--- PEKERJAAN TANAH --- GALIAN TANAH

P L T N
3.00 V = 0.10 x 0.00 x 0.00 x 4.00

= 0.00 m3

--- URUGAN PASIR --- URUGAN PASIR DIBAWAH LANTAIBANGUNANDANRABAT


3.00
V = 0.10 x 0.00 x 0.00 x 4.00 Lantai Banunan = x 0.08
0.00
12.00
= 0.00 m3 = 0 m3

3.00 --- LANTAI KERJA Lantai Rabat = x 0.08

V = 0.10 x 0.00 x 0.00 x 4.00 = 0 m3

= 0.00 m3 = 0.00 m3
3.00
--- TAPAK PONDASI

V = 0.00 x 0.00 x 0.00 x 4.00

= 0.00 m3
2.00

1.00 3.60 3.60 3.60 3.60 3.60


--- KOLOM PEDESTAL

V = 0.00 x 0.00 x 0.00 x 4.00


19.00
= 0.00 m3

--- BEKISTINK TAPAK PONDASI

V = 0.00 x 0.20 x 4.00 x 4.00

= 0.00 m2

--- BEKISTIN KOLOM PEDESTAL

0.10
V = 0.00 x 0.00 x 4.00 x 4.00

= 0.00 m2
--- PONDASI MENERUS

0.2
--- GALIAN TANAH

V = 73.50 x 0.70 x 0.7


0.40
= 36.01 m3

--- URUGAN PASIR


0.05
0.05 0.1
V = 73.50 x 0.70 x 0.1

0.10

0.50

0.10
= 5.15 m3

--- PONDASI

0.25
V 0.50 + 0.25
= x 0.60 x 73.5
2

= 16.54 m3

--- LANTAI BANGUNAN & RABAT

V = 285 x 0.10 --- Galian Tanah = 36.02


--- Urugan Pasir = 5.15
= 28.54 m3

--- PEK. BETON STRUKTUR

Sloof --- SLOOF

V = 0.15 x 0.20 x 73.5


0.20
= 2.21 m3

--- BEKISTINK SLOOF

V = 0.20 x 2.00 x 73.5


0.15

= 29.40 M2

Kolom --- KOLOM --- BEKISTINK KOLOM


0.15
V = 0.15 x 0.15 x 3.50 x 24.00 V = 0.15 x 4.00 x 3.50 x 24.00

= 1.89 m3 = 50.4 M2
0.15

Kolom --- KOLOM --- BEKISTINK KOLOM


0.30
V = 0.30 x 0.30 x 2.00 x 3.00 V = 0.30 x 4.00 x 2.00 x 3.00

= 0.54 m3 = 7.2 M2
0.30

Balok pinggang --- BALOK PINGANG --- BEKISTINK BALOK


Balok Teras
V = 0.00 x 0.00 x 73.50 V = 0.00 x 2.00 x 73.50

= 0.00 m3 = 0.0 M2

Ring Balok --- BALOK --- BEKISTINK BALOK

V = 0.15 x 0.20 x 73.50 V = 0.20 x 2.00 x 73.50


0.20
= 2.21 m3 = 29.4 M2
0.15

--- DAK TERAS --- BEKISTINK BALOK --- DAK WC

V = x 4.40 x 0.10 x 2.00 V = 0.00 x 4.40 x 2.00 V = 22.50 x 0.10

= 0.00 m3 = 0.0 M2 = 2.25 m3

Vt = 2.80 m3

--- DAK KANOPY DIATAS JENDELA --- BEKISTINK BALOK


0.08
V = x 1.00 x 0.08 x 8.00 V = 0.00 x 1.00 x 8.00

= 0.00 m3 = 0.0 M2

--- DAK KANOPY DIATAS PINTU --- BEKISTINK BALOK

V = x 2.70 x 0.08 x 1.00 V = 0.00 x 2.70 x 1.00


0.50
0.15

= 0.00 m3 = 0.0 M2

--- KOLOM PRAKTIS --- KOLOM PRAKTIS

V = 7.00 x 3.50 V = 2.75 x 3.50

= 24.50 m' = 9.63 m'

Vt = 34.13 m'

--- PEK. PASANGAN DINDING


Acian Dinding Sisi luar
V = 56.00 x 3.50 V = 43.00 x 2.75 V = 60 x 3.50

= 196.0 m2 - 24.4 = 171.6 m2 = 118.3 m2 - 12.3 = 106.0 m2 = 210 - 18.84 =

3.00 Luas Pengurang Luas Pengurang Luas Pengurang

J1 = 1.62 x 0.88 x 8.00 P2 = 0.92 x 2.1 x 2.00 J1 = 1.62 x 0.88 x 8.00

= 11.4048 m2 = 3.864 m2 = 11.4 m2


3.00
J2 = 1.62 x 0.72 x 0.00 P3 = 0.7 x 2 x 4.00 J2 = 1.62 x 0.72 x 0.00
12.00
= 0 m2 = 5.6 m2 = 0 m2

3.00 P1 = 2.16 x 1.72 x 2.00 P4 = 0.7 x 2 x 2.00 P1 = 2.16 x 1.72 x 2.00

= 7.4304 m2 = 2.8 m2 = 7.43 m2

Bv = 1.4 x 0.5 x 8.00


3.00 Vt = 277.6 m2
= 5.6 m2

Lstr= 0.6 x 0.6 x 0.00

= 0 m2
2.00

1.00 3.60 3.60 3.60 3.60 3.60

--- PEK. SALURAN KELILING


19.00

Galian Tanah
--- PEKERJAAN PINTU & JENDELA
V = 0.49 x 0.30 x 84.87
PINTU P.1
= 12.48 m3
Kusen
V = 2.16 x 2.00 + 1.72 x 1.00 0.30 Dinding saluran

= 6.04 x 3.00 V = 0.30 x 2.00 x 84.87


0.1
= 18.12 m' = 50.92 m2
0.25

2.16 0.12 0.12


Kaca Lantai saluran
V = 2.10 x 1.60 x 3.00
V = 0.25 x 0.10 x 84.87
0.49

= 10.08 m2
= 2.12 m3

Plesteran
3.715
V = 0.64 x 84.87
1.72
= 54.32 m2

Jendela
Kusen
V = 1.62 x 3.00 + 0.88 x 2.00

= 6.62 x 1.00

= 6.62 m'
1.62
Kaca
V = 1.50 x 0.76 x 1.00

= 1.14 m2

0.88

Bovenly
Kusen
V = 0.70 x 2.00 + 0.50 x 2.00
0.5
= 2.40 x 1.00

= 2.40 m'

Kaca
0.7
V = 0.58 x 0.38 x 1.00

= 0.22 m2
Ventilasi
Kusen
V = 1.50 x 2.00 + 0.60 x 2.00
0.6
= 4.20 x 1.00

= 4.20 m'

Kaca
1.5
V = 1.38 x 0.48 x 1.00

= 0.66 m2

Dinding Kaca

Kusen
0.35
V = 5.30 x 3.00 + 1.10 x 7.00

0.35
= 23.60 x 1.00

= 23.60 m'
1.95
Kaca
V = 0.98 x 5.18 x 1.00

5.30
= 5.08 m2

Luasan
1.95
V = 5.30 x 1.10 x 2.00

= 11.66 m2

0.35

0.35
0.55

0.55

1.10

--- PEKERJAAN ATAP --- PEKERJAAN ATAP TERAS

1.44

V - + - V 2.9 + 1.4
= x 4.47 x 2 = x 1.58 x 2
4.47 2.00 1.58 2.00

= - m2 = 7 m2

2.92

6.1

V - +
= x 3.95 x 2 2.86
3.95 2.00

= - m2 V 5.7 + 2.9
= x 1.58 x 1
1.58 2.00
0
= 7 m2

5.69

V - + -
= x 4.77 x
4.77 2.00 V = 3.84 x 1.44 x 2.00

= - m2 = 11.06

Vt = 25

1.44

V = 8.45 x 5.8
5.8 V = 6.65 x 3.84
= 24.505 3.84
= 12.77

depan/ belanVt = 25 m2 2 depan/ belanVt = 13 m2 2


10.65
6.65
49.01 26
= 25.54
81.5

samping kiri

V = 2 x 1.75
1.75
= 3.50
2.5
depan/ belankanVt = 3.50 m2 2
V 10.75 + 2.5
= x 4.77 x 2 2
4.77 2.00 7
= 7
= 63 m2
--- LANGIT-LANGIT
10.75
V = 12.51 x - = - m2

V = = - m2

= - m2

--- PEKERJAAN WC --- PEKERJAAN WC

Galian tanah
V = 5.36 x 4.63
2.68 2.68 V = 0.70 x 0.70 x 6.30
= 12.41 2
1.50 = 3.09 m3
24.8
Urugan pasir

4.63 V = 0.70 x 0.10 x 6.30


1.80
= 0.44 m3

Pek. Pondasi menerus


--- PONDASI MENERUS
V 0.50 + 0.25
= x 0.60 x 6.30
2

= 1.42 m3
0.60
Sloof

V = 0.15 x 0.20 x 6.30


0.10
= 0.19 m3
0.10

0.50

0.10

Kolom

V = 0.15 x 0.15 x 3.75 x 4.00


0.25

= 0.34 m3
--- DAK ATAP WC
Balok

V = 0.15 x 0.15 x 6.30


0.10
= 0.14 m3

Plat dak atap wc


0.15
V = 1.50 x 4.00 x 0.10

= 0.60 m3
0.15

Dinding Wc

V = 6.30 x 3.75

= 23.63 m2 - 3.32 m2 = 20.31 m2

Luas pengurang

P2 = 0.80 x 1.70 x 2.00

= 2.72

Bv = 0.50 x 0.60 x 2.00

= 0.60

Penutup lantai

V = 2.22 x 2.00

= 4.44 m2

Dinding keramik

V = 5.30 x 1.75 x 2.00

= 9.28 m2
191

8.00

0.00

2.00
RINCIAN PERHITUNGAN VOLUME TERPASANG
A. NAMA PEKERJAAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2021
E NO. SUB PEKERJAAN : 1
F. NAMA SUB PEKERJAAN :
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN :

GAMBAR

610 40
136 40
746 56
136

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

1
1 Lantai Kerja
#REF!

Panjang = 746.00 m Panjang x Lebar x Tinggi


746.00 x 2.10 x 0.08 = 125.33 m3
Lebar = 2.10 m Volume Galian Tanah 125.33 m3

Tebal = 0.08 m

Sub Total Galian Tanah 125.33 M3

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2021
E NO. SUB PEKERJAAN :
F. NAMA SUB PEKERJAAN :
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

0
#REF!

Panjang = 746.00 m Panjang x Lebar x Tinggi


746.00 x 2.10 x 1.00 = 1,566.60 m3
Lebar = 2.10 m Volume Galian Tanah 1,566.60 m3

Panjang Plint 746.00 x 2.00 x 1.00 = 1,492.00 1,492.00 M'

Sub Total Galian Tanah 1,566.60 M2

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 3
F. NAMA SUB PEKERJAAN : Plesteran Acian
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

COR BETON

0.2

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

3
3 Cor Beton Untuk Celter

Panjang = 2.00 m Panjang x Lebar x Tinggi


2.00 x 2.00 x 0.20 = 4.00 m2
Lebar = 2.00 m Volume Galian Tanah 4.00 m2

Tebal = 0.20 m 12.00

Sub Total Galian Tanah 48.00 M2

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009
RINCIAN PERHITUNGAN VOLUME TERPASANG
A. NAMA PEKERJAAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2021
E NO. SUB PEKERJAAN :
F. NAMA SUB PEKERJAAN :
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

4 Membuat Beton Mutu f'c = 14,5 Mpa, Slump (120 + 20) mm


4 Membuat Beton Mutu f'c = 14,5 Mpa, Slump (120 + 20) mm
Untuk Pedestrian Bagian Depan

Panjang A = 61.94 m Panjang x Lebar x Tinggi


Panjang B = 23.50 m A 61.94 x 2.30 x 0.20 = 28.49 m3
B 23.50 1.50 0.20 = 7.05 m3
Lebar A = 2.30 m Volume Galian Tanah 35.54 m3
Lebar B = 1.50 m

Tebal = 0.20 m

Sub Total Galian Tanah 35.54 M3

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN :
F. NAMA SUB PEKERJAAN : Pas. Batu bata 1 bata. Ad. 1 pc : 4 pp (Cansteen)
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

20 Canstin
25

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

5 Pas. Batu bata 1 bata. Ad. 1 pc : 4 pp


5 Pas. Batu bata 1 bata. Ad. 1 pc : 4 pp
Untuk Pedestrian Bagian Depan

Panjang = 85.43 m Panjang x Lebar x Tinggi


746.00 x 0.25 x - = 186.50 m2
Lebar = 0.25 m Volume Galian Tanah 186.50 m2

Tebal = m

Sub Total Galian Tanah 186.50 M2

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 7
F. NAMA SUB PEKERJAAN : Pas. Lantai Keramik Uk. 30 cm X 30 cm (Lantai)
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

A B
20 30 30 30 30 15

155

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

7 Pas. Lantai Keramik Uk. 30 cm X 30 cm


7 Pas. Lantai Keramik Uk. 30 cm X 30 cm
Untuk Pedestrian Bagian Depan

Panjang A = 61.94 m Panjang x Lebar x Tinggi


Panjang B = 23.50 m A 61.94 x 2.30 x = 142.46 m2
B 23.50 1.50 = 35.25 m2
Lebar A = 2.30 m Volume Galian Tanah 177.71 m2
Lebar B = 1.50 m

Tebal = m

Sub Total Galian Tanah 177.71 M2

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009
RINCIAN PERHITUNGAN VOLUME TERPASANG
A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 8
F. NAMA SUB PEKERJAAN : Pas. Plint Lantai Nero Granite/Granito Uk. 10/60 (stepnosing)
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

8 Pas. Plint Lantai Nero Granite/Granito Uk. 10/60 (stepnosing)


8 Pas. Plint Lantai Nero Granite/Granito Uk. 10/60 (stepnosing)
Untuk Pedestrian Bagian Depan

Panjang (sisi luar) = 85.43 m Panjang x Lebar x Tinggi


Panjang (sisi dalam) = 63.43 m A 85.43 x - x = 85.43 m'
B 63.43 - = 63.43 m'
Volume Galian Tanah 148.86 m'

Sub Total Galian Tanah 148.86 M'

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 9
F. NAMA SUB PEKERJAAN : Ubin Difable (Cansteen)
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

Stepnosing

Keramik 30/30

Keramik Difable

Stepnosing

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

9 Ubin Difable
9 Ubin Difable
Untuk Pedestrian Bagian Depan

Panjang = 85.43 m Panjang x Lebar x Tinggi


746.00 x - x - = 746.00 m'
Volume Galian Tanah 746.00 m'

Sub Total Galian Tanah 746.00 M'

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 10
F. NAMA SUB PEKERJAAN : Pengecatan Tembok Baru (Cansteen)
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

20 Canstin
25

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

10 Pengecatan Tembok Baru


10 Pengecatan Tembok Baru
Untuk Pedestrian Bagian Depan

Panjang = 85.43 m Panjang x Lebar x Tinggi


746.00 x 0.40 x - = 298.40 m2
Lebar = 0.40 m Volume Galian Tanah 298.40 m2

Tebal = m

Sub Total Galian Tanah 298.40 m2

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 11
F. NAMA SUB PEKERJAAN : Pas. GrassBlock
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

11 Pas. GrassBlock
11 Pas. GrassBlock
Untuk Pedestrian Bagian Depan

Panjang = 83.93 m Panjang x Lebar x Tinggi


83.93 x - x - = 83.93 m'
Volume Galian Tanah 83.93 m'

Sub Total Galian Tanah 83.93 m'

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009

RINCIAN PERHITUNGAN VOLUME TERPASANG


A. NAMA PEKERJAAN : LANJUTAN PEMBUATAN LANDSCAPE KANTOR BUPATI MUSI RAWAS DI MUARA BELITI
B. LOKASI : KECAMATAN MUARA BELITI
C. SUMBER DANA : APBD KAB. MUSI RAWAS
D. TAHUN ANGGARAN : 2019
E NO. SUB PEKERJAAN : 12
F. NAMA SUB PEKERJAAN : Pengadaan dan Penanaman Rumput
G. NO. MATA PEMBAYARAN :
H. NAMA MATA PEMBAYARAN :
I. NO. ITEM PEKERJAAN

GAMBAR

VOLUME
NO KETERANGAN URAIAN TERPASAN SATUAN
G

12 Pengadaan dan Penanaman Rumput


12 Pengadaan dan Penanaman Rumput
Untuk Pedestrian Bagian Depan

Panjang = 83.93 m Panjang x N x Tinggi


A 83.93 x 2.00 x 0.07 = 10.91 m2
m2
N = 2.00 m Volume Galian Tanah 10.91 m2

Tebal = 0.065 m

Sub Total Galian Tanah 10.91 M2

Diperiksa Oleh, Diperiksa Oleh, Dibuat Oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DINAS PEKERJAAN UMUM CV. ARVIAN MURA ABADI KONSULTAN CV. PEDANG SAKTI
CIPTA KARYA, TATA RUANG DAN PENGAIRAN

Kgs.19840116
NIP. FERDIANSYAH,
201001 A.Md
1 015 AGUNG SUDARMO, ST INDRA DARMAWAN
Supervision Engineer Direktur

Diketahui/Disetujui Oleh, Disetujui Oleh,


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
DINAS PEKERJAAN UMUM DINAS PEKERJAAN UMUM
CIPTA KARYA, TATA RUANG DAN PENGAIRAN CIPTA KARYA, TATA RUANG DAN PENGAIRAN

A. INSAN SETIAWAN. B, ST, M.A.P ASFIRINO, ST


NIP. 19840912 201101 1009
A
KODE URAIAN PEKERJAAN
Panjang Lebar Tinggi Unit Luas Penampang VOLUME satuan

II. PEKERJAAN PELAKSANAAN

1. PEKERJAAN TANAH

2. 1 Menggali Tanah Biasa Sedalam 1 Meter 27.29 m3

Pondasi 73.50 0.50 0.70 25.72 m3

pondasi rabat 26.01 0.15 0.40 1.56 m3

bekisting pondasi 73.50 0.20 2.00 29.40

2. 9 Pengurugan Kembali Galian Tanah 6.82 m3

2. 11 Pengurugan dengan Pasir Urug 9.54 m3

Pondasi menerus 73.50 0.50 0.10 3.68 m3

pondasi rabat 26.01 0.15 0.05 0.20 m3

lantai 5.49

dalam rabat 24.00 0.15 0.05 0.18 m3

3. 2 Pas. Pondasi Batu Kali / Belah, Campuran 1 PC : 4 Ps 73.50 0.43 0.60 18.74 m3

3. PEKERJAAN PASANGAN DINDING 270.63


4. 3 Pas. Batu Bata Tbl. 1 Bata, 1 PC : 4 Pp 73.50 3.50 257.25 m2

dinding atap depan 6.30 1.60 10.08

kiri/kanan 1 6.50 1.50 2.00 19.50

kiri/kanan 2 4.50 1.00 4.50

kiri/kanan 3 2.00 0.80 1.60

luasan pengurang 22.30 m2

pintu 1 0.80 2.10 4.00 6.72 m2

pintu 2 0.70 2.10 2.00 2.94

pintu 3 1.20 2.10 1.00 2.52

jendela 1 0.52 1.50 4.00 3.12

jendela 2 0.98 1.50 2.00 2.94

jendela 3 1.50 1.94 1.00 2.91

bovenly 0.50 0.50 3.00 0.75

roster 0.20 0.20 10.00 0.40

pek pintu

Kusen pintu 0.06 0.12 2.10 10.00 0.15

0.06 0.12 0.80 4.00 0.02

0.06 0.12 1.20 1.00 0.01

0.18

Daun pintu 12.18

Kusen jendela 1 0.06 0.12 0.40 8.00 0.02

0.06 0.12 1.50 8.00 0.09

Kusen jendela 2 0.06 0.12 0.80 12.00 0.07

0.06 0.12 1.50 12.00 0.13

0.31

Kaca 9.72

5. PEKERJAAN BETON

Sloof 15/20

7. 12 Membuat Beton Mutu f'c = 19,3 Mpa menggunakan molen 73.50 0.15 0.20 2.21 M3

7. 34 BEKISTING 73.50 0.20 2.00 29.40 m2

KOLOM 20/20

MUTU BETON 0.20 0.20 3.50 9.00 1.26 m3

BEKISTING 0.20 4.00 3.50 9.00 25.20 m2

BALOK 15/20

BETON 73.50 0.15 0.20 2.21 m3

7. 29 Pembesian dgn Besi Polos atau Ulir kg

7. 17 Pemasangan 1 M2 Bekisting Untuk Balok m2

MUTU BETON LANTAI -

3.35 3.35 0.05 0.56

2.85 1.85 0.05 0.26

1.85 1.85 0.05 0.17

3.35 2.85 0.05 0.48

1.50 1.50 0.05 0.11

teras 5.07 3.60 0.05 0.91

7.97 0.05 0.40

15.17 0.05 0.76

Rabat 24.00 0.10 2.40

6.06

PEKERJAAN LANTAI KERAMIK 70.44

3.35 3.35 11.22

2.85 1.85 5.27

1.85 1.85 3.42

3.35 2.85 9.55

1.50 1.50 2.25

5.07 3.60 18.25

Hal. 12
A
KODE URAIAN PEKERJAAN
Panjang Lebar Tinggi Unit Luas Penampang VOLUME satuan

7.97

12.50

PLIN KERAMIK 3.35 3.35 2.00 10.05

2.85 1.85 2.00 6.55

1.85 1.85 2.00 5.55

3.35 2.85 2.00 9.05

1.50 1.50 2.00 4.50

5.07 3.60 2.00 12.27

5.07 2.00 10.14

7.97 2.00 15.94

74.05

7. PEKERJAAN PASANGAN LANGIT-LANGIT

8. PEKERJAAN PASANGAN SANITASI

10. 2 Pas. Kloset Jongkok Lokal - Bh

10. 8 Pas. Bak Fibreglass - Bh

10. 18 Pas. Pipa PVC Tipe AW Dia. 1/2" - M'

10. 24 Pas. Pipa PVC Tipe AW Dia. 3" - M'

10. 28 Pas. Kran Dia. 3/4" atau 1/2" - Bh

10. 29 Pas. Floor Drain - Bh

10. 30 1 Bh Septiktank 1,5 x 2,0 m dan Resapan - Unit

9. PEKERJAAN INSTALASI LISTRIK

--- Pas. Instalasi Listrik Titik Lampu - Ttk

--- Pas. Instalasi Listrik Saklar - Ttk

--- Pas. Instalasi Listrik Stop Kontak - Ttk

--- Pas. Pitting Lampu - Bh

--- Pas. Saklar Ganda - Bh

--- Pas. Saklar Tunggal - Bh

--- Pas. Lampu LED 20 watt - Bh

--- Pas. Jaringan Listrik PLN 6 Ampare + SLO - Ls

11. PEKERJAAN PASANGAN KUNCI GANTUNGAN & KACA

12. 1 Pas. Kunci Tanam Stainless - Bh

12. 4 Pas. Kunci Grendel Jendela - Bh

12. 5 Pas. Engsel Pintu - Bh

12. 6 Pas. Engsel Jendela Kupu-kupu - Bh

12. 8 Pas. Kait Angin Kuningan - Bh

12. 11 Pas. Pegangan Pintu/Door Holder - Bh

12. 14 Pas. Pegangan Jendela Kualitas Baik - Bh

PEMASANGAN ATAP DAK TERAS

Teras1 3.00 2.00 0.12 0.72

Teras2 2.50 2.00 0.12 0.60

1.32
besi

bekisting 9.50 0.20 12.00 22.80

III. PEKERJAAN LAIN - LAIN

Hal. 13
REKAPITULASI

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan
Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.

JUMLAH HARGA
BAB URAIAN BOBOT (%)
(Rp.)

I. PEKERJAAN PERSIAPAN 8,386,764.22 2.29

II. PEKERJAAN PELAKSANAAN


II.1 PEKRJAAN GALIAN TANAH 30,609,677.80 8.38
II.2 PEKERJAAN BETON 36,307,982.23 9.94
II.3 PEKRJAAN PASANGAN DINDING BATU BATA 65,747,647.85 17.99
II.4 PEKERJAAN PASANGAN PINTU DAN JENDELA 32,862,429.57 8.99
II.5 PEKERJAAN PASANGAN KUNCI GANTUNGAN & KACA 7,259,015.28 1.99
II.6 PEKRJAAN PASANGAN PENUTUP LANTAI 25,123,940.20 6.87
II.7 PEKRJAAN PASANGAN ELEKTRIKAL 6,438,500.00 1.76
II.8 PEKRJAAN PASANGAN LANGIT LANGIT 14,321,376.68 3.92
II.9 PEKRJAAN PASANGAN ATAP 29,923,881.14 8.19
II.10 PEKRJAAN PASANGAN ATAP TERAS 6,151,444.31 1.68
II.11 PEKERJAAN PASANGAN SANITASI 20,367,624.52 5.57
II.12 PEKERJAAN PEMBUATAN TOWER AIR 10,300,000.00 2.82
II.13 PEKERJAAN PENGECATAN 28,590,561.13 7.82

III. PEKERJAAN LAIN-LAIN 6,513,700.49 1.78

JUMLAH .................. 328,904,545.43 90.0

PPN 10% ............................... 32,890,454.54 10.0

JUMLAH TOTAL 361,795,000.0 100.00

TERBILANG : tiga ratus enam puluh satu juta tujuh ratus sembilan puluh lima ribu rupiah

Muara Beliti, 14 Juni 2021


CV.AZZUMAR
MENGETAHUI / MENYETUJUI :
KEPALA DPU CIPTA KARYA, TATA RUANG DAN PENGAIRAN
KAB. MUSI RAWAS

AYUB ZAKARIA
DIREKTUR

H. RISTANTO WAHYUDI, ST, MT


NIP. 19750424 199903 1 001

Hal. 14
DAFTAR KUANTITAS DAN HARGA

KEGIATAN : Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.

JUMLAH HARGA
KODE URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN (Rp.) SATUAN (Rp.)

I. PEKERJAAN PERSIAPAN

--- Papan Proyek Ls 1.00 250,000.00 250,000.00

1. 6 Pembuatan Gudang Semen dan Alat - Alat M2 6.00 956,127.37 5,736,764.22

--- biaya SMK Ls 1.00 2,400,000.00 2,400,000.00

JUMLAH 8,386,764.22

II. PEKERJAAN PELAKSANAAN

II.1 PEKRJAAN GALIAN TANAH

2. 1 Menggali Tanah Biasa Sedalam 1 Meter M3 27.29 81,362.50 2,220,382.63

2. 9 Pengurugan Kembali Galian Tanah M3 6.82 59,225.00 403,914.50

2. 12 Pengurugan dengan Pasir Urug M3 9.55 198,062.20 1,891,494.01

7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen pondasi M3 18.96 1,020,499.47 19,348,669.95

7. 42 Pemasangan 1 M3 bekisting untuk Pondasi M2 29.40 229,429.14 6,745,216.72

JUMLAH 30,609,677.80

II.2 PEKERJAAN BETON

PEKERJAAN KOLOM 15X15

7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 1.89 1,020,499.47 1,928,744.00

7. 37 Pembesian dgn Besi Polos Kg 413.34 15,451.52 6,386,731.28

7. 50 Bekisting kolom beton biasa menggunakan Kayu Papan 3/20 Cm M2 50.40 132,265.11 6,666,161.54

PEKERJAAN SLOOF 15 X 20

7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 2.21 1,020,499.47 2,255,303.83

7. 37 Pembesian dgn Besi Polos Kg 175.02 15,451.52 2,704,325.03

7. 49 Bekisting fondasi dan sloof beton biasa menggunakan Plywood 12 mm M2 29.40 244,133.59 7,177,527.55

PEKERJAAN BALOK 15 X 20

7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 2.21 1,020,499.47 2,255,303.83

7. 37 Pembesian dgn Besi Polos Kg 175.02 15,451.52 2,704,325.03

7. 51 Bekisting Balok beton biasa menggunakan Kayu Papan 3/20 Cm M2 29.40 143,862.59 4,229,560.15

JUMLAH 36,307,982.23

II.3 PEKRJAAN PASANGAN DINDING BATU BATA

4. 8 Pas. Batu Bata Tbl. 1/2 Bata, 1 PC : 4 Pp M2 270.63 109,402.28 29,607,539.04

5. 4 Plesteran 1 PC : 4 Ps, Tbl. 15 mm M2 541.26 66,770.33 36,140,108.82

JUMLAH 65,747,647.85

II.4 PEKERJAAN PASANGAN PINTU DAN JENDELA

6. 1 Pembuatan dan Pas. Kusen Pintu dan Kusen Jendela, Kayu Klas II M3 0.18 8,524,424.45 1,534,396.40

6. 5 Pembuatan dan Pas. Daun Pintu Panel, Kayu Klas II M2 12.18 737,112.74 8,978,033.17

--- Pintu Terali Besi Hollow jendela Unit 8.00 550,000.00 4,400,000.00

--- Pas. Kusen dan Jendela Aluminium jendela kamar Unit 1.00 1,550,000 1,550,000.00

--- Pas. Kusen dan Jendela Aluminium jendela 1 Unit 4.00 1,550,000 6,200,000.00

--- Pas. Kusen dan Jendela Aluminium jendela 2 Unit 2.00 1,550,000 3,100,000.00

--- Pas. Kusen dan Jendela Aluminium bovenli Unit 3.00 1,550,000 4,650,000.00

--- Roster 20 x 20 Bh 10.00 50,000 500,000.00

--- Pas. Pintu wc Unit 2.00 975,000 1,950,000.00

JUMLAH 32,862,429.57

II.5 PEKERJAAN PASANGAN KUNCI GANTUNGAN & KACA

12. 1 Pas. Kunci Tanam Stainless Bh 5.00 411,964.50 2,059,822.50

12. 3 Pas. Kunci Kamar Mandi Bh 2.00 245,415.75 490,831.50

12. 4 Pas. Kunci Grendel Jendela Bh 12.00 26,703.00 320,436.00

12. 5 Pas. Engsel Pintu Bh 18.00 57,234.35 1,030,218.30

12. 6 Pas. Engsel Jendela Kupu-kupu Bh 12.00 26,628.25 319,539.00

Hal. 15
12. 8 Pas. Kait Angin Kuningan Bh 12.00 70,587.00 847,044.00

12. 14 Pas. Pegangan Jendela Kualitas Baik Bh 6.00 49,110.75 294,664.50

12. 21 Pas. Kaca Ryband / Buram Tbl. 5 mm M2 9.72 195,109.00 1,896,459.48

JUMLAH 7,259,015.28

II.6 PEKRJAAN PASANGAN PENUTUP LANTAI

7. 2 Membuat Beton Mutu f'c = 7,4 Mpa (K-80 s.d. K-100) menggunakan Molen M3 6.05 1,020,499.47 6,174,021.79

13. 3 Pas. Lantai Keramik Uk. 40 Cm X 40 Cm M2 70.43 231,276.39 16,288,796.15

13. 8 Pas. Plint Keramik 10/40 M' 74.05 35,936.83 2,661,122.26

JUMLAH 25,123,940.20

II.7 PEKRJAAN PASANGAN ELEKTRIKAL

--- Pas. Stop Kontak Bh 5.00 75,000.00 375,000.00

--- Pemasangan KWH Meter 6 Ampere Bh 1.00 1,925,000.00 1,925,000.00

--- Lampu Led 10 Watt Bh 9.00 97,000.00 873,000.00

--- Pemasangan Lampu SL 18 Watt Bh 2.00 19,000.00 38,000.00

--- Pas. Saklar Ganda Bh 4.00 42,000.00 168,000.00

--- Pas. Saklar Tunggal Bh 1.00 46,000.00 46,000.00

Instalasi Listrik ( Termasuk Biaya Pasang kabel Dan Pipa ) titik 21.00 143,500.00 3,013,500.00

JUMLAH 6,438,500.00

II.8 PEKRJAAN PASANGAN LANGIT LANGIT

9. 4 Langit-langit Gypsum Board, Tbl. 9 mm M2 70.43 54,563.54 3,842,910.12

9. 8 Pemasangan rangka besi hollow 1X40,40.2 mm, modul 60 cm x 60 cm, untuk plafon M2 70.43 116,972.25 8,238,355.57

9. 6 List Plapond Gypsum Profil M' 74.05 30,251.33 2,240,110.99

JUMLAH 14,321,376.68

II.9 PEKRJAAN PASANGAN ATAP

8. 4 Pas. Atap Genteng Metal color 2 X 4 (0,30 mm) atap Pelana M2 83.00 112,803.50 9,362,690.50

8. 26 Pemasangan atap pelana rangka atap Baja ringan canai dingin dengan Profil C.75.75 M2 83.00 205,522.97 17,058,406.51

8. 12 Pas. Nok Genteng Metal Color M' 11.15 95,445.40 1,064,216.21

6. 21 Pas. Kalsiplank L=20 M' 47.08 51,796.26 2,438,567.92

JUMLAH 29,923,881.14

II.10 PEKRJAAN PASANGAN ATAP TERAS

8. 20 Pas. Atap Alluminium / Zincalume warna (t.0,45mm) M2 1.32 140,835.67 185,903.08

7. 37 Pembesian dgn Besi Polos Kg 173.80 15,451.52 2,685,474.18

7. 51 Bekisting Balok beton biasa menggunakan Kayu Papan 3/20 Cm M2 22.80 143,862.59 3,280,067.05

JUMLAH 6,151,444.31

II.11 PEKERJAAN PASANGAN SANITASI

10. 4 Pas. Kloset Jongkok TOTO Bh 2.00 927,968.81 1,855,937.62

10. 9 Pas. Bak Fibreglass Bh 2.00 1,690,997.72 3,381,995.44

10. 13 Pas. Pipa GIP dia. 1/2" M' 30.00 64,308.86 1,929,265.80

10. 26 Pas. Pipa PVC Tipe AW Dia. 4" M' 20.00 102,757.68 2,055,153.60

10. 27 Pas. Bak Cuci Piring Stainless Steel Bh 1.00 409,722.00 409,722.00

--- Pembuatan meja beton Untuk Dapur Ls 1.00 6,000,000.00 6,000,000.00

10. 29 Pas. Kran Dia. 3/4" atau 1/2" Bh 6.00 61,914.28 371,485.68

10. 30 Pas. Floor Drain Bh 2.00 44,551.00 89,102.00

10. 31 1 Bh Septiktank 1,5 x 2,0 m dan Resapan Unit 1.00 4,274,962.38 4,274,962.38

JUMLAH 20,367,624.52

II.12 PEKERJAAN PEMBUATAN TOWER AIR

--- Pembuatan Tower Air + Pengecatan & Pemasangan Tinggi : 5 m' Unit 1.00 8,400,000.00 8,400,000.00

--- Bak Penampungan 1200 Ltr Bh 1.00 1,900,000 1,900,000.00

JUMLAH 10,300,000.00

II.13 PEKERJAAN PENGECATAN

14. 9 Pengecatan Tembok Baru ( 1 Sealer, 1 Cat Dasar, 2 Cat Penutup ) Setara Jotun => Exterior M2 541.26 48,743.79 26,383,063.78

14. 10 Pengecatan Tembok Baru ( 1 Plamir, 1 Cat Dasar, 2 Cat Penutup ) Setara Jotun => Interior M2 70.43 31,343.14 2,207,497.35

Hal. 16
JUMLAH 28,590,561.13

III. PEKERJAAN LAIN - LAIN

--- Pekerjaan Penggandaan laporan, cetak foto, back up data, as build drawing Ls 1.00 4,250,000.00 4,250,000.00

--- Pembersihan dan Pembulatan Ls 1.00 2,263,700.49 2,263,700.49

JUMLAH 6,513,700.49

Muara Beliti, 14 Juni 2021


CV.AZZUMAR
Diperiksa Oleh :
Kabid Bina Teknis Dinas PU Cipta Karya &
Tata Ruang Kabupaten Musi Rawas

AYUB ZAKARIA
DIREKTUR

RINI RAHMATINA , ST, MT. DWI HARTONO, ST.


Nip.19721011 200501 2 007 Nip. 19800309200801 1 003

Hal. 17
DATA PERALATAN

NO JENIS MERK/TYPE LOKASI KAPASITAS JUMLAH

1 Molen Beton Hercules Lubuklinggau 0.3-0.6 m3 2


2 Mobil Dump Truck Toyota Lubuklinggau 8 ton 1
3 Mobil Pick Up Suzuki Lubuklinggau 2 ton 2
4 Pompa Air Sanyo Lubuklinggau 1050 Lt/m 2
5 Genset Tiger Lubuklinggau 5000 Kva 1
6 Lori Artco Lubuklinggau 5

Muara Beliti, 14 Juni 2021


CV.AZZUMAR

AYUB ZAKARIA
DIREKTUR
KEPEMILIKAN/STATUS

Milik Sendiri
Sewa
Sewa
Milik Sendiri
Milik Sendiri
Milik Sendiri
DATA PERSONIL INTI

TINGKAT JABATAN PENGALAMAN


NO NAMA
PENDIDIKAN DALAM PEKERJAAN KERJA

Jufri S1 TEKNIK SIPIL Petugas Tenaga K3 3 TAHUN


1

2 Ali Syahbana S1 TEKNIK SIPIL Pelaksana 5 TAHUN

3 Prabu Vertiari S1 TEKNIK ELEKTRO Tenaga Teknis Plumbing 5 TAHUN

4 Hendi Zunifoso S1 TEKNIK ELEKTRO Tenaga Teknis Listrik 5 TAHUN

5 Kusnanto STM Juru Ukur 5 TAHUN

6 Ahmad Surya Nugraha SMA Tenaga Teknis Gedung 5 TAHUN

7 Ridha Hairi Saputra S1 Logistik 3 TAHUN

8 Olivia Mayola SMK Administrasi 3 TAHUN


Proyek/Keuangan

Muara Beliti, 14 Juni 2021


CV.AZZUMAR

AYUB ZAKARIA
DIREKTUR
SERTIFIKAT/
IJAZAH

SERTIFIKAT
KEAHLIAN AHLI K3
KONTRUKSI MUDA

SERTIFIKAT
KETERAMPILAN
KERJA PELAKSANA
BANGUNAN GEDUNG

Sertifikat Keterampilan
Jaringan Tegangan
Rendah

iti, 14 Juni 2021


PERHITUNGAN ISIAN SISA KEMAMPUAN NYATA ( SKN ) DAN SKP
BIDANG JASA KONSTRUKSI
Lubuklinggau, 14 Juni 2021

Kepada Yth.

Pokja Pemilihan Konstruksi Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bang
- Belanja Modal Bangunan Kesehatan - Pembangunan Rumah Dinas Puskesmas Air Beliti.

di -
Muara Beliti

1. DATA PERUSAHAAN
1.1 Nama Perusahaan : CV.AZZUMAR
1.2 Alamat : Jl. Amula Rahayu No.072, Kel. Marga Rahayu, Kec. Lubuk
Linggau Selatan Ii, Kota Lubuk Linggau, Prov. Sumatera
Selatan
Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah
1.3 Sub. Bidang Pekerjaan : Dinas Puskesmas Air Beliti.
1.4 Kualifikasi : Gred 5
1.5 Kekayaan Bersih : 500,000,000.00
1.6 Proyek Yang Sedang : -
Ditangani
NO NAMA KEGIATAN MULAI RENCANA SELESAI NILAI ( Rp. )

J = 0 Buah P (I) = Rp.

NO KUALIFIKASI FAKTOR FP FAKTOR FL KP

1. GRED 1 - - 1
2. GRED 2 6 0.3 3
3. GRED 3 6 0.3 3
4. GRED 4 6 0.3 3
5. GRED 5 7 0.6 5
5. GRED 6 8 0.8 8
5. GRED 7 8 0.8
(

N : JUMLAH PAKET SESAAT

3. SISA KEMAMPUAN NYATA ( SKN )


- MENGHITUNG SKK / SKP
MODAL KERJA ( MK ) = FL X KB
= 0.6 X 500,000,000.00
= 300,000,000.00

KEMAMPUAN KEUANGAN ( KK ) = FP X MK
= 7 X 300,000,000.00
= 2,100,000,000.00

SKK = KK - P
= 2,100,000,000.00 - 0
= 2,100,000,000.00

SKP = 5 - P
= 5 - 0
= 5

Kami menyadari jika memberikan keterangan - keterangan yang tidak benar, maka kami bersedia
dituntut dimuka hukum

CV.AZZUMAR

AYUB ZAKARIA
DIREKTUR
Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan
mbangunan Rumah Dinas Puskesmas Air Beliti.

anja Modal Bangunan Kesehatan - Pembangunan Rumah

NILAI ( Rp. )

KP

1
3
3
3
5
8
8 ATAU
1.2 N )
JADWAL PELAKSANAAN
Time schedule / Kurva S
Belanja Modal Gedung dan Bangunan - Belanja Modal Gedung dan Bangunan - Belanja Modal Bangunan Kesehatan - Pembangunan Rumah
KEGIATAN :
Dinas Puskesmas Air Beliti.

Waktu Pelaksanaan
No. Uraian Kegiatan Bobot Bulan Ke. I Bulan Ke. II Bulan Ke. III Bulan Ke. IV Bulan Ke. V
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

PEKERJAAN PERSIAPAN 2.55 2.55

PEKERJAAN PELAKSANAAN

MASA PEMELIHARAAN
PEKRJAAN GALIAN TANAH 9.31 4.66 4.66

PEKERJAAN BETON 11.04 5.52 5.52

PEKRJAAN PASANGAN DINDING BATU BATA 19.99 6.6633333 6.66 6.6633333

9.99 4.995 4.995


PEKERJAAN PASANGAN PINTU DAN JENDELA
PEKERJAAN PASANGAN KUNCI GANTUNGAN & KACA 2.21 2.21

7.64 7.64
PEKRJAAN PASANGAN PENUTUP LANTAI
1.96 1.96
PEKRJAAN PASANGAN ELEKTRIKAL
4.35
PEKRJAAN PASANGAN LANGIT LANGIT 4.35
4.55 4.55
PEKRJAAN PASANGAN ATAP 9.10
1.87
PEKRJAAN PASANGAN ATAP TERAS 1.87
6.19
PEKERJAAN PASANGAN SANITASI 6.19
3.13
PEKERJAAN PEMBUATAN TOWER AIR 3.13
4.35 4.35
PEKERJAAN PENGECATAN 8.69

1.98
PEKERJAAN LAIN-LAIN 1.98

Jadwal Rencana Kegiatan 100 2.55 4.66 4.66 5.52 5.52 6.66 6.66 6.66 4.55 6.42 5.00 7.21 7.64 6.31 6.19 4.35 4.35 3.13 1.98 0.00
Kumulatif 2.55 7.21 11.86 17.38 22.90 29.56 36.23 42.89 47.44 53.86 58.86 66 73.70 80.01 86.20 91 94.89 98.02 100.00 100

Musi Rawas, 14 Juni 2021


CV.AZZUMAR

YAKUB ZAKARIA
DIREKTUR