Method of Procedure (MOP)

MOP ATM Hydra site Data Center NetEco restart to active adapter software-July
1. Document Revision History
Rev Date Author Description
26/07/2022 Lihui ( Evan) Energy supervision

2. Approval
APPROVED? YES NO

DATE: 26/07/2022 TIME 12H40 TRAFFIC IMPACT RATING:

APPROVER NAME: OUKIL BILEL LOW MEDIUM HIGH

By approving, the manager has ensured that the following has been satisfied:

The MOP has been completed with all the required information.
Front office and or Call Center, ATM Management, EOT manager, has been advised of the work to be done.
All node/service impacted responsible(s) have been advised with adequate notice of the working to be done, and
have taken appropriate actions related to, before after and during activities.
The engineers will notify all appropriate parties when the work is completed.

3. MOP INFORMATION
a. OVERVIEW
Engineering Marketing Request
Correction Loading
Request
NRO NPOC

Requester Contact
Name/Phone:
Li Hui 560945 / 0658541027 0780801449

Description of the procedure:

Operation: ATM Hydra site Data Center NetEco restart to active adapter software for new model of air
condition and DG monitor board in ATM DC PO3/4 project.
1.1 Service Impact
Remote monitor of data center for around 30 mins.
1.2 Prepare before operation
1.2.1 Back up NetEco data V600R08C10SPC570.
1.2.2.Upload new adapter software package to server --- done

1/3
1.3 Operation step
Time : 0:30-1:00 27-July
1.3.1 Remote access Hydra data center NetEco;
1.3.2 Check NetEco status, then make manual backup;
1.3.3 Use Powerecho to restart NetEco software;
1.3.4 Check NetEco status.

BASIC MOP INFORMATION


1. Site Name/Designation: Alger Hydra site data center NetEco
Phon 0658541027
2. Prepared by: Li Hui 560945 Dept.: Energy dept. e: 0780801449

3. Scheduled Start Date:


Installation: 27/07/2022 Testing: 27/07/2022 0:30
Other
:
4. Scheduled Completion Date:
1:00
Installation: 27/07/2022 Testing: 27/07/2022
Other
:

5. Work Window (Start Time / Stop Time):


Installation: 27/07/2022 Testing: 27/07/2022 0:30-1:00
Other

b. WORK OVERVIEW – Purpose

Reason(s) for Issue / brief summary of work required / potential risks:

This MOP is a follow up action, please see the following description:

Effected nodes information:

sites Phone
SITE Disturbance Start Disturbance End Customer Contact
affected Number
Alger Hydra Hydra 27/07/2022 at 0:30 27/07/2022 at 1:00 as Mobilis
as Mobilis arrange
site NetEco arrange

i. Patch Information
Patch/Package/ACA/Script Name Size (bytes) checksum value

ii. Applicability (optional if you have included release nodes).


Guidance:
N/A

2/3
iii. Related Documents
Appendixes, Release note document numbers, CPI Store document numbers

Guidance:
N/A .
Definitions
Non-standard or new acronyms introduced within the documentation or patch or new terms.

Guidance:
N/A .

Package Structure

iv. Time Allotment Relative to Procedure


Time Estimates Duration
Estimated prep time 0.5 hour before start
Estimated Installation time (excluding prep) 0.5 hours
Estimated total downtime 0.5 hours
Estimated test duration N/A
Estimated time for rollback N/A
c. Roll Back Procedure Consideration
Attach the roll back procedure here: N/A

4. CHANGE OF SYSTEM SOFTWARE / CONFIGURATION


THE SWITCH MUST BE FAULT FREE FOR AT LEAST 24 HOURS

i. Overview of work
Step Responsible(put an x in approp box)
Step Description BO SL Huawei
Completed
initial
Confirm the effected nodes are up and running in the
following manner:

 Backup Done---------------------------------------------
Pre-check  All files to be modified Backed up------------------
 Secured test phones, verification tests------------
 File System cleaned up prior to beginning-------
 Soak period defined-----------------------------------

Procedure Procedure

Testing

N.B: when this operation is started we must put an engineer in the NGBSS room to
check.