01 SWITCH BOARD NAME: MCC
ITEM NAME. :- MCC PROJECT :-
02 QTY. 01
MARASSI PROJECT
H8-Boutique Hotel H8-Boutique Hotel &Utility Building
03 PANEL MANUFACTURER /TYPE: SR BASIC
BOILERS ELECTRICAL PANEL MEDITERRANEAN-NORTH COAST, EGYPT
04 INSTALLATION METHOD: WALL MOUNTED CLIENT: PROJECT MANAGEMENT:
EMAAR MISR FOR DEVELOPMENT S.A.E
05 ENTRY: CABLES/BOTTOM P.O. BOX 229
MOKATTAM, CAIRO
EGYPT
06 EXIT: CABLES/BOTTOM TEL +20.2.2503.2000
FAX +20.2.2503.2020
o EMAIL: WWW.EMAAR.COM
07 AMBIENT TEMPERATURES: 35 C
08 DEGREE OF PROTECTION: IP 65 LEAD CONSULTANT: MAIN CONTRACTOR:
09 FORM OF SEGREGATION: 1
10 NO. OF PHASES: 3P
www.ecgsa. com
11 RATED VOLTAGE 380V
12 CONTROL VOLTAGE: 220V
13 RATED CURRENT In: 40 A
14 Sheet Metal: 1.5 mm ELECTROSTATIC
15 ENCLOSURE COLOUR: RAL 7035
16 Total Dimensions (H*W) mm 1( H1000xW800xD300)

17 CABLE - INSULATION: EL SWEDDY CABLES


18 TIN PLATED BUS BAR: NO
19 SILVER PLATED CONTACTS NO
20

DATE NAME Title :-


PREPARED 12/12/2023

15/12/2023
CHECKED COVER
16/12/2023

APPROVED

DRWG. No. 22 --- 001 C


04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
01 Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
Eng.Karim Galal
First issued REV. NO 0
www.ecgsa. com
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
Eng.Karim Galal
First issued REV. NO 0
04 Date : MARASSI PROJECT
H8-Boutique Hotel &Utility Building H8-Boutique Hotel
03 06/12/2023
MEDITERRANEAN-NORTH COAST, EGYPT BOILERS ELECTRICAL PANEL
02 Drawn :
Eng.Karim Galal
First issued REV. NO 0