Professional Documents
Culture Documents
FMEAformato
FMEAformato
Category
Hazardous
without Harzardous
Severity warning with warning Very High High Moderate
Occurrence <=1 in 2 1 in 3 1 in 8 1 in 20 1 in 80
Absosute
Detection Uncertainty Very Remote Remote Very Low Low
Terminology
A. Process or Product Name – Description of Process or Product being analyzed.
B. Responsible – Name of Process Owner.
C. Prepared By - Name of Agent coordinating FMEA study.
D. FMEA Date – Dates of Initial and subsequent FMEA Revisions.
Process Step/Part
E. Potential Number
Failure Mode – Description
– Description of individual
of how item
the process being
could analyzed.fail to meet the
potentially
F. process requirements and/or design intent, i.e. a description of a non-conformance at that
specific process step.
G. Potential Failure Effects – Description of the effects of the Failure Mode upon the customer, i.e.
what the next user
SEV (Severity) of assessment
– An the process ofor the
product would experience
seriousness of the effectorofnotice.
the potential failure mode
H. upon the customer.
Potential Causes – Description of how the failure could occur, described in terms of something
that can
I. OCC be corrected– or
(Occurrence) controlled.of how frequently the specific failure cause is expected to
Description
occur, ranked
J. Current on a– scale
Controls of 1 to of
Description 10process
as per the table below.
controls that either prevent, to the extent possible, the
K. failure mode from occurring, or detect the failure mode should it occur.
L. DET (Detection) – An assessment of the probability that the current controls will detect the
potential cause, or the subsequent failure mode.
M. RPN (Risk Priority Number) – The product of the Severity, Occurrence, and Detection
Rankings i.e. RPN = SEV * OCC * DET.
N. Actions Recommended – Actions to reduce any or all of the Occurrence, Severity or Detection
rankings.
O. Responsibility – Person or group responsible for the Recommended Action.
P. Actions Taken – Brief description of actual action and effective date.
Q. New SEVERITY Rating after corrective action.
R. New OCCURENCE Rating after corrective action.
S. New DETECTION Rating after corrective action.
T. Resulting new RPN after corrective action.
5 4 3 2 1
5 5
4 4
3 3
2 Pilosidad 2
1 1
OCCURENCE DETECTION
³1 in 2 Very High Absolute Uncertainty
1 in 3 Very High Very Remote
1 in 8 High Remote
1 in 20 High Very Low
1 in 80 Moderate Low
ader".
SCORING
Score 10 9 8 7 6 5 4 3 2 1
Category
Hazardous
without Harzardous
Severity warning with warning Very High High Moderate Low Very Low Minor Very Minor None
Occurrence <=1 in 2 1 in 3 1 in 8 1 in 20 1 in 80 1 in 400 1 in 2000 1 in 15000 1 in 150000 >=1 in 150K
Absosute Moderately
Detection Uncertainty Very Remote Remote Very Low Low Moderate High High Very High Almost Certain
Page 4
Company: Your Co, Inc.
Page 5 of 5
Project: Copying Process FMEA Printed on 05/02/2024 20:07:38
Owner __Key Operator_
S O D R Actual
p Risk
E C E P Action Responsibl Schedule Action Completion p p p
r
p X
Part/process Modo de Fallas Effects Falla V Causas C Controles T N Recommended e Person Date Taken Date SOD n Risk prpn
Batan % de Mezcla no estándar Hilo barrado 9 Mezcla de Alg. 3 Insp.Cargas 1 27 0 0
Reproceso x Fuera d Estándar Reprocesos 0 0 0
Exceso de Neps 0 0 0
0 0 0
Fmea Form