Professional Documents
Culture Documents
Site Plan
Site Plan
Site Plan
E-mail: beokuwhitfield@outlook.com
General Notes
- Contractor to check all dims. on-site prior to
fabrication
- This drawing is to be read in conjunction with all
other relevant drawings, BOQ and Specifications
- Depth of foundation as per load bearing
capacity of the soil.
25' - Any error should be pointed out to the
10' Engineer on-site
Septic
Tank - 3D rendering are for illustration purposes only.
62'
Project:
0"
28'
5'-1
PROPOSED DWELLING
HOUSE
PRO
AD
te
Ga
STR POS
UC ED
RO
TU
RE Location:
"
7'-7
SS
45'
CE
83'
AC
Client:
ET
5'-
4"
Thomas
FE
Drawing Title:
20
N
Site Plan
Drawn By:
Nathaniel Whitfield
Checked By:
Sheik Rahman Davies
Scale:
N.T.S
November, 2022.