MOP ATM Hydra site Data Center NetEco restart to active adapter software-July
1. Document Revision History
Rev Date Author Description
26/07/2022 Lihui ( Evan) Energy supervision
2. Approval
APPROVED? YES NO
By approving, the manager has ensured that the following has been satisfied:
The MOP has been completed with all the required information.
Front office and or Call Center, ATM Management, EOT manager, has been advised of the work to be done.
All node/service impacted responsible(s) have been advised with adequate notice of the working to be done, and
have taken appropriate actions related to, before after and during activities.
The engineers will notify all appropriate parties when the work is completed.
3. MOP INFORMATION
a. OVERVIEW
Engineering Marketing Request
Correction Loading
Request
NRO NPOC
Requester Contact
Name/Phone:
Li Hui 560945 / 0658541027 0780801449
Operation: ATM Hydra site Data Center NetEco restart to active adapter software for new model of air
condition and DG monitor board in ATM DC PO3/4 project.
1.1 Service Impact
Remote monitor of data center for around 30 mins.
1.2 Prepare before operation
1.2.1 Back up NetEco data V600R08C10SPC570.
1.2.2.Upload new adapter software package to server --- done
1/3
1.3 Operation step
Time : 0:30-1:00 27-July
1.3.1 Remote access Hydra data center NetEco;
1.3.2 Check NetEco status, then make manual backup;
1.3.3 Use Powerecho to restart NetEco software;
1.3.4 Check NetEco status.
sites Phone
SITE Disturbance Start Disturbance End Customer Contact
affected Number
Alger Hydra Hydra 27/07/2022 at 0:30 27/07/2022 at 1:00 as Mobilis
as Mobilis arrange
site NetEco arrange
i. Patch Information
Patch/Package/ACA/Script Name Size (bytes) checksum value
2/3
iii. Related Documents
Appendixes, Release note document numbers, CPI Store document numbers
Guidance:
N/A .
Definitions
Non-standard or new acronyms introduced within the documentation or patch or new terms.
Guidance:
N/A .
Package Structure
i. Overview of work
Step Responsible(put an x in approp box)
Step Description BO SL Huawei
Completed
initial
Confirm the effected nodes are up and running in the
following manner:
Backup Done---------------------------------------------
Pre-check All files to be modified Backed up------------------
Secured test phones, verification tests------------
File System cleaned up prior to beginning-------
Soak period defined-----------------------------------
Procedure Procedure
Testing
N.B: when this operation is started we must put an engineer in the NGBSS room to
check.
3/3