Tawaran Dinkes
Tawaran Dinkes
Tawaran Dinkes
P L T N
3.00 V = 0.10 x 0.00 x 0.00 x 4.00
= 0.00 m3
= 0.00 m3 = 0.00 m3
3.00
--- TAPAK PONDASI
= 0.00 m3
2.00
= 0.00 m2
0.10
V = 0.00 x 0.00 x 4.00 x 4.00
= 0.00 m2
--- PONDASI MENERUS
0.2
--- GALIAN TANAH
0.10
0.50
0.10
= 5.15 m3
--- PONDASI
0.25
V 0.50 + 0.25
= x 0.60 x 73.5
2
= 16.54 m3
= 29.40 M2
= 1.89 m3 = 50.4 M2
0.15
= 0.54 m3 = 7.2 M2
0.30
= 0.00 m3 = 0.0 M2
Vt = 2.80 m3
= 0.00 m3 = 0.0 M2
= 0.00 m3 = 0.0 M2
Vt = 34.13 m'
= 0 m2
2.00
Galian Tanah
--- PEKERJAAN PINTU & JENDELA
V = 0.49 x 0.30 x 84.87
PINTU P.1
= 12.48 m3
Kusen
V = 2.16 x 2.00 + 1.72 x 1.00 0.30 Dinding saluran
= 10.08 m2
= 2.12 m3
Plesteran
3.715
V = 0.64 x 84.87
1.72
= 54.32 m2
Jendela
Kusen
V = 1.62 x 3.00 + 0.88 x 2.00
= 6.62 x 1.00
= 6.62 m'
1.62
Kaca
V = 1.50 x 0.76 x 1.00
= 1.14 m2
0.88
Bovenly
Kusen
V = 0.70 x 2.00 + 0.50 x 2.00
0.5
= 2.40 x 1.00
= 2.40 m'
Kaca
0.7
V = 0.58 x 0.38 x 1.00
= 0.22 m2
Ventilasi
Kusen
V = 1.50 x 2.00 + 0.60 x 2.00
0.6
= 4.20 x 1.00
= 4.20 m'
Kaca
1.5
V = 1.38 x 0.48 x 1.00
= 0.66 m2
Dinding Kaca
Kusen
0.35
V = 5.30 x 3.00 + 1.10 x 7.00
0.35
= 23.60 x 1.00
= 23.60 m'
1.95
Kaca
V = 0.98 x 5.18 x 1.00
5.30
= 5.08 m2
Luasan
1.95
V = 5.30 x 1.10 x 2.00
= 11.66 m2
0.35
0.35
0.55
0.55
1.10
1.44
V - + - V 2.9 + 1.4
= x 4.47 x 2 = x 1.58 x 2
4.47 2.00 1.58 2.00
= - m2 = 7 m2
2.92
6.1
V - +
= x 3.95 x 2 2.86
3.95 2.00
= - m2 V 5.7 + 2.9
= x 1.58 x 1
1.58 2.00
0
= 7 m2
5.69
V - + -
= x 4.77 x
4.77 2.00 V = 3.84 x 1.44 x 2.00
= - m2 = 11.06
Vt = 25
1.44
V = 8.45 x 5.8
5.8 V = 6.65 x 3.84
= 24.505 3.84
= 12.77
samping kiri
V = 2 x 1.75
1.75
= 3.50
2.5
depan/ belankanVt = 3.50 m2 2
V 10.75 + 2.5
= x 4.77 x 2 2
4.77 2.00 7
= 7
= 63 m2
--- LANGIT-LANGIT
10.75
V = 12.51 x - = - m2
V = = - m2
= - m2
Galian tanah
V = 5.36 x 4.63
2.68 2.68 V = 0.70 x 0.70 x 6.30
= 12.41 2
1.50 = 3.09 m3
24.8
Urugan pasir
= 1.42 m3
0.60
Sloof
0.50
0.10
Kolom
= 0.34 m3
--- DAK ATAP WC
Balok
= 0.60 m3
0.15
Dinding Wc
V = 6.30 x 3.75
Luas pengurang
= 2.72
= 0.60
Penutup lantai
V = 2.22 x 2.00
= 4.44 m2
Dinding keramik
= 9.28 m2
191
8.00
0.00
2.00
RINCIAN PERHITUNGAN VOLUME TERPASANG
A. NAMA PEKERJAAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2021
E NO. SUB PEKERJAAN : 1
F. NAMA SUB PEKERJAAN :
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN :
GAMBAR
610 40
136 40
746 56
136
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
1
1 Lantai Kerja
#REF!
Tebal = 0.08 m
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
0
#REF!
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
COR BETON
0.2
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
3
3 Cor Beton Untuk Celter
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
Tebal = 0.20 m
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
20 Canstin
25
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
Tebal = m
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
A B
20 30 30 30 30 15
155
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
Tebal = m
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
Stepnosing
Keramik 30/30
Keramik Difable
Stepnosing
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
9 Ubin Difable
9 Ubin Difable
Untuk Pedestrian Bagian Depan
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
20 Canstin
25
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
Tebal = m
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
11 Pas. GrassBlock
11 Pas. GrassBlock
Untuk Pedestrian Bagian Depan
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
GAMBAR
VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G
Tebal = 0.065 m
Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur
1. PEKERJAAN TANAH
lantai 5.49
3. 2 Pas. Pondasi Batu Kali / Belah, Campuran 1 PC : 4 Ps 73.50 0.43 0.60 18.74 m3
pek pintu
0.18
0.31
Kaca 9.72
5. PEKERJAAN BETON
Sloof 15/20
7. 12 Membuat Beton Mutu f'c = 19,3 Mpa menggunakan molen 73.50 0.15 0.20 2.21 M3
KOLOM 20/20
BALOK 15/20
6.06
Hal. 12
A
KODE URAIAN PEKERJAAN
Panjang Lebar Tinggi Unit Luas Penampang VOLUME satuan
7.97
12.50
74.05
1.32
besi
Hal. 13
REKAPITULASI
KEGIATAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan
Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
JUMLAH HARGA
BAB URAIAN BOBOT (%)
(Rp.)
TERBILANG : tiga ratus enam puluh satu juta tujuh ratus sembilan puluh lima ribu rupiah
AYUB ZAKARIA
DIREKTUR
Hal. 14
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
JUMLAH HARGA
KODE URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN (Rp.) SATUAN (Rp.)
I. PEKERJAAN PERSIAPAN
JUMLAH 8,386,764.22
7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen pondasi M3 18.96 1,020,499.47 19,348,669.95
JUMLAH 30,609,677.80
7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 1.89 1,020,499.47 1,928,744.00
7. 50 Bekisting kolom beton biasa menggunakan Kayu Papan 3/20 Cm M2 50.40 132,265.11 6,666,161.54
PEKERJAAN SLOOF 15 X 20
7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 2.21 1,020,499.47 2,255,303.83
7. 49 Bekisting fondasi dan sloof beton biasa menggunakan Plywood 12 mm M2 29.40 244,133.59 7,177,527.55
PEKERJAAN BALOK 15 X 20
7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 2.21 1,020,499.47 2,255,303.83
7. 51 Bekisting Balok beton biasa menggunakan Kayu Papan 3/20 Cm M2 29.40 143,862.59 4,229,560.15
JUMLAH 36,307,982.23
JUMLAH 65,747,647.85
6. 1 Pembuatan dan Pas. Kusen Pintu dan Kusen Jendela, Kayu Klas II M3 0.18 8,524,424.45 1,534,396.40
6. 5 Pembuatan dan Pas. Daun Pintu Panel, Kayu Klas II M2 12.18 737,112.74 8,978,033.17
--- Pintu Terali Besi Hollow jendela Unit 8.00 550,000.00 4,400,000.00
--- Pas. Kusen dan Jendela Aluminium jendela kamar Unit 1.00 1,550,000 1,550,000.00
--- Pas. Kusen dan Jendela Aluminium jendela 1 Unit 4.00 1,550,000 6,200,000.00
--- Pas. Kusen dan Jendela Aluminium jendela 2 Unit 2.00 1,550,000 3,100,000.00
--- Pas. Kusen dan Jendela Aluminium bovenli Unit 3.00 1,550,000 4,650,000.00
JUMLAH 32,862,429.57
Hal. 15
12. 8 Pas. Kait Angin Kuningan Bh 12.00 70,587.00 847,044.00
JUMLAH 7,259,015.28
7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 6.05 1,020,499.47 6,174,021.79
JUMLAH 25,123,940.20
Instalasi Listrik ( Termasuk Biaya Pasang kabel Dan Pipa ) titik 21.00 143,500.00 3,013,500.00
JUMLAH 6,438,500.00
9. 8 Pemasangan rangka besi hollow 1X40,40.2 mm, modul 60 cm x 60 cm, untuk plafon M2 70.43 116,972.25 8,238,355.57
JUMLAH 14,321,376.68
8. 4 Pas. Atap Genteng Metal color 2 X 4 (0,30 mm) atap Pelana M2 83.00 112,803.50 9,362,690.50
8. 26 Pemasangan atap pelana rangka atap Baja ringan canai dingin dengan Profil C.75.75 M2 83.00 205,522.97 17,058,406.51
JUMLAH 29,923,881.14
7. 51 Bekisting Balok beton biasa menggunakan Kayu Papan 3/20 Cm M2 22.80 143,862.59 3,280,067.05
JUMLAH 6,151,444.31
10. 13 Pas. Pipa GIP dia. 1/2" M' 30.00 64,308.86 1,929,265.80
10. 26 Pas. Pipa PVC Tipe AW Dia. 4" M' 20.00 102,757.68 2,055,153.60
10. 27 Pas. Bak Cuci Piring Stainless Steel Bh 1.00 409,722.00 409,722.00
10. 29 Pas. Kran Dia. 3/4" atau 1/2" Bh 6.00 61,914.28 371,485.68
10. 31 1 Bh Septiktank 1,5 x 2,0 m dan Resapan Unit 1.00 4,274,962.38 4,274,962.38
JUMLAH 20,367,624.52
--- Pembuatan Tower Air + Pengecatan & Pemasangan Tinggi : 5 m' Unit 1.00 8,400,000.00 8,400,000.00
JUMLAH 10,300,000.00
14. 9 Pengecatan Tembok Baru ( 1 Sealer, 1 Cat Dasar, 2 Cat Penutup ) Setara Jotun => Exterior M2 541.26 48,743.79 26,383,063.78
14. 10 Pengecatan Tembok Baru ( 1 Plamir, 1 Cat Dasar, 2 Cat Penutup ) Setara Jotun => Interior M2 70.43 31,343.14 2,207,497.35
Hal. 16
JUMLAH 28,590,561.13
--- Pekerjaan Penggandaan laporan, cetak foto, back up data, as build drawing Ls 1.00 4,250,000.00 4,250,000.00
JUMLAH 6,513,700.49
AYUB ZAKARIA
DIREKTUR
Hal. 17
DATA PERALATAN
AYUB ZAKARIA
DIREKTUR
KEPEMILIKAN/STATUS
Milik Sendiri
Sewa
Sewa
Milik Sendiri
Milik Sendiri
Milik Sendiri
DATA PERSONIL INTI
AYUB ZAKARIA
DIREKTUR
SERTIFIKAT/
IJAZAH
SERTIFIKAT
KEAHLIAN AHLI K3
KONTRUKSI MUDA
SERTIFIKAT
KETERAMPILAN
KERJA PELAKSANA
BANGUNAN GEDUNG
Sertifikat Keterampilan
Jaringan Tegangan
Rendah
Kepada Yth.
Pokja Pemilihan Konstruksi Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bang
- Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
di -
Muara Beliti
1. DATA PERUSAHAAN
1.1 Nama Perusahaan : CV.AZZUMAR
1.2 Alamat : Jl. Amula Rahayu No.072, Kel. Marga Rahayu, Kec. Lubuk
Linggau Selatan Ii, Kota Lubuk Linggau, Prov. Sumatera
Selatan
Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah
1.3 Sub. Bidang Pekerjaan : Dinas Puskesmas Air Beliti.
1.4 Kualifikasi : Gred 5
1.5 Kekayaan Bersih : 500,000,000.00
1.6 Proyek Yang Sedang : -
Ditangani
NO NAMA KEGIATAN MULAI RENCANA SELESAI NILAI ( Rp. )
1. GRED 1 - - 1
2. GRED 2 6 0.3 3
3. GRED 3 6 0.3 3
4. GRED 4 6 0.3 3
5. GRED 5 7 0.6 5
5. GRED 6 8 0.8 8
5. GRED 7 8 0.8
(
KEMAMPUAN KEUANGAN ( KK ) = FP X MK
= 7 X 300,000,000.00
= 2,100,000,000.00
SKK = KK - P
= 2,100,000,000.00 - 0
= 2,100,000,000.00
SKP = 5 - P
= 5 - 0
= 5
Kami menyadari jika memberikan keterangan - keterangan yang tidak benar, maka kami bersedia
dituntut dimuka hukum
CV.AZZUMAR
AYUB ZAKARIA
DIREKTUR
Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan
mbangunan Rumah Dinas Puskesmas Air Beliti.
NILAI ( Rp. )
KP
1
3
3
3
5
8
8 ATAU
1.2 N )
JADWAL PELAKSANAAN
Time schedule / Kurva S
Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah
KEGIATAN :
Dinas Puskesmas Air Beliti.
Waktu Pelaksanaan
No. Uraian Kegiatan Bobot Bulan Ke. I Bulan Ke. II Bulan Ke. III Bulan Ke. IV Bulan Ke. V
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
PEKERJAAN PELAKSANAAN
MASA PEMELIHARAAN
PEKRJAAN GALIAN TANAH 9.31 4.66 4.66
7.64 7.64
PEKRJAAN PASANGAN PENUTUP LANTAI
1.96 1.96
PEKRJAAN PASANGAN ELEKTRIKAL
4.35
PEKRJAAN PASANGAN LANGIT LANGIT 4.35
4.55 4.55
PEKRJAAN PASANGAN ATAP 9.10
1.87
PEKRJAAN PASANGAN ATAP TERAS 1.87
6.19
PEKERJAAN PASANGAN SANITASI 6.19
3.13
PEKERJAAN PEMBUATAN TOWER AIR 3.13
4.35 4.35
PEKERJAAN PENGECATAN 8.69
1.98
PEKERJAAN LAIN-LAIN 1.98
Jadwal Rencana Kegiatan 100 2.55 4.66 4.66 5.52 5.52 6.66 6.66 6.66 4.55 6.42 5.00 7.21 7.64 6.31 6.19 4.35 4.35 3.13 1.98 0.00
Kumulatif 2.55 7.21 11.86 17.38 22.90 29.56 36.23 42.89 47.44 53.86 58.86 66 73.70 80.01 86.20 91 94.89 98.02 100.00 100
YAKUB ZAKARIA
DIREKTUR