Testing of EHV Instrument
Testing of EHV Instrument
October 2009
CPRI
Mobile Field Testing Unit for On-Site accuracy
testing of EHV Instrument Transformers
Salient Features
Designed for testing of IVTs/CVTs upto 400kV class
Designed for testing of CTs upto 2000Amps
Current ratio error measurement accuracy of 10PPM & resolution of 1
PPM
Voltage ratio error measurement accuracy of 50PPM & resolution of 1
PPM
Phase angle displacement error of 10 µ Rad accuracy for CTs & 50 µ
Rad for
IVTs/CVTs
Fully automatic microcomputer controlled instrument transformer test
set
Data downloading software & Report generating software
Top removable Cabin for High Voltage & High Current Equipment
Independent Air-Conditioned Cabin
Radio Controlled Hydraulic Folding Crane
CPRI
* Consists of:
Truck duly mounted with folding crane
Series Resonant Testing Transformer rated for 300kV, 300kVA
High Current Source rated for 2000 Amp, 15V Coupling
Capacitor – 50pF, 300kV rating
Automatic Instrument Transformer Test Set
Electronic Voltage Divider
Current Comparator
Programmable Voltage Burden
Programmable Current Burden
Portable Energy Meter Test set of 0.02% accuracy class
Automatic Capacitance & Tan Delta Testing System CT
Analyser
CPRI
Advantages
Current
Burden
Automatic
Instrument
Transformer
Test Set
Electronic Voltage
Standard Burden
Voltage Divider
Automatic
Instrument
Transformer
Test Set
V
Fantom Energy meter Scanning
Source under test Head
I
I
Reference
Standard
V
CPRI
Site Requirements
Obtaining shutdown of the instrument transformer to
be tested shall be the responsibility of the Customer
(Utility / Manufacturer).
Opening & boxing up of the instrument transformer
and disconnection & reconnection of links / bus bars
etc. has to be arranged by the Utility / Manufacturer so
that the Instrument Transformer is made available for
safe testing.
3 phase, 415V, 50Hz, 125Amp power supply to be
made available for energizing mobile CT/PT Testing
unit at site by the Utility / Manufacturer.
Two skilled electricians for making electrical
connection and six unskilled workers for making
testing arrangements to be provided at site by the
Utility / Manufacturer.
Coordinator to be nominated for facilitating testing at
site.
CPRI
Site Requirements
The normal working hours for conducting site testing will be
8 hrs per day. During the 8 hrs one feeder consisting of 3
CTs or IVTs or CVTs can be tested provided the
disconnections are made before commencement of tests.
Similarly other tests such as tan delta, capacitance, burden
measurement, winding resistance measurement, excitation
characteristic, instrument security factor, knee point voltage,
class can also be taken up on per day chargeable basis.
Arrangement of Way Bill/Octroi exemption if applicable, for
concerned State Border entry formalities for the CPRI test
equipments transported by mobile CT/PT Testing Unit to be
arranged by concerned Utility / Manufacturer well in
advance. The WAY BILL shall be valid for multiple trips for
the entire duration of testing.
The testing results & conclusions there-of will be issued in
the form of test report at site on the same day