0 25-JUL-2017 FOR CONSTRUCTION J.J.KIM H.Y.LEE H.Y.LEE Y.H.KIM

REV DATE DESCRIPTION PREP CHKD APPD APPD

OWNER OWNER’S CONSULTANT

VIETNAM OIL AND GAS GROUP (PVN) FICHTNER PVPOWER PCC


EPC CONTRACTOR EPC CONSTRACTOR’S CONSULTANT

PETROVIETNAM CONSTRUCTION JOINT


STOCK CORPORATION (PVC) WORLEYPARSONS
POWER ISLAND PACKAGE SUPPLIER

SOJITZ CORPORATION DAELIM INDUSTRIAL CO., LTD.


PROJECT TITLE

THAI BINH 2 THERMAL POWER PLANT 2 x 600MW

WORK TITLE / DRAWING / DOCUMENT TITLE

INSTRUMENT LOOP DIAGRAM FOR BOP(COMMON)


FUNCTION NAME SIGN DATE

DRWN J.J.KIM 25-JUL-2017

CHKD H.Y.LEE 25-JUL-2017

APPD H.Y.LEE 25-JUL-2017

25-JUL-2017
APPD Y.H.KIM

DOCUMENT No: TB2-SDC-00100-I-G1-DLD-0001 SHEET No: SCALE -


SHEET NO.
C01 OF C01

CONTENTS

DESCRIPTION SHEET NO.

COMMON
MASTER INDEX
GENERAL NOTE 0G01 ~ 0G10
INDEX 0I01 ~ 0I05

FLOW TRANSMITTER 0FT01


FLOW CONTROL V/V 0FCV01
LEVEL TRANSMITTER 0LT01 ~ 0LT02
LEVEL CONTROL V/V 0LCV01 ~ 0LCV10
PRESSURE TRANSMITTER 0PT01 ~ 0PT10
PRESSURE CONTROL V/V 0PCV01
TEMPERATURE ELEMENT 0TE01
TEMPERATURE CONTROL V/V 0TCV01 ~ 0TCV02
GAS DETECTOR 0GD01 ~ 0GD03
ON-OFF V/V 0XV01 ~ 0XV02
MOV 0MV01 ~ 0MV09

PKG.

AIR COMPRESSOR 0PKG01 ~ 0PKG04


INTAKE 0PKG06 ~ 0PKG10
CHLORINATION 0PKG11 ~ 0PKG12
RAW WATER 0PKG16 ~ 0PKG20
WEATHER STATION 0PKG26 ~ 0PKG27
H2 GENERATION 0PKG31 ~ 0PKG32
GPS 0PKG41
HVAC 0PKG46 ~ 0PKG52
UMMS 0PKG56 ~ 0PKG61
AMMONIA SHELTER 0PKG66 ~ 0PKG69
SUMP 0PKG71 ~ 0PKG80C
PDP 0PKG81 ~ 0PKG89
MASTER INDEX OF INSTRUMENT LOOP DIAGRAM - THAI BINH 2 PROJECT

Package No. Package Description Supplier Name Doc. No. Doc. Description
- Balance of Plant (BOP) SDC TB2-SDC-00100-I-G1-DLD-0001 INSTRUMENT LOOP DIAGRAM FOR BOP(COMMON)
TB2-SDC-01100-I-G1-DLD-1001 INSTRUMENT LOOP DIAGRAM FOR BOP(UNIT #1)
16-101 Boiler and Boiler BOP BWBC TB2-SDC-01100-I-M1A-DLD-5001 INSTRUMENT LOOP DIAGRAM FOR BOILER(FIELD INSTRUMENT)
TB2-SDC-01100-I-M1A-DLD-5002 INSTRUMENT LOOP DIAGRAM FOR BOILER(PNEUMATIC VALVE)
TB2-SDC-01100-I-M1A-DLD-5003 INSTRUMENT LOOP DIAGRAM FOR BOILER(MOTORIZED VALVE)
TB2-SDC-01100-I-M1A-DLD-5004 INSTRUMENT LOOP DIAGRAM FOR BOILER(LCP OR JB OF EQUIPMENTS)
LOOP WIRING DIAGRAM - NO.1 SOOTBLOWER LOCAL CONTROL PANEL UNIT1
TB2-SDC-01HCB-I-M1A-DLD-5005
SOOTBLOWER SYSTEM
LOOP WIRING DIAGRAM - NO.2 SOOTBLOWER LOCAL CONTROL PANEL UNIT1
TB2-SDC-01HCB-I-M1A-DLD-5006
SOOTBLOWER SYSTEM
17-109 Intake Facility Ilshin TB2-SDC.VP109-00PBB-I-M4-DLD-0067 INSTRUMENT LOOP DIAGRAMS FOR CW INTAKE FACILITY
29-124 Selective Catalystic Reduction(SCR) S&TC TB2-SDC.VP124-00CGA-I-M1A-DLD-0101 Instrument loop wiring diagram for SCR
16-101 Flue Gas Desulferization(FGD) BWBC/KAIDI TB2-SDC.VP101-01100-I-M10-DLD-0076 FGD PLANT UNIT 1 INSTRUMENT LOOP DIAGRAM
TB2-SDC.VP101-00100-I-M10-DLD-0077 FGD PLANT COMMON INSTRUMENT LOOP DIAGRAM
16-101 Ash Handling System BWBC TB2-SDC.VP101-01100-I-M12-DLD-5001 FLY AND BOTTOM ASH HANDLING SYSTEM INSTRUMENT LOOP DIAGRAM
TB2-SDC.VP101-01100-I-M12-DLD-5002 ASH DISCHARGE PUMP HOUSE INSTRUMENT LOOP DIAGRAM
TB2-SDC.VP101-01100-I-M12-DLD-5003 ASH HANDLING COMPRESSOR HOUSE INSTRUMENT LOOP DIAGRAM
16-101 Auxiliary Boiler BWBC TB2-SDC.VP101-00100-I-M1A-DLD-5101 AUXILIARY BOILER SYSTEM INSTRUMENT LOOP DIAGRAM
28-115 Chemical Injection System Yujin ChemTech LOOP WIRING DIAGRAM FOR AMMONIA SHELTER FOR CHEMICAL INJECTION
TB2-SDC.VP115-00GNN-I-M17-DLD-0103
SYSTEM
TB2-SDC.VP115-01GNN-I-M17-DLD-0104 LOOP WIRING DIAGRAM FOR UNIT#1 FOR CHEMICAL INJECTION SYSTEM
TB2-SDC.VP115-02GNN-I-M17-DLD-0105 LOOP WIRING DIAGRAM FOR UNIT#2 FOR CHEMICAL INJECTION SYSTEM
08-116 Gas Chlorination System Okamura TB2-SDC.VP116-00PBN-I-M4-DLD-0001 INSTRUMENT LOOP DIAGRAM FOR GASEOUS CHLORINATION SYSTEM
08-117 Water Treatment System Yujin ChemTech TB2-SDC.VP117-00GBK-I-M3-DLD-0064 Instrument Loop Diagrams for Water Treatment System
08-118 Waste Water Treatment System Yujin ChemTech TB2-SDC.VP118-00GNK-I-M3-DLD-0064 Instrument Loop Diagrams for Waste Water Treatment System
08-121 H2 Generation System Proton TB2-SDC.VP121-00QJA-I-M17-DLD-0001 Hydrogen Generation Plant Instrument Loop Diagram
01-125 Steam Turbine for BFP(BFPT) Dresser-Rand(Siemens) TB2-SDC.VP125-00100-I-M1B-DLD-0001 LOOP DIAGRAMS FOR TURBINE DRIVE ON BFP
29-126 Electrostatic Precipitator(ESP) Hamon TB2-SDC.VP126-00HDE-I-M9-DLD-0001 Instrument Loop Diagram for ESP
sheet 0G01 of 0G10

GENERAL NOTES

1. ABBREVIATION

-1 INSTRUMENT EQUIPMENT

C : COMMON

LCP : LOCAL CONTROL PANEL

MOV : MOTOR OPERATED VALVE

T : TRANSMITTER

NO : NORMAL OPEN

I/R : INTERPOSING RELAY

T/U : TERMINAL UNIT

-2 WIRE (CORE) COLOR IDENTIFICATION

BK : BLACK

WH : WHITE

RD : RED

BL : BLUE

BN : BROWN

GN : GREEN

GY : GREY

OR : ORANGE

YL : YELLOW

PU : PURPLE

VI : VIOLET

GND : GROUND

2. HIDDEN LINE IS SUPPLIED BY VENDOR

EX)

1) INSTRUMENT SUPPLIED BY VENDOR

2) CABLE CONNECTION BY VENDOR


sheet 0G02 of 0G10

3. NUMBERING PROCEDURE OF JUNCTION BOX & INSTRUMENT ENCLOSURE


1 1 LAB 01 GA 001

SEQUENCE NO. (001 ~ 999)

EQUIPMENT UNIT CODE

GA : INSTRUMENT JUNCTION BOX

GY : INSTRUMENT ENCLOSURE

SEQUENCE NO. (01 ~ 99)

SYSTEM CODE (REF. NUMBERING PROCEDURE APP.2)

AREA NO.

0 : SWITCHYARD

1 : TURBINE BUILDING

2 : BOILER BUILDING

3 : CONTROL BUILDING

4 : ESP/ID FANS/FGD AREA GYPSUM HANDLING/STACK/SCR

5 : COAL/LIMESTONE/FUEL OIL/ AMMONIA HANDLING AREAS

6 : ASH HANDLING AREA

7 : WATER TREATMENT AREA

8 : COOLING WATER AREA (CIRCULATING WATER INTAKE/DISCHARGE)

9 : MISELLANEOUS (OFFSITES, JETTY & BALANCE OF PLANT)

UNIT NO.

0 : COMMON TO THAI BINH 2 THERMAL POWER PROJECT UNIT 1 AND 2

1 : THAI BINH 2 THERMAL POWER PROJECT UNIT 1

2 : THAI BINH 2 THERMAL POWER PROJECT UNIT 2


sheet 0G03 of 0G10

4. NUMBERING PROCEDURE OF CABLE


1 1 LAB 5 010
SEQUENCE NO. (001 ~ 999)

SIGNAL CABLE APPLICATION


0 : MV POWER (400V < VOLTAGE <=10KV)
1 : LV POWER (230V < VOLTAGE <=400V)
2 : LV SERVICE (LV CABLES FOR SERVICE <=230V)
3 : DC POWER
4 : DISCRETE SIGNAL
5 : ANALOG SIGNAL
6 : COMMUNICATION (ETHERNET, RS-485, etc)
7 : FIBER
8 : PROTECTIVE DEVICES
(PROTECTIVE RELAYS CIRCUITS, CT'S, PT'S, etc)
## : OTHER (TELEPHONE, PAGING, SECURITY, FIRE ALARM, etc)

SYSTEM CODE (REF. NUMBERING PROCEDURE APP.2)

AREA NO.

0 : SWITCHYARD
1 : TURBINE BUILDING
2 : BOILER BUILDING
3 : CONTROL BUILDING
4 : ESP/ID FANS/FGD AREA GYPSUM HANDLING/STACK/SCR
5 : COAL/LIMESTONE/FUEL OIL/ AMMONIA HANDLING AREAS
6 : ASH HANDLING AREA
7 : WATER TREATMENT AREA
8 : COOLING WATER AREA (CIRCULATING WATER INTAKE/DISCHARGE)
9 : MISELLANEOUS (OFFSITES, JETTY & BALANCE OF PLANT)

UNIT NO.

0 : COMMON TO THAI BINH 2 THERMAL POWER PROJECT UNIT 1 AND 2

1 : THAI BINH 2 THERMAL POWER PROJECT UNIT 1

2 : THAI BINH 2 THERMAL POWER PROJECT UNIT 2


sheet 0G04 of 0G10

5. JUNCTION BOX TERMINAL DETAIL

ANALOG & T/C JB GD, RTD & VIB. JB DISCRETE JB SOV JB


20-30 POLE 20-30 POLE 20-30 POLE 20-40 POLE
40-50 POLE 40-60 POLE 40-50 POLE

TB-1 TB-1 TB-1 TB-1


1 1 1 1
2 2 2 2
SH 3 SH 3
3 SH 3 JUMPER 4
4 4 4 (B.V) 5
SH 5 SH 6
5 6 5 7
6 SH 6 8
SH 7 SH 9
7 8 7 10
8 9 8 11
SH SH SH 12
9 10 9 13
10 11 10 14
SH 12 SH 15
11 SH 11 16
12 13 12 17
SH 14 SH 18
13 15 13 19
14 SH 14 20
SH 16 SH 21
15 17 15 22
16 18 16 23
SH SH SH 24
17 19 17
18 20 18
SH 21 SH
19 SH 19
20 22 20
SH 23 SH
24
SH
sheet 0G05 of 0G10

6. WIRE TAG DETAILS

1) WIRE TAGS SHALL BE PRINTED AND ATTACHED ON EACH WIRE.


FOR INSTALLATION DETAIL, REFER TO SHEET S-27 AND S-28 IN INSTRUMENT TYPICAL INSTALLATION
DRAWING, TB2-SDC-00100-I-G1-DID-0001.

2) WIRE TAGS SHALL BE NON-FLAMMABLE SLEEVE TUBES(HEAT SHRINKABLE TUBES).

3) WIRE TAGS SHALL BE INSERTED INTO EACH WIRE BEFORE TERMINAL LUG ATTACHED
AND TERMINAL CONNECTION.

4) WIRE TAGS SHALL BE PRINTED AS PER THE INSTRUCTIONS AS BELOW:

a) GENERAL
- WIRE TAGS SHALL BE PRINTED ACCORDING TO THE TERMINAL INFORMATION IN INSTRUMENT LOOP
DIAGRAMS AND ELECTRICAL CONNECTION DIAGRAMS(SUBMITTED BY ELEC. DEPARTMENT).

- SPARE CORES ALSO SHALL BE ATTACHED WITH WIRE TAGS AND INDICATED AS "SPARE"

b) FIELD INSTRUMENTS (INSTRUMENTS, VALVES)


- TERMINAL BLOCK NUMBER OR NAME SHALL BE INDICATED.

- EXAMPLE-1 : TRANSMITTERS SHALL BE PRINTED AS "+" AND "-" ON THE SLEEVES.

<WIRE TAG PRINTING>

TB+

TB-

- EXAMPLE-2 : VALVES SHALL BE PRINTED WITH TERMINAL BLOCK NO ON THE SLEEVES.

<WIRE TAG PRINTING>

TB-20

TB-02
TB-03

TB-05
TB-06
TB-07

TB-11
TB-12

TB-14
sheet 0G06 of 0G10

c) JUNCTION BOX OR LOCAL CONTROL CABINETS


- TERMINAL BLOCK NUMBER OR NAME WITH TERMINAL STRIP NUMBER SHALL BE INDICATED.

- EXAMPLE-1 : JUNCTION BOXES SHALL BE PRINTED WITH TERMINAL BLOCK NO. AND STRIP NO.
ON THE SLEEVES.

<WIRE TAG PRINTING> <WIRE TAG PRINTING>


(FIELD CABLE) (MULTI CABLE)
TB1-13 TB1-13

TB1-14 TB1-14
TB1-15 TB1-15

TB1-14 TB1-14
TB1-15 TB1-15
TB1-16 TB1-16

TB1-19 TB1-19
TB1-20 TB1-20

TB1-21 TB1-21

- EXAMPLE-2 : LOCAL CONTROL PANELS SHALL BE PRINTED WITH TERMINAL BLOCK NO. AND STRIP NO.
ON THE SLEEVES.

<WIRE TAG PRINTING>

TB5-X-25
TB5-X-26
TB5-X-27
TB5-X-28

TB5-X-29
TB5-X-30
TB5-X-31
TB5-X-32

TB5-X-34
TB5-X-35
TB5-X-36
TB5-X-37
TB5-X-38
TB5-X-39
TB5-X-40
TB5-X-41
sheet 0G07 of 0G10

d) DCS/PLC CONTROL CABINETS


- TERMINAL BLOCK NUMBER OR NAME WITH TERMINAL STRIP NUMBER SHALL BE INDICATED.

- EXAMPLE-1 : DCS CABINETS TO FIELD TERMINAL BLOCKS SHALL BE PRINTED WITH


TERMINAL BLOCK NO. AND STRIP NO. ON THE SLEEVES.

<WIRE TAG PRINTING>

1-C-S-52
1-C-S-53

1-C-S-55
1-C-S-56

1-C-S-58
1-C-S-59

1-D-S-73
1-D-S-74

1-D-S-76
1-D-S-77

- EXAMPLE-2 : DCS CABINETS FOR T/C WIRINGS DIRECT TO T/C INPUT MODULES SHALL BE PRINTED WITH
MODULE LOCATION NO, TERMINAL BLOCK NO, AND TB NO. ON THE SLEEVES.

<WIRE TAG PRINTING>

1-9-A / TB1-10
1-9-A / TB1-11
sheet 0G08 of 0G10

e) ELECTRICAL EQUIPMENT
- TERMINAL BLOCK NUMBER OR NAME WITH TERMINAL STRIP NUMBER SHALL BE INDICATED .
FOR CONTROL CABLE
FOR POWER CABLE, IT SHALL FOLLOW THE CABLE COLOR CODE WITH HEAT SHRINKABLE TUBE.

- EXAMPLE-1 : ELECTRICAL EQUIPMENT FOR POWER CABLE CONNECTION


HEAT SHRINKABLE TUBE SHALL BE INSTALLED AS PER COLOR CODE.

<POWER CABLE>

PHASE:A

PHASE:B

PHASE:C

PHASE:NEUTRAL

PHASE:PE

HEAT SHRINKABLE TUBE

- EXAMPLE-2 : ELECTRICAL CONTROL WIRINGS SHALL BE PRINTED WITH TERMINAL NO. ON WHITE SLEEVE
RED MARK-UP ON TERMINAL NO. SHALL BE PRINTED AS "TRIP" ON RED SLEEVE

<WIRE TAG PRINTING FOR CONTROL CABLE/WIRE>

XZ2:39 (WIRE NO.1)

XZ2:40 (WIRE NO.2)

TRIP XZ2:41 (WIRE NO.3)

TRIP XZ2:42 (WIRE NO.4)

XZ2:9 (WIRE NO.5)

XZ2:10 (WIRE NO.6)


sheet 0G09 of 0G10

7. ABB DCIS T/U TERMINATION DETAIL (NTAI06)

1) FOR DCIS CABLE CONNECTION, MOST CABLES ARE CONNECTED TO FIELD TERMINAL BLOCKS
ON SIDES OF EACH DCIS CABINETS.
HOWEVER, THERE ARE SOME CASES WHEN THE FIELD CABLES ARE DIRECTLY CONNECTED TO
SYSTEM CARD(T/U TERMINATION UNIT FOR ABB SYSTEM) WITHOUT FIELD TERMINAL BLOCKS.
e.g. T/C EXTENSION CABLES(T/C-K OR T/C-E)

2) IN THIS CASE, WIRING WORKS SHALL BE DONE ACCORDING TO THE SYSTEM INFORMATION.

3) IN ADDITION, TERMINAL NUMBERS AND ASSIGNMENTS INDICATED IN INSTRUMENT LOOP DIAGRAM


IS NOT MATCH WITH STANDARD LAYOUT OF T/U TERMINATION UNIT DUE TO ENGINEERING PRACTICE.

4) FOR PROPER WIRING AND TERMINAL CONNECTION, REFER TO THE GUIDELINES AS BELOW:

a) LOCATION OF T/U TERMINATION UNIT


- INFORMATION OF POSITION OF T/U TERMINATION UNIT CAN BE FOUND IN THE SYSTEM COLUMNS
OF INSTRUMENT LOOP DIAGRAM.
IN THE EXAMPLE AS THE FOLLOWING, T/U POSITION IS 1-9-A.

- DETAILS OF T/U POSITION


(1) 1ST COLUMN INDICATES SEQUENCE NUMBER OF CABINET SET - 1,2,3 OR 4.
ABB DCIS CABINETS COMPRISE OF MODULE, T/U CABINET AND I/R CABINETS AS ONE SET.
SEQUENCE NUMBER SHOWS WHERE THE T/U MODULE IS LOCATED IN WHICH CABINET IN THE SET.

(2) 2ND COLUMN INDICATES ROW NUMBER OF T/U TERMINATION UNIT IN THE CABINET - 1 TO 10.
ROW CAN BE COUNTED FROM TOP(1) TO BOTTOM(MAX. 10) OF A CABINET.

(3) 3RD COLUMN INDICATES SIDE OF THE CABINET, NAMED AS A, B, C, OR D.

(4) EXAMPLE FOR T/U POSITION


- 1-9-A MEANS "1ST CABINET(T/U CABINET)", "9TH ROW", "SIDE A(FRONT-LEFT)"

- 3-2-C MEANS "3RD CABINET(I/R CABINET)", "2ND ROW", "SIDE C(REAR-RIGHT)"

<TYPICAL ARRANGEMENT OF CABINETS AND T/U - TOP VIEW>

T/U CABINET MODULE CABINET I/R CABINET

<REAR>

D C D C D C
<LEFT> 1 2 3 <RIGHT>

A B A B A B

<FRONT>
sheet 0G10 of 0G10

b) TERMINAL NUMBERS AND ASSIGNMENT IN T/U TERMINATION UNIT

- TERMINAL NUMBERS IN T/U TERMINATION UNIT ARE INDICATED IN THE INSTRUMENT LOOP DIAGRAM AS
TB1/1,2,3, TB1/4,5,6, …, TB2/3,2,1, TB2/6,5,4,…

- FOR CONNECTION WORKS, REFER TO THE TERMINAL NUMBER ASSGINMENT AS BELOW:

- EXAMPLE FOR TERMINAL NUMBER


(1) TB1 / 4,5,6 MEANS TERMINALS(+, -, C) OF CHANNEL 2(TB1)

(2) TB2 / 6,5,4 MEANS TERMINALS(+, -, C) OF CHANNEL 11(TB2)

<NTAI06 TERMINATION UNIT LAYOUT>

12 13
24 1
11 14
23 2
10 15
22 3
9 16
21 4
8 17
20 5
7 18
19 6
6 19
18 7
5 20
17 8
4 21
16 9
3 22
15 10
2 23
14 11
1 24
13 12

0A
a
8. SHIELD CABLE REQUIREMENT ON ICMS SIDE

1) SHIELD CABLES SHALL BE PROTECTED FROM THE CABINET STRUCTURE USING ISOLATION TUBE OR EQUIVALENT.

2) FOR DCIS CABLE CONNECTION, MOST CABLES ARE CONNECTED TO FIELD TERMINAL BLOCKS ON SIDES
OF EACH DCIS CABINETS AND SHIELD TERMINALS ARE ASSIGNED ADJACENT TO SIGNAL TERMINAL BLOCKS
FOR INDIVIDUAL SHIELD OF ANALOG SIGNAL CABLES(PAIR, TRIAD).
THEREFORE, INDIVIDUAL SHIELD CABLES SHALL BE CONNECTED TO SHIELD TERMINAL BLOCKS AND
OVERALL SHIELD CABLES SHALL BE WIRED TO SHIELD BUSBAR IN THE CABINET.

3) WHEN T/C EXTENSION CABLES(T/C-K OR T/C-E) ARE DIRECTLY CONNECTED TO T/U TERMINATION UNITS,
INDIVIDUAL SHIELD CABLES ALSO SHALL BE DIRECTLY CONNECTED TO SHIELD BUSBAR IN THE CABINETS,
AS WELL AS OVERALL SHIELD CABLES(ABB MANUFACTURER'S STANDARD).
SHEET
NO. 0I01 OF 0I05 `
INSTRUMENT LOOP DIAGRAM INDEX (COMMON)

REV TAG NO. SHEET NO. DESCRIPTION JB or PANEL NO. P&ID NO. REMARKS

0 05EGD20CF001 0FT01 AUX BOILER INL FLOW 05EGD01GA001 00EGD-M-M7-PID-0001

0C 05END30CF001 0FT01 HFO EMPTYING PUMP OUTL FLOW 05END01GA001 00END-M-M7-PID-0001

0 07GHC30CF001 0FCV01 DWTP COM OUTL FLOW 07GHC01GY001 00GHC-M-M3-PID-0001

0C 07GHC30AA001 0FCV01 DWTP MIN FCV 07GHC01GA001 00GHC-M-M3-PID-0001

0 05EGB10CL001 0LT01 DO STRG TK LVL 05EGD01GA001 00EGD-M-M7-PID-0001

0 05EGB10CL501 0LT01 DO STRG TK LVL INDICATOR 05EGD01GA001 00EGD-M-M7-PID-0001

0C 07GKB10CL001 0LT02 POTABLE WTR TK LVL 07GBK01GA001 00GKB-M-M3-PID-0001

0C 07GKB10CL501 0LT02 POTABLE WTR TK LVL INDICATOR 07GBK01GA001 00GKB-M-M3-PID-0001

0C 07GBK10CL001 0LCV01 FILTERED WTR TK-A LVL 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GBK10CL501 0LCV01 FILTERED WTR TK-A LVL INDICATOR 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GHB10AA001 0LCV02 FILTERED WTR TK 1 INL LCV 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GBK10CL002 0LCV03 FILTERED WTR TK-B LVL 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GBK10CL502 0LCV03 FILTERED WTR TK-B LVL INDICATOR 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GHB10AA002 0LCV04 FILTERED WTR TK 2 INL LCV 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GBK10CL003 0LCV05 FILTERED WTR TK-C LVL 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GBK10CL503 0LCV05 FILTERED WTR TK-C LVL INDICATOR 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GHB10AA003 0LCV06 FILTERED WTR TK 3 INL LCV 07GBK01GA001 00GBK-M-M3-PID-0002

0C 07GHC10CL001 0LCV07 DEMI WTR STRG TK-A LVL 07GHC01GA001 00GHC-M-M3-PID-0001

0C 07GHC10CL501 0LCV07 DEMI WTR STRG TK-A LVL INDICATOR 07GHC01GA001 00GHC-M-M3-PID-0001

0C 07GHC10AA004 0LCV08 DEMI WTR TK 1 INL LCV 07GHC01GA001 00GHC-M-M3-PID-0001

0C 07GHC10CL002 0LCV09 DEMI WTR STRG TK-B LVL 07GHC01GA001 00GHC-M-M3-PID-0001

0C 07GHC10CL502 0LCV09 DEMI WTR STRG TK-B LVL INDICATOR 07GHC01GA001 00GHC-M-M3-PID-0001

0C 07GHC10AA005 0LCV10 DEMI WTR TK 2 INL LCV 07GHC01GA001 00GHC-M-M3-PID-0001

0 05EGD10CP001 0PT01 DO FOR AUX BLR SUPL PUMP-A INL STRN DP 05EGD01GY001 00EGD-M-M7-PID-0001

0 05EGD10CP002 0PT01 DO FOR AUX BLR SUPL PUMP-B INL STRN DP 05EGD01GY001 00EGD-M-M7-PID-0001

0 05EGD20CP001 0PT01 DO FOR AUX BLR SUPL PUMP-A OUTL STRN DP 05EGD01GY001 00EGD-M-M7-PID-0001

0 05EGD20CP002 0PT02 DO FOR AUX BLR SUPL PUMP-B OUTL STRN DP 05EGD01GY001 00EGD-M-M7-PID-0001

0 07GAC40CP001 0PT02 FGD MWTP COM OUTL PRESS 07GAC01GY002 00GAC-M-M3-PID-0002

0 07GHB20CP001 0PT02 SWTP COM OUTL PRESS 07GBK01GY001 00GBK-M-M3-PID-0002

0 07GHC30CP001 0PT03 DWTP COM OUTL PRESS 07GHC01GY001 00GHC-M-M3-PID-0001

0 07GKB40CP001 0PT03 POTABLE WTR PUMP COM OUTL PRESS 07GKB01GY001 00GKB-M-M3-PID-0001

0 09QEA30CP001 0PT03 COMPRESSED AIR SYS OUTL PRESS 09QEB01GY001 00QFB-M-M5-PID-0001

0 09QGA10CP001 0PT04 N2 BOTTLE MANIFOLD OUTL HDR PRESS 09QGA01GY001 00QGA-M-M17-PID-0001

0 09QGA20CP001 0PT04 CO2 BOTTLE MANIFOLD OUTL HDR PRESS 09QGA01GY001 00QGA-M-M17-PID-0002

0 05END20CP001 0PT05 HFO EMPTYING PUMP INL STRN DP 05END01GA001 00END-M-M7-PID-0001

0 05END20CP002 0PT05 HFO EMPTYING PUMP INL PRESS 05END01GA001 00END-M-M7-PID-0001

0C 07GBK10CP001 0PT06 FILTERED WTR TK-A VENT DP 07GBK01GA001

0C 07GBK10CP501 0PT06 FILTERED WTR TK-A VENT DP INDICATOR 07GBK01GA001

0C 07GBK10CP002 0PT07 FILTERED WTR TK-B VENT DP 07GBK01GA001

0C 07GBK10CP502 0PT07 FILTERED WTR TK-B VENT DP INDICATOR 07GBK01GA001

0C 07GBK10CP003 0PT08 FILTERED WTR TK-C VENT DP 07GBK01GA001

0C 07GBK10CP503 0PT08 FILTERED WTR TK-C VENT DP INDICATOR 07GBK01GA001

0C 07GHC10CP001 0PT09 DEMI WTR STRG TK-A CO2 ABSORBER DP 07GHC01GA001

0C 07GHC10CP501 0PT09 DEMI WTR STRG TK-A CO2 ABSORBER DP INDICATOR 07GHC01GA001

0C 07GHC10CP002 0PT10 DEMI WTR STRG TK-B CO2 ABSORBER DP 07GHC01GA001

0C 07GHC10CP502 0PT10 DEMI WTR STRG TK-B CO2 ABSORBER DP INDICATOR 07GHC01GA001

0 05EGD20CP003 0PCV01 AUX BLR INL PRESS 05EGD01GY001 00EGD-M-M7-PID-0001

0 05EGD21AA001 0PCV01 DO SUPL PUMP RECIR PCV 05EGD01GA001 00EGD-M-M7-PID-0001


SHEET
NO. 0I02 OF 0I05 `
INSTRUMENT LOOP DIAGRAM INDEX (COMMON)

REV TAG NO. SHEET NO. DESCRIPTION JB or PANEL NO. P&ID NO. REMARKS

0B 05EGB10CT601 0TE01 DO STRG TK TEMP DIRECT 00EGD-M-M7-PID-0001

0B 05LCN02CT601 0TCV01 HFO COND BDTK TK-A TO FO SUMP PIT TEMP DIRECT 00END-M-M7-PID-0002

0 05GHB10AA001 0TCV01 HFO COND BDTK-A INL SPRY TCV 05END01GA001 00END-M-M7-PID-0002

0B 05LCN02CT602 0TCV02 HFO COND BDTK TK-B TO FO SUMP PIT TEMP DIRECT 00END-M-M7-PID-0002

0 05GHB10AA002 0TCV02 HFO COND BDTK-B INL SPRY TCV CMD DIRECT 00END-M-M7-PID-0002

0C 09QGA10CQ001 0GD01 N2/CO2 BOTTLE STORAGE SYSTEM-1 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ002 0GD01 N2/CO2 BOTTLE STORAGE SYSTEM-2 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ003 0GD01 N2/CO2 BOTTLE STORAGE SYSTEM-3 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ004 0GD02 N2/CO2 BOTTLE STORAGE SYSTEM-4 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ005 0GD02 N2/CO2 BOTTLE STORAGE SYSTEM-5 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ006 0GD02 N2/CO2 BOTTLE STORAGE SYSTEM-6 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ007 0GD03 N2/CO2 BOTTLE STORAGE SYSTEM-7 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0C 09QGA10CQ008 0GD03 N2/CO2 BOTTLE STORAGE SYSTEM-8 09QGA01GA401 VP417-00100-I-I1-DAS-0001

0 07GKB20AA301 0XV01 POTABLE WTR TK INL XV DIRECT 00GKB-M-M3-PID-0001

0D 09QEA20AA301 0XV02 COMPRESSED AIR SYS OUTL XV DIRECT 00QEB-M-M5-PID-0001

0 05EGD10AA201 0MV01 DO SUPL PUMP-A INL MV 05EGD01GA501 00EGD-M-M7-PID-0001

0 05EGD10AA202 0MV02 DO SUPL PUMP-B INL MV 05EGD01GA502 00EGD-M-M7-PID-0001

0 05EGD20AA201 0MV03 DO SUPL PUMP-A OUTL MV 05EGD01GA501 00EGD-M-M7-PID-0001

0 05EGD10AA202 0MV04 DO SUPL PUMP-B OUTL MV 05EGD01GA502 00EGD-M-M7-PID-0001

0 07GNK11AA201 0MV05 DISCH WASTE WTR CANAL MV DIRECT 00GMA-M-M3-PID-0002

0 15END20AA201 0MV06 HFO STRG TK OUTL MV 15END01GA503 00END-M-M7-PID-0001

0 15END30AA201 0MV07 HFO EMPTYING PUMP OUTL MV 15END01GA503 00END-M-M7-PID-0001

0 25END20AA201 0MV08 HFO STRG TK OUTL MV 15END01GA503 00END-M-M7-PID-0001

0 25END30AA201 0MV09 HFO EMPTYING PUMP OUTL MV 15END01GA503 00END-M-M7-PID-0001

0B 09QEA11AN001 0PKG01 COMP-A 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QEA12AN001 0PKG01 COMP-B 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QEA13AN001 0PKG01 COMP-C 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QFC10CT001 0PKG02 AIR DRYER "A" 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QFC30CT002 0PKG02 AIR DRYER "B" 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QEY10GH001 0PKG02 COMP SYSTEM 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QEA10AA201 0PKG03 MOV.A 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QEA10AA202 0PKG03 MOV.B 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QFC10CT001 0PKG04 AIR DRYER "A" 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QFC30CT002 0PKG04 AIR DRYER "B" 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 09QEY10GH001 0PKG04 COMP SYSTEM GROUP REMOTE 09QEY10GH001 VP114-00100-M-M5-PFD-0001 AIR COMPRESSOR

0B 08PBB09CP101 0PKG06 DUPLEX STRN-A DP HIGH DIRECT VP109-00PBB-M-M4-PID-0035 INTAKE

0B 08PBB09CP102 0PKG06 DUPLEX STRN-B DP HIGH DIRECT VP109-00PBB-M-M4-PID-0035 INTAKE

0B 18PBB10CL001 0PKG07 TBS-A DOWNSTREAM LVL 08PBB10GH001 INTAKE

0B 18PBB20CL001 0PKG07 TBS-B DOWNSTREAM LVL 08PBB10GH001 INTAKE

0B 18PBB30CL001 0PKG07 TBS UPSTREAM LVL 08PBB10GH001 INTAKE

0B 18PBB10CL001 0PKG08 TBS-A DIFFERENTIAL LVL 08PBB10GH001 INTAKE

0B 18PBB20CL001 0PKG08 TBS-B DIFFERENTIAL LVL 08PBB10GH001 INTAKE

0B 28PBB10CL001 0PKG09 TBS-A DOWNSTREAM LVL 08PBB10GH001 INTAKE

0B 28PBB20CL001 0PKG09 TBS-B DOWNSTREAM LVL 08PBB10GH001 INTAKE

0B 28PBB30CL001 0PKG09 TBS UPSTREAM LVL 08PBB10GH001 INTAKE

0B 28PBB10CL001 0PKG10 TBS-A DIFFERENTIAL LVL 08PBB10GH001 INTAKE


SHEET
NO. 0I03 OF 0I05 `
INSTRUMENT LOOP DIAGRAM INDEX (COMMON)

REV TAG NO. SHEET NO. DESCRIPTION JB or PANEL NO. P&ID NO. REMARKS

0B 28PBB20CL001 0PKG10 TBS-B DIFFERENTIAL LVL 08PBB10GH001 INTAKE

0B 08PBN02CP110 0PKG11 EVAPORATOR OUTLET PRESS HIGH 09PBN09GH002 CHLORINATION

0B 08PBN09CQ010 0PKG11 CHLORINE GAS LEAK 09PBN09GH002 CHLORINATION

0B 08PBN09CW004 0PKG11 CHLORINE TON CONTAINER WEIGHT LOW 09PBN09GH002 CHLORINATION

0B 08PBN04CP110 0PKG12 DUPLEX TRAINER DIFF PRESS HIGH 09PBN09GH002 CHLORINATION

0B 08PBN04CP102 0PKG12 INJECTOR INLET SUPPLY PRESS LOW 09PBN09GH002 CHLORINATION

0B 08PBN05CP101 0PKG12 INJECTOR OUTLET PRESS HIGH 09PBN09GH002 CHLORINATION

0B 07GAC20AA001 0PKG16 RAW WTR XFER PUMP MIN FLOW FCV 07GAC01GY001 00GAC-M-M3-PID-0001 RAW WATER

0 07GAC20CF001 0PKG17 RAW WTR XFER PUMP COM OUTL FLOW 07GAC01GY001 00GAC-M-M3-PID-0001 RAW WATER

0B 07GAC20CP001 0PKG17 RAW WTR XFER PUMP COM OUTL PRESS 07GAC01GY001 00GAC-M-M3-PID-0001 RAW WATER

0B 07GAC10CL001 0PKG18 RAW WTR TK #1 LVL 07GCY01BY001 00GAC-M-M3-PID-0001 RAW WATER

0B 07GAC20CL001 0PKG18 RAW WTR TK #2 LVL 07GCY01BY001 00GAC-M-M3-PID-0001 RAW WATER

0B 07GBK010CL001 0PKG18 FILTERED WTR TK-A LVL 07GCY01BY001 00GHC-M-M3-PID-0001 RAW WATER

0B 07GBK10CL002 0PKG19 FILTERED WTR TK-B LVL 07GCY01BY001 00GHC-M-M3-PID-0001 RAW WATER

0B 07GHC10CL001 0PKG19 DEMI WTR STRG TK-A LVL 07GCY01BY001 00GHC-M-M3-PID-0001 RAW WATER

0B 07GHC10CL002 0PKG19 DEMI WTR STRG TK-B LVL 07GCY01BY001 00GHC-M-M3-PID-0001 RAW WATER

0B 07GBK010CL003 0PKG20 FILTERED WTR TK-C LVL 07GCY01BY001 00GAC-M-M3-PID-0001 RAW WATER

0 09CFA01CS002 0PKG26 WIND SPEED 09CFA01GA001 VP416-00100-I-I1-DFN-0002 WEATHER STATION

0 09CFA01CS001 0PKG26 WIND DIRECTION 09CFA01GA001 VP416-00100-I-I1-DFN-0002 WEATHER STATION

0 09CFA01CT001 0PKG27 TEMPERATURE 09CFA01GA001 VP416-00100-I-I1-DFN-0002 WEATHER STATION

0 09CFA01CT001 0PKG27 HUMIDITY 09CFA01GA001 VP416-00100-I-I1-DFN-0002 WEATHER STATION

0 09CFA01CP001 0PKG27 BAROMETER 09CFA01GA001 VP416-00100-I-I1-DFN-0002 WEATHER STATION

0B 09QJA10AG001 0PKG31 H2 GEN A NORMAL STATUS 09GJA01EA001 H2 GENERATION

0B 09QJA10EK001 0PKG31 H2 PLANT COM ALM STATUS 09GJA01EA001 H2 GENERATION

0B 09QJA10AG002 0PKG31 H2 GEN B NORMAL STATUS 09GJA01EA001 H2 GENERATION

0B 09QJA10FM001 0PKG32 H2 PLANT SYSTEM DEW POINT 09GJA01EA001 H2 GENERATION

0B 09QJA10FM002 0PKG32 H2 GEN OUTPUT DEW POINT 09GJA01EA001 H2 GENERATION

0B 09QJA10FP001 0PKG32 H2 PLANT SYSTEM PRESSURE 09GJA01EA001 H2 GENERATION

0B 09QJA10FQ001 0PKG32 H2 PLANT SYSTEM PURITY 09GJA01EA001 H2 GENERATION

0B 03CMA02EQ001 0PKG41 GPS-A Fault Alarm 03CPB06EA001 GPS

0B 03CMA02EQ002 0PKG41 GPS-B Fault Alarm 03CPB06EA001 GPS

0 01SAA11GK001 0PKG46 TBN BLDG HVAC TRBL 01SAA11GK001 00SAA-H-M15-AFD-0001 HVAC

0 01SAA11GK002 0PKG46 TBN BLDG HVAC TRBL 01SAA11GK002 00SAA-H-M15-AFD-0001 HVAC

0 03SAA12GK001 0PKG46 MAIN CTRL BLDG HVAC TRBL 03SAA12GK001 00SAA-H-M15-AFD-0010~0012 HVAC

0 03SAA12GK002 0PKG47 MAIN CTRL BLDG HVAC TRBL 03SAA12GK002 00SAA-H-M15-AFD-0010~0012 HVAC

0 04SAA20GK001 0PKG47 ESP CTRL BLDG HVAC TRBL 04SAA20GK001 00SAA-H-M15-AFD-0022 HVAC

0 04SAA24GK001 0PKG47 FGD CTRL&GYP BLDG HVAC TRBL 04SAA24GK001 00SAA-H-M15-AFD-0027~0028 HVAC

0 05SAA13GK001 0PKG48 HFO XFER PUMP HOUSE HVAC TRBL 05SAA13GK001 00SAA-H-M15-LST-0029 HVAC

0 05SAA23GK001 0PKG48 LMSTE SLR PREP BLDG HVAC TRBL 05SAA23GK001 00SAA-H-M15-AFD-0020 HVAC

0 06SAA21GK001 0PKG48 ASH DISCH PUMP HOUSE HVAC TRBL 06SAA21GK001 00SAA-H-M15-AFD-0031 HVAC

0 06SAA29GK001 0PKG49 ASH HNDL COMPR HOUSE HVAC TRBL 06SAA29GK001 00SAA-H-M15-AFD-0030 HVAC

0 07SAA17GK001 0PKG49 WTR TREATMENT BLDG HVAC TRBL 07SAA17GK001 00SAA-H-M15-AFD-0023 HVAC

0 09SAA15GK001 0PKG50 AIR COMPR BLDG HVAC TRBL 09SAA15GK001 00SAA-H-M15-LST-0026 HVAC

0 09SAA25GK001 0PKG50 ABSBR RECIR PUMP HOUSE #1 HVAC TRBL 09SAA25GK001 00SAA-H-M15-LST-0027 HVAC

0 09SAA26GK001 0PKG50 ABSBR RECIR PUMP HOUSE #2 HVAC TRBL 09SAA26GK001 00SAA-H-M15-LST-0028 HVAC
SHEET
NO. 0I04 OF 0I05 `
INSTRUMENT LOOP DIAGRAM INDEX (COMMON)

REV TAG NO. SHEET NO. DESCRIPTION JB or PANEL NO. P&ID NO. REMARKS

0 09SAA14GK001 0PKG51 DIESEL GEN BLDG HVAC TRBL 09SAA14GK001 00SAA-H-M15-LST-0030 HVAC

0 09SAA16GK001 0PKG51 HYDROGEN PLANT BLDG HVAC TRBL 09SAA16GK001 00SAA-H-M15-AFD-0024 HVAC

0 08SAA18GK001 0PKG52 CWP HOUSE HVAC TRBL 08SAA18GK001 00SAA-H-M15-AFD-0030 HVAC

0 09SAA19GK001 0PKG52 CHLORINE BLDG HVAC TRBL 09SAA19GK001 00SAA-H-M15-AFD-0025 HVAC

0B 18PAC10CY001 0PKG56 CWP-A MOTOR NDE BRG. X-VIB 03CPB01FY001 UMMS

0B 18PAC10CY002 0PKG56 CWP-A MOTOR NDE BRG. Y-VIB 03CPB01FY001 UMMS

0B 18PAC10CY603 0PKG56 CWP-A MOTOR DE BRG. VIB 03CPB01FY001 UMMS

0B 18PAC10CY605 0PKG57 CWP-A PUMP BRG. VIB 03CPB01FY001 UMMS

0B 18PAC10CY011 0PKG57 CWP-B MOTOR NDE BRG. X-VIB 03CPB01FY001 UMMS

0B 18PAC10CY012 0PKG57 CWP-B MOTOR NDE BRG. Y-VIB 03CPB01FY001 UMMS

0B 18PAC10CY613 0PKG58 CWP-B MOTOR DE BRG. VIB 03CPB01FY001 UMMS

0B 18PAC10CY615 0PKG58 CWP-B PUMP BRG. VIB 03CPB01FY001 UMMS

0B 28PAC10CY001 0PKG59 CWP-A MOTOR NDE BRG. X-VIB 03CPB01FY001 UMMS

0B 28PAC10CY002 0PKG59 CWP-A MOTOR NDE BRG. Y-VIB 03CPB01FY001 UMMS

0B 28PAC10CY603 0PKG59 CWP-A MOTOR DE BRG. VIB 03CPB01FY001 UMMS

0B 28PAC10CY605 0PKG60 CWP-A PUMP BRG. VIB 03CPB01FY001 UMMS

0B 28PAC10CY011 0PKG60 CWP-B MOTOR NDE BRG. X-VIB 03CPB01FY001 UMMS

0B 28PAC10CY012 0PKG60 CWP-B MOTOR NDE BRG. Y-VIB 03CPB01FY001 UMMS

0B 28PAC10CY613 0PKG61 CWP-B MOTOR DE BRG. VIB 03CPB01FY001 UMMS

0B 28PAC10CY615 0PKG61 CWP-B PUMP BRG. VIB 03CPB01FY001 UMMS

0 09QCD01CL101 0PKG66 AMMONIA STORAGE TANK LEVEL SWITCH 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP001 0PKG66 AMMONIA TRANSFER PUMP-A 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP002 0PKG66 AMMONIA TRANSFER PUMP-B 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP001 0PKG67 AMMONIA TRANSFER PUMP-A 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP002 0PKG67 AMMONIA TRANSFER PUMP-B 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP001 0PKG68 AMMONIA TRANSFER PUMP-A 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP002 0PKG68 AMMONIA TRANSFER PUMP-B 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0 09QCD01CL101 0PKG68 AMMONIA STORAGE TANK LEVEL SWITCH 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP001 0PKG69 AMMONIA TRANSFER PUMP-A 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 09ACD01AP002 0PKG69 AMMONIA TRANSFER PUMP-B 09GNN01BY001 TB2-SDC.VP115-00GNN-M-M17-PID-0019 AMMONIA SHELTER

0B 01GMA01EC001 0PKG71 TBN BLDG CABLE CULV SUMP 01GMA01EC001 00GMA-M-M3-PID-0001 SUMP

0B 02GMA01EC001 0PKG72 BLR AREA CHEM SUMP 02GMA01EC001 00GMA-M-M3-PID-0001 SUMP

0B 09GMA01EC001 0PKG73 MAIN BLDG BLDG SUMP 09GMA01EC001 00GMA-M-M3-PID-0001 SUMP

0B 09GMA02EC001 0PKG74 NH3 STRG SETR FOR CIS SUMP 09GMA02EC001 00GMA-M-M3-PID-0002 SUMP

0B 05GMA11EC001 0PKG75 FUEL OIL STRG AREA SUMP 05GMA11EC001 00GMA-M-M3-PID-0004 SUMP

0B 05GMA12EC001 0PKG76 DO STRG AREA SUMP 05GMA12EC001 00GMA-M-M3-PID-0004 SUMP

0B 08GMA01EC001 0PKG77 CWP HOUSE SUMP 08GMA01EC001 00GMA-M-M3-PID-0002 SUMP

0B 09GMA12EC001 0PKG78 ED GEN. HOUSE AREA SUMP 09GMA12EC001 00GMA-M-M3-PID-0004 SUMP

0B 11GMA01EC001 0PKG79 CNDR #1 SUMP 11GMA01EC001 00GMA-M-M3-PID-0002 SUMP

0B 11GMA12EC001 0PKG79A TBN BLDG MAIN OIL TK #1 SUMP 11GMA12EC001 00GMA-M-M3-PID-0003 SUMP

0B 19GMA11EC001 0PKG79B TR & CLN/DIRTY OIL TK #1 SUMP 19GMA11EC001 00GMA-M-M3-PID-0003 SUMP

0B 11GMA11EC001 0PKG79C TBN BLDG BFP AREA #1 SUMP 11GMA11EC001 00GMA-M-M3-PID-0004 SUMP

0B 21GMA01EC001 0PKG80 CNDR #2 SUMP 21GMA01EC001 00GMA-M-M3-PID-0002 SUMP

0B 21GMA12EC001 0PKG80A TBN BLDG MAIN OIL TK #2 SUMP 21GMA12EC001 00GMA-M-M3-PID-0003 SUMP

0B 29GMA11EC001 0PKG80B TR & CLN/DIRTY OIL TK #2 SUMP 29GMA11EC001 00GMA-M-M3-PID-0003 SUMP

0B 21GMA11EC001 0PKG80C TBN BLDG BFP AREA #2 SUMP 21GMA11EC001 00GMA-M-M3-PID-0004 SUMP

0B 03CWD01EA001 0PKG81 COMMON DCS OWS 1 03CPB06EZ001 PDP


SHEET
NO. 0I05 OF 0I05 `
INSTRUMENT LOOP DIAGRAM INDEX (COMMON)

REV TAG NO. SHEET NO. DESCRIPTION JB or PANEL NO. P&ID NO. REMARKS

0B 03CWD02EA001 0PKG81 COMMON DCS OWS 2 03CPB06EZ001 PDP

0B 03CWD03EA001 0PKG81 CHIEF'S SUPERVISORY COMPUTER 03CPB06EZ001 PDP

0B 03CRV01EU001 0PKG81 COMMON DCS EWS 03CPB06EZ001 PDP

0B 03CMA01EM001 0PKG82 APPLICATION & HDSR SEVER V여 03CPB06EZ001 PDP

0B 03CKA01EP001 0PKG82 FDMS 03CPB06EZ001 PDP

0B 03CRV02EU001 0PKG82 UNIT 1,2 ESD EWS 03CPB06EZ001 PDP

0C 03CPB05EA001 0PKG82 SERVER RACK 03CPB06EZ001 PDP

0D 03CPB01EA001 0PKG83 MODULE (BOILER&SCR) 03CPB06EZ001 PDP

0D 03CPB02EA001 0PKG83 MODULE (BOP&MISC) 03CPB06EZ001 PDP

0D 03CPB03EA001 0PKG83 MODULE (EMS-1) 03CPB06EZ001 PDP

0D 03CPB04EA001 0PKG83 MODULE (EMS-2) 03CPB06EZ001 PDP

0D 03CPB06EA001 0PKG84 SERVER RACK 03CPB06EZ001 PDP

0D 03CPB02EM001 0PKG85 MODULE (BOP&MISC) 03CPB06EZ001 PDP

0B 03CPB01EA001 0PKG85 MODULE (BOILER&SCR) 03CPB06EZ001 PDP

0B 03CPB02EA001 0PKG85 MODULE (BOP&MISC) 03CPB06EZ001 PDP

0D 03CPB03EA001 0PKG85 MODULE (EMS-1) 03CPB06EZ001 PDP

0B 03CPB04EA001 0PKG86 MODULE (EMS-2) 03CPB06EZ001 PDP

0B 03CPB05EA001 0PKG87 SCMS REMOTE I/O 03CPB07EZ001 PDP

0B 03CPB06EZ001XW01 0PKG88 PDP PWR TRIP-UPS A 03CPB06EZ001 PDP INTERFACE

0B 03CPB06EZ001XW03 0PKG88 PDP PWR TRIP-UPS B 03CPB06EZ001 PDP INTERFACE

0B 03CPB06EZ001XW02 0PKG88 PDP PWR TRIP-DC 03CPB06EZ001 PDP INTERFACE

0B 03CPB07EZ001XW01 0PKG89 INTAKE PDP PWR TRIP-UPS 03CPB07EZ001 PDP INTERFACE

0B 03CPB07EZ001XW02 0PKG89 INTAKE PDP PWR TRIP-DC 03CPB07EZ001 PDP INTERFACE


FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

COMPRESSED AIR SYS OUTL XV DCS CABINET NO : 03CPB02EM001


TAG NO : 09QEA20AA301

0D PCU ADDRESS
3-A-S 3-6-A
09QEA4301 LOOP PCU MOD SLV
09QEA20AA301XG01 CEE(OS-GSWA)-1.5mm² -4C 5 2 3 25
1WH 1WH SLAVE
3 189 7
OPEN 2WH 2WH TB4 TYPE CAB No. ROW SLOT
4 190 8
3WH 3WH SPDSI22 03CPB02EA001 5 3
7 191 1
CLOSE 4WH 4WH TB3 T/U
8 192 2
TYPE CAB No. POSITION TB No.
09QEA20AA301XG02 NTDI01 03CPB02EM001 3-6-A TB4-7,8
NTDI01 03CPB02EM001 3-6-A TB3-1,2
ON/OFF V/V OS

COMPRESSED AIR SYS


OUTL XV OPN CMD DCS CABINET NO : 03CPB02EM001
TAG NO : 09QEA20AA301

3-C-S 3-5-R PCU ADDRESS


LOOP PCU MOD SLV
09QEA4801
09QEA20AA301YB02 5 2 3 44
WH CEE(GSWA)-2.5mm² -2C WH
4 73 14 SLAVE
SOV BK BK R11 TYPE CAB No. ROW SLOT
5 74 24
SPDSO14 03CPB02EA001 6 3
T/U
TYPE CAB No. POSITION TB No.
RELAY PANEL 03CPB02EM001 3-5-R R11-14,24

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
84

86

87

88

89
91

90

93

92

95

96

94
97

98

99

100

101

102
103
104
105
106
107
108
110
80
77

81

78

79

83
84
85
86
87
88
09QJA4003
09QJA5001
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TBN BLDG CABLE CULV SUMP PIT LVL


SUMP PANEL NO : 01GMA01EC001
TAG NO : 01GMA01CL101
CTB
01GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM DCS CABINET NO : 03CPB02EA001
HH 6WH 6WH
NC 6
- 7WH 7WH 7
3-A-S T/U
- 8WH 8WH 8 01GMA4001 PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
1WH LOOP
1WH
01GMA01CL101XG01 LVL HH 16 193 3 5 2 3 25
2WH 2WH TB3
15 194 4 5 2 3 28
PUMP-A 3WH 3WH
01GMA01AP001XB01 10 195 5 5 2 3 29
RUNNING
4WH 4WH TB4
9 196 6 SLAVE
PUMP-A 5WH 5WH TYPE CAB No. ROW SLOT
01GMA01AP001XB05 11 197 7
FAULT
TB4 SPDSI22 03CPB02EA001 5 3
- 8
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 6
01GMA01AP002XB01 13 199 1
RUNNING
7WH 7WH TB3 SPDSI22 03CPB02EA001 5 7
12 200 2
PUMP-B 8WH 8WH T/U
01GMA01AP002XB05 14 201 3
FAULT
TB3 TYPE CAB No. POSITION TB No.
- 4
NTDI01 03CPB02EM001 3-6-A TB3 3,4
9WH 9WH NTDI01 03CPB02EM001 3-9-A TB4 5,6
17 198
10WH 10WH 03CPB02EM001
18 202 NTDI01 3-9-A TB4 7,8
NTDI01 03CPB02EM001 3-10-A TB3 1,2
NTDI01 03CPB02EM001 3-10-A TB3 3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

BLR AREA CHEM SUMP PIT LVL


SUMP PANEL NO : 02GMA01EC001
TAG NO : 02GMA01CL101
CTB
02GMA4011
CEE(GSWA)-2.5㎟-8C
B 1WH 1WH 1
(com)
L 2WH 2WH
A 2
(NO)
B 3WH 3WH 3
(com)
H 4WH 4WH
C 4
(NC)
LS 5WH 5WH
B 5
(com)
HH C 6WH 6WH
(NC) 6
- 7WH 7WH 7
- 8WH 8WH 8
DCS CABINET NO : 03CPB02EA001

3-A-S T/U
02GMA4001 PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C LOOP PCU MOD SLV
1WH 1WH
02GMA01CL101XG01 LVL HH 16 169 7 5 2 3 24
2WH 2WH TB4
15 170 8 5 2 3 28
3WH 3WH
02GMA01AP001XB01 PUMP-A
10 171 1 5 2 3 29
RUNNING 4WH 4WH TB4
9 172 2 SLAVE
PUMP-A 5WH 5WH TYPE CAB No. ROW SLOT
02GMA01AP001XB05 11 173 3
FAULT TB4
- SPDSI22 03CPB02EA001 5 2
4
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 6
02GMA01AP002XB01 13 175 5
RUNNING 7WH 7WH TB4 SPDSI22 03CPB02EA001 5 7
12 176 6
PUMP-B 8WH 8WH T/U
02GMA01AP002XB05 14 177 7
FAULT
TB4 TYPE CAB No. POSITION TB No.
- 8
NTDI01 03CPB02EM001 3-5-A TB4 7,8
9WH 9WH NTDI01 03CPB02EM001
17 174
3-9-A TB4-1,2
10WH 10WH 03CPB02EM001
18 178
NTDI01 3-9-A TB4-3,4
NTDI01 03CPB02EM001 3-10-A TB4-5,6
NTDI01 03CPB02EM001 3-10-A TB4-7,8

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

MAIN BLDG BLDG SUMP PIT LVL


SUMP PANEL NO : 09GMA01EC001
TAG NO : 09GMA01CL101
CTB
09GMA4012
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7
8WH 8WH DCS CABINET NO : 03CPB02EA001
- 8

3-A-S T/U
09GMA4002 PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
1WH LOOP
1WH
09GMA01CL101XG01 LVL HH 16 203 5 5 2 3 25
2WH 2WH TB3
15 204 6 5 2 3 28
3WH 3WH
09GMA01AP001XB01 PUMP-A
10 205 1 5 2 3 29
RUNNING 4WH
4WH TB3
SLAVE
9 206 2
PUMP-A 5WH 5WH TYPE CAB No. ROW SLOT
09GMA01AP001XB05 11 207 3
FAULT
TB3 SPDSI22 03CPB02EA001 5 3
- 4
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 6
09GMA01AP002XB01 13 209 1
RUNNING 7WH 7WH TB1 SPDSI22 03CPB02EA001 5 7
12 210 2
PUMP-B 8WH 8WH T/U
09GMA01AP002XB05 14 211 3
FAULT
TB1 TYPE CAB No. POSITION TB No.
- 4
NTDI01 03CPB02EM001 3-6-A TB3-5,6
9WH 9WH NTDI01 03CPB02EM001
17 208
3-9-A TB3-1,2
10WH 10WH
18 212
NTDI01 03CPB02EM001 3-9-A TB3-3,4
NTDI01 03CPB02EM001 3-10-A TB1-1,2
NTDI01 03CPB02EM001 3-10-A TB1-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

NH3 STRG SETR FOR CIS AREA SUPT LVL


SUMP PANEL NO : 09GMA02EC001
TAG NO : 09GMA02CL101
CTB
09GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7
- 8WH 8WH 8 DCS CABINET NO : 03CPB02EA001

3-A-S T/U
09GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
LOOP
1WH 1WH
09GMA02CL101XG01 LVL HH 16 225 1 5 2 3 26
2WH 2WH TB2
15 226 2 5 2 3 28
3WH 3WH 29
09GMA02AP001XB01 PUMP-A
10 227 5 5 2 3
RUNNING 4WH 4WH TB3
9 228 6 SLAVE
PUMP-A 5WH 5WH TYPE CAB No. ROW SLOT
09GMA02AP001XB05 11 229 1
FAULT TB1
- SPDSI22 03CPB02EA001 5 4
2
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 6
09GMA02AP002XB01 13 231 5
RUNNING 7WH
7WH TB1 SPDSI22 03CPB02EA001 5 7
12 232 6
PUMP-B 8WH 8WH T/U
09GMA02AP002XB05 14 233 7
FAULT TB1
- TYPE CAB No. POSITION TB No.
8
NTDI01 03CPB02EM001 3-7-A TB2-1,2
9WH 9WH NTDI01 03CPB02EM001 3-9-A TB3-5,6
17 230
10WH 10WH NTDI01 03CPB02EM001 3-9-A TB1-1,2
18 234
NTDI01 03CPB02EM001 3-10-A TB1-5,6
NTDI01 03CPB02EM001 3-10-A TB1-7,8

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

FUEL OIL STRG AREA SUMP PIT LVL


SUMP PANEL NO : 05GMA11EC001
TAG NO : 05GMA11CL101
CTB
05GMA4012
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7
8WH 8WH DCS CABINET NO : 03CPB02EA001
- 8

3-B-S T/U
05GMA4002
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
1WH LOOP
1WH
05GMA11CL101XG01 LVL HH 16 21 1 5 2 3 24
2WH 2WH TB4
15 22 2 5 2 3 33
3WH 3WH
05GMA11AP001XB01 PUMP-A
10 23 7 5 2 3 35
RUNNING 4WH 4WH TB1
9 24 8 SLAVE
5WH 5WH CAB No. ROW SLOT
05GMA11AP001XB05
PUMP-A
11 25 1
TYPE
FAULT
TB2 SPDSI22 03CPB02EA001 5 2
- 2
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 11
05GMA11AP002XB01 13 27 1
RUNNING 7WH
7WH TB4 SPDSI22 03CPB02EA001 6 12
12 28 2
PUMP-B 8WH 8WH T/U
05GMA11AP002XB05 14 29 3
FAULT
TB4 TYPE CAB No. POSITION TB No.
- 4
NTDI01 03CPB02EM001 3-5-A TB4-1,2
9WH 9WH 03CPB02EM001
17 26
NTDI01 3-4-B TB1-7,8
10WH 10WH
18 30 NTDI01 03CPB02EM001 3-4-B TB2-1,2
NTDI01 03CPB02EM001 3-6-B TB4-1,2
NTDI01 03CPB02EM001 3-6-B TB4-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

DO STRG AREA SUMP PIT LVL


SUMP PANEL NO : 05GMA12EC001
TAG NO : 05GMA12CL101
CTB
05GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7 DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

3-B-S T/U
05GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
LOOP
1WH 1WH
05GMA12CL101XG01 LVL HH 16 31 3 5 2 3 24
2WH 2WH TB4
15 32 4 5 2 3 34
PUMP-A 3WH 3WH 2 3 35
05GMA12AP001XB01
10 33 1 5
RUNNING 4WH TB4
4WH SLAVE
9 34 2
PUMP-A 5WH 5WH TYPE CAB No. ROW SLOT
05GMA12AP001XB05 11 35 3
FAULT TB4 SPDSI22 03CPB02EA001 5 2
- 4
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 12
05GMA12AP002XB01 13 37 5
RUNNING 7WH 7WH TB4 12
SPDSI22 03CPB02EA001 6
12 38 6
PUMP-B 8WH 8WH T/U
05GMA12AP002XB05 14 39 7
FAULT TB4
-
TYPE CAB No. POSITION TB No.
8
NTDI01 03CPB02EM001 3-5-A TB4-3,4
9WH 9WH NTDI01 03CPB02EM001 3-5-B TB4-1,2
17 36
10WH 10WH NTDI01 03CPB02EM001 3-5-B TB4-3,4
18 40
NTDI01 03CPB02EM001 3-6-B TB4-5,6
NTDI01 03CPB02EM001 3-6-B TB4-7,8

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA 0E CHLORINATION HOUSE CONTROL ROOM
FIELD REMOTE I/O CABINET

0E

CWP HOUSE SUMP PIT LVL


SUMP PANEL NO : 08GMA01EC001
TAG NO : 08GMA01CL101
CTB
08GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7
DCS CABINET NO : 03CPB05EZ001
- 8WH 8WH 8

2-B-S T/U
08GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
1WH LOOP
1WH
08GMA01CL101XG01 LVL HH 16 121 1 5 5 3 13
2WH 2WH TB4
15 122 2 5 5 3 13
3WH 3WH
08GMA01AP001XB01 PUMP-A
10 123 3 5 5 3 13
RUNNING 4WH 4WH TB4
9 124 4 SLAVE
5WH 5WH CAB No. ROW SLOT
08GMA01AP001XB05
PUMP-A
11 125 5
TYPE
FAULT
TB4 SPDSI22 03CPB05EA001 4 10
- 6
PUMP-B 6WH 6WH SPDSI22 03CPB05EA001 4 10
08GMA01AP002XB01 13 126 7
RUNNING 7WH 7WH TB4 SPDSI22 03CPB05EA001 4 10
12 127 8
PUMP-B 8WH 8WH T/U
08GMA01AP002XB05 14 128 1
FAULT
TB3 TYPE CAB No. POSITION TB No.
- 2
NTDI01 03CPB05EZ001 2-8-B TB4 1,2
9WH 9WH 03CPB02EM001
17 129
NTDI01 2-8-B TB4-3,4
10WH 10WH
18 130
NTDI01 03CPB02EM001 2-8-B TB4-5,6
NTDI01 03CPB02EM001 2-8-B TB4-7,8
NTDI01 03CPB02EM001 2-8-B TB3-1,2

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

ED GEN. HOUSE AREA OSP LVL


SUMP PANEL NO : 09GMA12EC001
TAG NO : 09GMA12CL101
CTB
09GMA4013
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7
DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

3-B-S T/U
09GMA4003 PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C PCU MOD SLV
LOOP
1WH 1WH
09GMA12CL101XG01 LVL HH 16 41 5 5 2 3 24
2WH 2WH TB4
15 42 6 5 2 3 34
3WH 3WH 35
09GMA12AP001XB01 PUMP-A
10 43 5 5 2 3
RUNNING 4WH 4WH TB4
9 44 6 SLAVE
PUMP-A 5WH 5WH TYPE CAB No. ROW SLOT
09GMA12AP001XB05 11 45 7
FAULT TB4
- SPDSI22 03CPB02EA001 5 2
8
PUMP-B 6WH 6WH SPDSI22 03CPB02EA001 5 12
09GMA12AP002XB01 13 47 1
RUNNING 7WH
7WH TB4 SPDSI22 03CPB02EA001 6 12
12 48 2
PUMP-B 8WH 8WH T/U
09GMA12AP002XB05 14 49 3
FAULT TB4
- TYPE CAB No. POSITION TB No.
4
NTDI01 03CPB02EM001 3-5-A TB4-5,6
9WH 9WH NTDI01 03CPB02EM001 3-5-B TB4-5,6
17 46
10WH 10WH NTDI01 03CPB02EM001 3-5-B TB4-7,8
18 50
NTDI01 03CPB02EM001 3-6-B TB3-1,2
NTDI01 03CPB02EM001 3-6-B TB3-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

CNDR #1 SUMP PIT LVL


SUMP PANEL NO : 11GMA01EC001
TAG NO : 11GMA01CL101
CTB
11GMA4012
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH DCS CABINET NO : 03CPB02EM001
7
- 8WH 8WH 8

3-A-S T/U
11GMA4002
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-4-A PCU MOD SLV
LOOP
1WH 1WH
11GMA01CL101XG01 LVL HH 16 159 3 5 2 3 23
2WH 2WH TB1
15 160 4 5 2 3 28
3-9-A 5 2 3 30
PUMP-A 3WH 3WH SLAVE
11GMA01AP001XB01 10 161 3
RUNNING
4WH 4WH TB1 TYPE CAB No. ROW SLOT
9 162 4
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 1
11GMA01AP001XB05 11 163 5
FAULT
TB1 SPDSI22 03CPB02EA001 5 6
- 6

3-1-B SPDSI22 03CPB02EA001 5 8


PUMP-B 6WH 6WH T/U
11GMA01AP002XB01 13 165 1
RUNNING
7WH 7WH TB4 TYPE CAB No. POSITION TB No.
12 166 2
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-4-A TB1-3,4
11GMA01AP002XB05 FAULT 14 167 3
-
TB4 NTDI01 03CPB02EM001 3-9-A TB1-3,4
4
NTDI01 03CPB02EM001 3-9-A TB1-5,6
9WH 9WH
17 164 NTDI01 03CPB02EM001 3-1-B TB4-1,2
10WH 10WH
18 168 NTDI01 03CPB02EM001 3-1-B TB4-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TBN BLDG MAIN OIL TK AREA #1 OSP LVL


SUMP PANEL NO : 11GMA12EC001
TAG NO : 11GMA12CL101
CTB
11GMA4013
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7 DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

3-B-S T/U
11GMA4003
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-4-A PCU MOD SLV
LOOP
1WH 1WH
11GMA12CL101XG01 LVL HH 16 11 7 5 2 3 23
2WH 2WH TB1
15 12 8 5 2 3 31
3-2-B 5 2 3 32
PUMP-A 3WH 3WH SLAVE
11GMA12AP001XB01 10 13 1
RUNNING
4WH 4WH TB4 TYPE CAB No. ROW SLOT
9 14 2
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 1
11GMA12AP001XB05 11 15 3
FAULT
TB4 SPDSI22 03CPB02EA001 5 9
- 4

3-3-B SPDSI22 03CPB02EA001 5 10


PUMP-B 6WH 6WH T/U
11GMA12AP002XB01 13 17 1
RUNNING
7WH 7WH TB1 TYPE CAB No. POSITION TB No.
12 18 2
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-4-A TB1-7,8
11GMA12AP002XB05 14 19 3
FAULT
TB1 NTDI01 03CPB02EM001 3-2-B TB4-1,2
- 4
NTDI01 03CPB02EM001 3-2-B TB4-3,4
9WH 9WH
17 16 NTDI01 03CPB02EM001 3-3-B TB1-1,2
10WH 10WH
18 20 NTDI01 03CPB02EM001 3-3-B TB1-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TR & CLN/DIRTY OIL TK AREA #1 OSP LVL


SUMP PANEL NO : 19GMA11EC001
TAG NO : 19GMA11CL101
CTB
19GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7 DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

3-B-S T/U
19GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-4-A PCU MOD SLV
LOOP
1WH 1WH
19GMA11CL101XG01 LVL HH 16 1 7 5 2 3 23
2WH 2WH TB1
15 2 8 5 2 3 30
3-1-B 5 2 3 32
PUMP-A 3WH 3WH SLAVE
19GMA11AP001XB01 10 3 1
RUNNING
4WH 4WH TB4 TYPE CAB No. ROW SLOT
9 4 2
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 1
19GMA11AP001XB05 11 5 3
FAULT
-
TB4 SPDSI22 03CPB02EA001 5 8
4
SPDSI22 03CPB02EA001 5 10
3-3-B
PUMP-B 6WH 6WH T/U
19GMA11AP002XB01 13 7 1
RUNNING
7WH 7WH TB1 TYPE CAB No. POSITION TB No.
12 8 2
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-4-A TB1-5,6
19GMA11AP002XB05 FAULT 14 9 3
-
TB1 NTDI01 03CPB02EM001 3-1-B TB1-5,6
4
NTDI01 03CPB02EM001 3-1-B TB1-7,8
9WH 9WH
17 6 NTDI01 03CPB02EM001 3-3-B TB3-1,2
10WH 10WH
18 10 NTDI01 03CPB02EM001 3-3-B TB3-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TBN BLDG BFP AREA #1 OSP LVL


SUMP PANEL NO : 11GMA11EC001
TAG NO : 11GMA11CL101
CTB
11GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7 DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

1-D-S T/U
11GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-4-A PCU MOD SLV
LOOP
1WH 1WH
11GMA11CL101XG01 LVL HH 16 138 1 5 2 3 23
2WH 2WH TB2
15 139 2 5 2 3 17
1-10-C 5 2 3 18
PUMP-A 3WH 3WH SLAVE
11GMA11AP001XB01 10 130 5
RUNNING
4WH 4WH TB4 TYPE CAB No. ROW SLOT
9 131 6
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 1
11GMA11AP001XB05 11 132 7
FAULT
TB4 SPDSI22 03CPB02EA001 4 6
- 8

1-9-D SPDSI22 03CPB02EA001 4 5


PUMP-B 6WH 6WH T/U
11GMA11AP002XB01 13 134 5
RUNNING
7WH 7WH TB3 TYPE CAB No. POSITION TB No.
12 135 6
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-4-A TB2-1,2
11GMA11AP002XB05 14 136 1
FAULT
TB1 NTDI01 03CPB02EM001 1-10-C TB4-5,6
- 2
NTDI01 03CPB02EM001 1-10-C TB4-7,8
9WH 9WH
17 133 NTDI01 03CPB02EM001 1-9-D TB3-5,6
10WH 10WH
18 137 NTDI01 03CPB02EM001 1-9-D TB1-1,2

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

CNDR #2 SUMP PIT LVL


SUMP PANEL NO : 21GMA01EC001
TAG NO : 21GMA01CL101
CTB
21GMA4012
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH DCS CABINET NO : 03CPB02EM001
7
- 8WH 8WH 8

3-A-S T/U
21GMA4002
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-5-A PCU MOD SLV
LOOP
1WH 1WH
21GMA01CL101XG01 LVL HH 16 179 1 5 2 3 24
2WH 2WH TB2
15 180 2 5 2 3 30
3-1-B 5 2 3 32
PUMP-A 3WH 3WH SLAVE
21GMA01AP001XB01 10 181 3
RUNNING
4WH 4WH TB3 TYPE CAB No. ROW SLOT
9 182 4
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 2
21GMA01AP001XB05 11 183 5
FAULT
TB3 SPDSI22 03CPB02EA001 5 8
- 6

3-3-B SPDSI22 03CPB02EA001 5 10


PUMP-B 6WH 6WH T/U
21GMA01AP002XB01 13 185 1
RUNNING
7WH 7WH TB4 TYPE CAB No. POSITION TB No.
12 186 2
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-5-A TB2-1,2
21GMA01AP002XB05 FAULT 14 187 3
-
TB4 NTDI01 03CPB02EM001 3-1-B TB3-3,4
4
NTDI01 03CPB02EM001 3-1-B TB3-5,6
9WH 9WH
17 184 NTDI01 03CPB02EM001 3-3-B TB4-1,2
10WH 10WH
18 188 NTDI01 03CPB02EM001 3-3-B TB4-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TBN BLDG MAIN OIL TK AREA #2 OSP LVL


SUMP PANEL NO : 21GMA12EC001
TAG NO : 21GMA12CL101
CTB
21GMA4013
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7 DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

3-B-S T/U
21GMA4003
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-6-A PCU MOD SLV
LOOP
1WH 1WH
21GMA12CL101XG01 LVL HH 16 61 3 5 2 3 25
2WH 2WH TB4
15 62 4 5 2 3 31
3-2-B 5 2 3 33
PUMP-A 3WH 3WH SLAVE
21GMA12AP001XB01 10 63 1
RUNNING
4WH 4WH TB3 TYPE CAB No. ROW SLOT
9 64 2
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 3
21GMA12AP001XB05 11 65 3
FAULT
TB3 SPDSI22 03CPB02EA001 5 9
- 4

3-4-B SPDSI22 03CPB02EA001 5 11


PUMP-B 6WH 6WH T/U
21GMA12AP002XB01 13 67 1
RUNNING
7WH 7WH TB4 TYPE CAB No. POSITION TB No.
12 68 2
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-6-A TB4-3,4
21GMA12AP002XB05 14 69 3
FAULT
TB4 NTDI01 03CPB02EM001 3-2-B TB3-1,2
- 4
NTDI01 03CPB02EM001 3-2-B TB3-3,4
9WH 9WH
17 66 NTDI01 03CPB02EM001 3-4-B TB4-1,2
10WH 10WH
18 70 NTDI01 03CPB02EM001 3-4-B TB4-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TR & CLN/DIRTY OIL TK AREA #2 OSP LVL


SUMP PANEL NO : 29GMA11EC001
TAG NO : 29GMA11CL101
CTB
29GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH 7 DCS CABINET NO : 03CPB02EA001
- 8WH 8WH 8

3-B-S T/U
29GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-6-A PCU MOD SLV
LOOP
1WH 1WH
29GMA11CL101XG01 LVL HH 16 51 1 5 2 3 25
2WH 2WH TB4
15 52 2 5 2 3 31
3-2-B 5 2 3 32
PUMP-A 3WH 3WH SLAVE
29GMA11AP001XB01 10 53 5
RUNNING
4WH 4WH TB4 TYPE CAB No. ROW SLOT
9 54 6
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 3
29GMA11AP001XB05 11 55 7
FAULT
TB4 SPDSI22 03CPB02EA001 5 9
- 8

3-3-B SPDSI22 03CPB02EA001 5 10


PUMP-B 6WH 6WH T/U
29GMA11AP002XB01 13 57 5
RUNNING
7WH 7WH TB1 TYPE CAB No. POSITION TB No.
12 58 6
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-6-A TB4-1,2
29GMA11AP002XB05 FAULT 14 59 7
-
TB1 NTDI01 03CPB02EM001 3-2-B TB4-5,6
8
NTDI01 03CPB02EM001 3-2-B TB4-7,8
9WH 9WH
17 56 NTDI01 03CPB02EM001 3-3-B TB1-5,6
10WH 10WH
18 60 NTDI01 03CPB02EM001 3-3-B TB1-7,8

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
FIELD AREA MAIN CONTROL ROOM
FIELD SYSTEM CABINET

0E

TBN BLDG BFP AREA #2 OSP LVL


SUMP PANEL NO : 21GMA11EC001
TAG NO : 21GMA11CL101
CTB
21GMA4011
CEE(GSWA)-2.5㎟-8C
1WH 1WH 1
COM
L 2WH 2WH
NO 2
3WH 3WH 3
COM
H LS 4WH 4WH
NC 4
5WH 5WH 5
COM
HH 6WH 6WH
NC 6
- 7WH 7WH DCS CABINET NO : 03CPB02EA001
7
- 8WH 8WH 8

3-A-S T/U
21GMA4001
PCU ADDRESS
CEE(OS-GSWA)-1.5㎟-10C 3-6-A PCU MOD SLV
LOOP
1WH 1WH
21GMA11CL101XG01 LVL HH 16 57 5 5 2 3 25
2WH 2WH TB4
15 58 6 5 2 3 19
1-10-D 5 2 3 21
PUMP-A 3WH 3WH SLAVE
21GMA11AP001XB01 10 49 7
RUNNING
4WH 4WH TB1 TYPE CAB No. ROW SLOT
9 50 8
PUMP-A 5WH 5WH SPDSI22 03CPB02EA001 5 3
21GMA11AP001XB05 11 51 1
FAULT
TB2 SPDSI22 03CPB02EA001 4 4
- 2

3-2-A SPDSI22 03CPB02EA001 4 2


PUMP-B 6WH 6WH T/U
21GMA11AP002XB01 13 53 1
RUNNING
7WH 7WH TB4 TYPE CAB No. POSITION TB No.
12 54 2
PUMP-B 8WH 8WH NTDI01 03CPB02EM001 3-6-A TB4-5,6
21GMA11AP002XB05 14 55 3
FAULT
TB4 NTDI01 03CPB02EM001 1-10-D TB1-7,8
- 4
NTDI01 03CPB02EM001 1-10-D TB2-1,2
9WH 9WH
17 52 NTDI01 03CPB02EM001 3-2-A TB4-1,2
10WH 10WH
18 56 NTDI01 03CPB02EM001 3-2-A TB4-3,4

0B
OS

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
MAIN CONTROL ROOM
PDP PANEL SYSTEM CABINET

0D EQUIPMENT NO : 03CPB01EA001
PDP PANEL NO : 03CPB06EZ001 TB1
03CPB2302
PTB-UPSA CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
1 L DCS PANEL
MCB-UPSA01 2WH 2WH
2 N POWER IN (UPS)

0B GN
PE
*NOTE

0D EQUIPMENT NO : 03CPB02EA001

03CPB2303 TB1
CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
3 L DCS PANEL
MCB-UPSA02 2WH 2WH
4 N POWER IN (UPS)

0B GN
PE
*NOTE

0D EQUIPMENT NO : 03CPB03EA001

03CPB2304 TB1
CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
5 L DCS PANEL
MCB-UPSA03 2WH 2WH
6 N POWER IN (UPS)

0B GN
PE
*NOTE

0D EQUIPMENT NO : 03CPB04EA001

03CPB2305 TB1
CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
7 L DCS PANEL
MCB-UPSA04 2WH 2WH
8 N POWER IN (UPS)
0B GN
PE
*NOTE

NOTE : PROJECT :
THAI BINH2
DWG. TITLE
WIRE ARMORING ON POWER CABLES SHALL BE EARTHED ON BOTH ENDS.
THERMAL POWER PLANT 2 x 600MW
0B
MULTI UNIT SHEET
CUSTOMER PROJECT
DWG NO. DWG NO.
MAIN CONTROL ROOM
PDP PANEL SYSTEM CABINET

0D EQUIPMENT NO : 03CPB06EA001
PDP PANEL NO : 03CPB06EZ001
03CPB2301
PTB-UPSA CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
9 1 SERVER RACK
MCB-UPSA05 2WH 2WH
10 2 POWER IN (UPS)
(REAR-TOP SIDE)
0B 3
PE
*NOTE
0C

EQUIPMENT NO : 03CPB06EA001

03CPB2006
PTB-UPSB CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
1 4 SERVER RACK
MCB-UPSB01 2WH 2WH
2 5 POWER IN (UPS)
(REAR-TOP SIDE)
0B 6
PE
*NOTE
0C

NOTE : PROJECT :
THAI BINH2
WIRE ARMORING ON POWER CABLES SHALL BE EARTHED ON BOTH ENDS. DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
0B

MULTI UNIT SHEET


CUSTOMER PROJECT
DWG NO. DWG NO.
MAIN CONTROL ROOM
PDP PANEL SYSTEM CABINET
0C

0D EQUIPMENT NO : 03CPB02EM001
PDP PANEL NO : 03CPB06EZ001 DC 220V MAIN CB
03CPB3302
PTB-DC220-1 CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
1 DC+ DCS PANEL
MCB-DC220-01 2WH 2WH
2 DC- POWER IN (DC)
(REAR-TOP SIDE)
0B GN
PE
*NOTE

EQUIPMENT NO : 03CPB01EA001

03CPB3001 TB2
PTB-DC125-1 CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
1 L DCS PANEL
MCB-DC125-01 2WH 2WH
2 N POWER IN (DC)
0B GN
PE
*NOTE

EQUIPMENT NO : 03CPB02EA001

03CPB3005 TB2
CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
3 L DCS PANEL
MCB-DC125-02 2WH 2WH
4 N POWER IN (DC)

0B GN
PE
*NOTE

0D EQUIPMENT NO : 03CPB03EA001

03CPB3303 TB2
CEE(GSWA)-4.0㎟-3C 0B
1WH 1WH
5 L DCS PANEL
MCB-DC125-03 2WH 2WH
6 N POWER IN (DC)

0B GN
PE
*NOTE

NOTE : PROJECT :
THAI BINH2
WIRE ARMORING ON POWER CABLES SHALL BE EARTHED ON BOTH ENDS. DWG. TITLE
THERMAL POWER PLANT 2 x 600MW
0B

MULTI UNIT SHEET


CUSTOMER PROJECT
DWG NO. DWG NO.
7
8
9
10