51 Y
0
SET
0 S2 51 B
S1 0
S2
P2 P2 P2
Precautions
1. Initially inject only 10% of CT primary current. Measure current and its
distribution on secondary side.
2. Increase the current up to desired value, if current distribution is found OK.
3. For multi core CTs test one CT at a time and keep other cores shorted.
Outline of Procedure