तानसेन नगरपालिका

नगर कार्यपालिकाको कार्यालय


लुम्बिनी प्रदेश ,पाल्पा
नेपाल

लागत अनुमान(Estimate)

आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

तानसेन ,पाल्पा

आ.व.२०८०/८१
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
Volume Sheet

आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन


स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw — २०८० पुष मसान्त ah]6 pk lzif{s g+—

Earth Soil Distribution (Ordinary Cut)


Earthw work Earthw
Chainage Length
ork Mean ork
Area Area Volume

Ordinary Ordina Ordinary Soil/Gravel/BMS Soft/Ordinary Rock Hard Rock Remarks


Cut ry Cut Cut
(m) (m) (m2) (m2) (m3) % (m3) % (m3) % (m3)
0+000 0.00 19.50 0.00 0.00 18.00 0.00 80.00 0.00 2.00 0.00
0+005 5.00 42.60 31.05 155.25 18.00 27.95 80.00 124.20 2.00 3.11
0+015 5.00 40.00 41.30 206.50 18.00 37.17 80.00 165.20 2.00 4.13
0+020 5.00 21.30 30.65 153.25 18.00 27.59 80.00 122.60 2.00 3.07
515.00 92.70 412.00 10.30
Page 3 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Supply and Installation standard size sign board for
1 Construction Information (2.5'X4' size metal sheet, frame 1.00 1.00 nos 3000.00 3000.00
and post).( सूचना बोर्ड राखने काम )

Carrying out additional laboratory tests for materials and


2 works as required and instructed by the Engineer. 1.00 1.00 1job 3000.00 3000.00

Roadway excavation in all types of soil as per


Drawing and Technical Specification including removal
3 of stumps and other deleterous matter, all lift and leads as
per Drawing and Instruction of the Engineer.( डोजरबाट माटो
खन्ने काम)
1.00 From volume sheet 92.70

92.70 cum 60.71 5627.82

Roadway excavation in ordinary rock as per


4 Drawing and Technical Specification including all lift and
leads as per Drawing and Instruction of the Engineer.
(Mechanical Means)
1.00 From volume sheet 412.00

412.00 cum 182.14 75041.68

Roadway excavation in hard rock wih rock


breakers including breaking rock lift and lead for
5
disposal as per Drawing and Technical
Specification. (Mechanical Means)

1.00 From volume sheet 10.30

10.30 cum 1678.89 17292.57 50% reuse

Prepared By: Checked By: Approved By:


Page 4 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut

Earthwork in excavation of structure foundation by


2 Manual and disposal materials at suitable site as directed
by Engineer. ( माटो खन्ने काम मान्छे बाट )
Kudule ghar
Column foundation 6.00 1.50 1.50 1.50 20.25
Trench 1.00 3.99 0.35 1.00 1.40

Wall foundation 1.00 25.00 1.00 0.50 12.50

Sub -total 34.15 Cum 589.16 20,119.81


Stone soling work including proper consolidation all
3 complete as per the drawing, specification. ( ढुंगा को सोल्लिंग गर्ने
काम )
footing 6.00 1.50 1.50 0.125 1.69
Floor 1.00 32.17 0.125 4.02

Wall foundation 1.00 25.00 1.00 0.125 3.13

Prepared By: Checked By: Approved By:


Page 5 of 39

तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Sub -total 8.84 Cum 4022.50 35,543.29
PCC works in M15/15 1:2:4 using crusher aggregate,
crusher sand and opc cement Including mixing, placing,
4 compaction, cleaning with wire brush and water in old
concrete surface for laying new concrete and curing with
all complete works. ( ढलान गर्ने काम )
footing 6.00 1.50 1.50 0.10 1.35
Floor 1.00 32.17 0.10 3.22

Wall foundation 1.00 25.00 1.00 0.10 2.50

Sub -total 7.07 Cum 11720.49 82,827.48

Supplying and laying of stone masonary work 1:4


5 cement mortar at all complete work as per instruction of
site engineer ( ढु ङ्गा को गारो लगाउने काम १: ४ सिमेन्ट बालुवा को अनुपात मा )

Trench 1.00 11.40 0.35 1.50 5.99


stairs wall 1.00 32.17 0.50 16.08

-1.00 19.32 0.30 0.20 -1.16

Retaining wall 1.00 25.00 0.70 1.80 31.50 B=(1+0.4)/2

Sub -total 52.42 Cum 10357.80 542,906.85

Prepared By: Checked By: Approved By:


Page 6 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut

PCC works in M20/20 (1:1.5:3) using crusher aggregate,


crusher sand and opc cement Including mixing, placing,
6 compaction, cleaning with wire brush and water in old
concrete surface for laying new concrete and curing with
all complete works. ( ढलान गर्ने काम )

cuboid 6.00 1.50 1.50 0.15 2.03

trapozoidal portion 6.00 0.86 5.13 V=h/3(a1+a2+


(a1*a2))
column
upto plinth level 6.00 0.30 0.30 1.50 0.81
plinth level to roof 6.00 0.30 0.30 4.00 2.16
Beam
tie beam 1.00 11.40 0.23 0.23 0.60
plinth beam 1.00 11.40 0.23 0.30 0.79
3.00 3.70 0.23 0.30 0.77
Slab beam 1.00 11.40 0.23 0.30 0.79
3.00 3.70 0.23 0.30 0.77

Sub -total 13.85 Cum 12681.49 175,674.30


Providing high strengh deformed bars of grade Fe:415
approved reinforcement conforming to IS:1786-1985 for
all slabs, beams, columns staircase and lintels etc.as per
7 the detail and approved teinforcement schedule including
Total length
strengthening,cutting,bending, with all complete work.( छड
बादने काम ) U/wt
Column
16mm dia bar for column 24.00 4.20 100.80 1.58 159.29
12mm dia bar for column 24.00 4.20 100.80 0.89 89.60
8mm dia Stirups outer ring spacing 125mm c/c 202.60 1.07 216.78 0.40 85.64

Prepared By: Checked By: Approved By:


Page 7 of 39

तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
8mm dia Stirups inner ring spacing 125mm c/c 202.60 0.85 172.21 0.40 68.03

12mm dia bar for tie beam 4.00 12.60 50.40 0.89 44.80
0.00 8.20 0.00 0.89 0.00
8mm dia Stirups spacing 125mm c/c 101.80 0.87 88.57 0.40 34.99

16mm dia bar for plinth beam 4.00 12.60 50.40 1.58 79.64
12.00 4.40 52.80 1.58 83.44
8mm dia Stirups spacing 125mm c/c 92.20 0.87 80.21 0.40 31.69
16mm dia bar slab beam 4.00 12.60 50.40 1.58 79.64
12.00 4.30 51.60 1.58 81.54
8mm dia Stirups spacing 125mm c/c 92.20 0.87 80.21 0.40 31.69
30.60 0.87 26.62 0.40

870.00 Kg

Sub -total 0.87 MT 120740.00 105,043.73


Providing, fitting and fixing standard formwork of good
planks or shuttering plywall/ steel including all necessary
8 metal/wooden props, bracing, wedges and nails etc. and
careful removal of form works for all types RCC works all
complete as per drawing,
Column Pad 24.00
1.50 0.10 3.60
Column Pad (Hattipaile) 24.00
1.50 0.25 9.00
Column upto plinth 24.00 0.30 1.50 10.80
Column Plinth to roof 24.00
0.30 4.00 28.80
Tie beam 3.00 11.40 0.23 7.87

Prepared By: Checked By: Approved By:


Page 8 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Plinth beam 3.00
11.40 0.23 7.87
Slab beam 3.00
11.40 0.30 10.26
9.00
3.70 0.30 9.99

Sub -total 88.18 sqm 699.94 61,722.11

जम्मा लागत अनुमान रकम रु. 1127799.64


विनियोजित रकम 1500000.00
कन्टेजेन्सी (२.५ %) रु. 37500.00
मर्मत सम्भार कोस ( २.५ %) रु. 37500.00
खुद जाने रकम रु. 1425000.00
लागत सहभागिता रकम रु. -297200.36 -26.35%
जम्मा रकम रु. 1127799.64

Prepared By: Checked By: Approved By:


Page 9 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Supply and Installation standard size sign board for
1 Construction Information (2.5'X4' size metal sheet, frame 1.00 1.00 nos 3000.00 3000.00
and post).( सूचना बोर्ड राखने काम )

Carrying out additional laboratory tests for materials and


2 works as required and instructed by the Engineer. 1.00 1.00 1job 3000.00 3000.00

Roadway excavation inall types of soil as per Drawing


and Technical Specification including removal of stumps
3 and other deleterous matter, all lift and leads as per
Drawing and Instruction of the Engineer.( डोजरबाट माटो खन्ने
काम)
1.00 From volume sheet 92.70

92.70 cum 60.71 5627.82

Roadway excavation in ordinary rock as per Drawing and


4 Technical Specification including all lift and leads as per
Drawing and Instruction of the Engineer. (Mechanical
Means)
1.00 From volume sheet 412.00

412.00 cum 182.14 75041.68

Roadway excavation in hard rock wih rock breakers


5 including breaking rock lift and lead for disposal as per
Drawing and Technical Specification. (Mechanical Means)

1.00 From volume sheet 10.30

10.30 cum 1678.89 17292.57 50% reuse

Prepared By: Checked By: Approved By:


Page 10 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut

Earthwork in excavation of structure foundation by


2 Manual and disposal materials at suitable site as directed
by Engineer. ( माटो खन्ने काम मान्छे बाट )
Kudule ghar
Column foundation 6.00 1.50 1.50 1.50 20.25
Trench 1.00 3.99 0.35 1.00 1.40
Toilet

Foundation trench 1.00 9.28 0.40 0.60 2.23


Septic tank 1.00 1.80 1.80 1.50 4.86

Sub -total 28.74 Cum 589.16 16,930.81


Stone soling work including proper consolidation all
3 complete as per the drawing, specification. ( ढुंगा को सोल्लिंग गर्ने
काम )
footing 6.00 1.50 1.50 0.125 1.69
Floor 1.00 32.17 0.125 4.02
Toilet

Foundation trench 1.00 9.28 0.40 0.125 1.16


Septic tank 1.00 1.80 1.80 0.125 0.23

Prepared By: Checked By: Approved By:


Page 11 of 39

तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Sub -total 7.10 Cum 4022.50 28,544.14
PCC works in M15/15 1:2:4 using crusher aggregate,
crusher sand and opc cement Including mixing, placing,
4 compaction, cleaning with wire brush and water in old
concrete surface for laying new concrete and curing with
all complete works. ( ढलान गर्ने काम )
footing 6.00 1.50 1.50 0.10 1.35
Floor 1.00 32.17 0.10 3.22
Toilet

Foundation trench 1.00 9.28 0.40 0.10 0.37


Septic tank 1.00 1.80 1.80 0.10 0.32

-1.00 0.79 0.10 -0.08

Sub -total 5.18 Cum 11830.58 61,324.50

Supplying and laying of stone masonary work 1:4


5 cement mortar at all complete work as per instruction of
site engineer ( ढु ङ्गा को गारो लगाउने काम १: ४ सिमेन्ट बालुवा को अनुपात मा )

Trench 1.00 12.00 0.45 1.60 8.64


stairs wall 1.00 32.17 0.50 16.08

-1.00 19.32 0.30 0.20 -1.16


Toilet

Foundation trench 1.00 9.28 0.40 0.60 2.23


Septic tank 1.00 6.00 1.80 1.50 16.20

Sub -total 41.99 Cum 7956.12 334,097.10

Prepared By: Checked By: Approved By:


Page 12 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Supplying and laying of first class brick work 1:4 cement
mortar at all complete work as per instruction of site
3 engineer ( पहिलो तलामा इट्टा को गारो लगाउने काम १: ४ सिमेन्ट बालुवा को अनुपात
मा )
Brick wall 1.00 12.00 0.23 2.30 6.35

1.00 12.00 0.23 1.40 3.86

Door deduction -1.00 2.10 0.23 1.20 -0.58

Window deduction -7.00 0.90 0.23 0.90 -1.30

Toilet
Brick wall 1.00 7.54 0.23 2.30 3.99

1.00 1.20 0.11 2.30 0.30

Door deduction -2.00 2.00 0.23 0.90 -0.83

Ventillation deduction -2.00 0.45 0.23 0.30 -0.06

Sub -total 11.73 Cum 13294.79 155,976.60

PCC works in M20/20 (1:1.5:3) using crusher aggregate,


crusher sand and opc cement Including mixing, placing,
6 compaction, cleaning with wire brush and water in old
concrete surface for laying new concrete and curing with
all complete works. ( ढलान गर्ने काम )

cuboid 6.00 1.50 1.50 0.15 2.03

trapozoidal portion 6.00 0.86 5.13 V=h/3(a1+a2+


(a1*a2))
column
upto plinth level 6.00 0.30 0.30 1.50 0.81
plinth level to roof 6.00 0.30 0.30 4.00 2.16

Prepared By: Checked By: Approved By:


Page 13 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Beam
tie beam 1.00 12.00 0.23 0.23 0.63
plinth beam 1.00 12.00 0.23 0.30 0.83
3.00 3.70 0.23 0.30 0.77
Slab beam 1.00 12.00 0.23 0.30 0.83
3.00 3.70 0.23 0.30 0.77
Lintel 4.00 12.00 0.23 0.125 1.38
Toilet

slab 1.00 2.87 2.11 0.125 0.76

1.00 1.90 1.90 0.100 0.36

Sub -total 16.46 Cum 12681.49 208,747.15

Providing high strengh deformed bars of grade Fe:415


approved reinforcement conforming to IS:1786-1985 for
all slabs, beams, columns staircase and lintels etc.as per
7 the detail and approved teinforcement schedule including
Total length
strengthening,cutting,bending, with all complete work.( छड
बादने काम ) U/wt
Column
16mm dia bar for column 24.00 4.20 100.80 1.58 159.29
12mm dia bar for column 24.00 4.20 100.80 0.89 89.60
8mm dia Stirups outer ring spacing 125mm c/c 202.60 1.07 216.78 0.40 85.64
8mm dia Stirups inner ring spacing 125mm c/c 202.60 0.85 172.21 0.40 68.03

12mm dia bar for tie beam 4.00 13.20 52.80 0.89 46.93
0.00 8.20 0.00 0.89 0.00
8mm dia Stirups spacing 125mm c/c 106.60 0.87 92.74 0.40 36.64

16mm dia bar for plinth beam 4.00 13.20 52.80 1.58 83.44
12.00 4.40 52.80 1.58 83.44
8mm dia Stirups spacing 125mm c/c 97.00 0.87 84.39 0.40 33.34

Prepared By: Checked By: Approved By:


Page 14 of 39

तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
16mm dia bar slab beam 4.00 13.20 52.80 1.58 83.44 2.97 2.97 466.29
12.00 4.30 51.60 1.58 81.54 56299.8546
8mm dia Stirups spacing 125mm c/c 97.00 0.87 84.39 0.40 33.34 4.44 522.81
30.60 0.87 26.62 0.40 63124.0794
12mm dia bar for Lintel 8.00 13.20 105.60 0.89 93.87 119423.934
388.00 0.23 89.24 0.89 79.32

Toilet Slab mainbar 12mm dia spacing 125mm c/c 17.88 2.90 51.85 0.89 46.15
distribution bar 12mm dia spacing 125mm c/c 23.96 9.20 220.43 0.89 196.18 (41,922.69)

Septic tank mainbar 10mm dia spacing 125mm c/c 15.40 1.90 29.26 0.62 18.06
distribution bar 10mm dia spacing 125mm c/c 15.40 1.90 29.26 0.62 18.06

1336.31 Kg

Sub -total 1.34 MT 120740.00 161,346.62


Providing, fitting and fixing standard formwork of good
planks or shuttering plywall/ steel including all necessary
8 metal/wooden props, bracing, wedges and nails etc. and
careful removal of form works for all types RCC works all
complete as per drawing,
Column Pad 24.00
1.50 0.10 3.60
Column Pad (Hattipaile) 24.00 1.50 0.25 9.00
Column upto plinth 24.00 0.30 1.50 10.80
Column Plinth to roof 24.00
0.30 4.00 28.80
Tie beam 3.00 12.00 0.23 8.28

Prepared By: Checked By: Approved By:


Page 15 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Plinth beam 3.00
12.00 0.23 8.28
Slab beam 3.00 12.00 0.30 10.80
9.00 3.70 0.30 9.99
Toilet slab 1.00
2.87 2.11 6.06

Sub -total 95.61 sqm 699.94 66,918.25

Providing and applying 12.5 mm thick Plaster with Cement


9 mortar (cement:sand 1:4) on brickwork in structure as per
Drawing and Technical Specifications
brick wall
2.00 12.57 4.00 100.53
floor
1.00 32.67 32.67
Door deduction
-1.00 2.10 1.20 -2.10
Window deduction
-7.00 0.90 0.90 -6.30
Toilet
brick wall
2.00 8.28 2.30 38.09
floor
2.00 1.20 1.00 2.40
Door deduction
-4.00 2.00 0.90 -7.20
Ventillation deduction
-4.00 0.45 0.30 -0.54

157.54 sqm 340.38 53,625.15


Two coat Exterior weather paint with Prime Coat

brick wall
2.00 12.57 4.00 100.53
floor
1.00 32.67 32.67
Door deduction
-1.00 2.10 1.20 -2.10

Prepared By: Checked By: Approved By:


Page 16 of 39
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
Window deduction
-7.00 0.90 0.90 -6.30
Toilet
brick wall
2.00 8.28 2.30 38.09
floor
2.00 1.20 1.00 2.40
Door deduction
-4.00 2.00 0.90 -7.20
Ventillation deduction
-4.00 0.45 0.30 -0.54

157.54 sqm 291.71 45,957.44

10 cu|fv sf7sf] rf}s; agfO hf]8\g] sfd .


1.00 6.30 0.075 0.075 0.04
7.00 3.30 0.075 0.075 0.13

0.17 cum 242408.28 40,088.27

#* dL=dL= afSnf] lr/fg cu|fv sf7sf] k|m]d xfnL


11 l8nfvfkf agfO{ h8fg ug]{ .

1.00 2.00 1.10 2.20


7.00 0.80 0.80 4.48

6.68 sqm 12682.59 84,719.70

Supplying and instalation of MS steel Pipe and truss with


12 necessary all material at all complete work as per instruction of
site engineer.

3.00 4.30 12.90 2.85 36.77


1.00 0.80 0.80 2.85 2.28

Prepared By: Checked By: Approved By:


Page 17 of 39

तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३ cfly{s jif{—@)८०.*१
;DkGg x'g] cg'dflgt cjlw— ah]6 pk lzif{s g+—
sfdsf] ljj/0f dfkgsf] cfofd
cg'dflgt
qm=;= ;V+of kl/df0f PsfO b/
cfO{6d nDafO{ rf}8fO{ prfO{ cGo b/sf] ;|f]t
hDdf nfut
12.00 2.80 33.60 2.85 95.76
1.00 28.90 28.90 2.20 63.58
24.00 1.30 31.20 2.85 88.92
1.00 49.01 49.01 2.20 107.82

395.13 kg 165.00 65,195.66

dfn;fdfg pknAw u/L sf]?u]6]8 /+lug ss{6kftfsf] 5fgf


13 5fpg] sfd k'/f . -)=$% dL=dL=afSnf] _

Upper roof 1.00 22.87 22.87 A=3.1415*r*l


Lower roof 1.00 20.11 1.30 26.14

49.01 Sqm 1228.54 60,207.55


जम्मा लागत अनुमान रकम रु. 1487648.45
विनियोजित रकम 1500000.00
कन्टेजेन्सी (२.५ %) रु. 37500.00
मर्मत सम्भार कोस ( २.५ %) रु. 37500.00
खुद जाने रकम रु. 1425000.00
लागत सहभागिता रकम रु. 62648.45 4.21%
जम्मा रकम रु. 1487648.45

Prepared By: Checked By: Approved By:


TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

Description of works: Roadway excavation in all types of soil as per Drawing and Technical Specification including removal of stumps and other deleterous
Spec. cl. No: 905
matter, all lift and leads as per Drawing and Instruction of the Engineer.
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty.

Skilled md 1.000 945.00 945.00


9.1.I.B
Unskilled md 3.000 715.00 2145.00
Sub total of A = 3090.00 Sub total of B =
Sub total of A +B + C = 21857.34 Contractor's overhead expenses 15% =

Description of works: Roadway excavation in ordinary rock as per Drawing and Technical Specification including all lift and leads as per Drawing and
Spec. cl. No: 905
Instruction of the Engineer. (Mechanical Means)
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty.

Skilled md 1.000 945.00


9.1.I.B 945.00
Unskilled md 3.000 715.00 2145.00
Sub total of A = 3090.00 Sub total of B =
Sub total of A +B + C = 21857.34 Contractor's overhead expenses 15% =

Description of works: Roadway excavation in hard rock wih rock breakers including breaking rock lift and lead for disposal as per Drawing and Technical
Spec. cl. No: 905
Specification. (Mechanical Means)
Labour (A) Material (B)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty.

Skilled md 1.000 945.00 945.00


9.1.IV.A
Unskilled md 10.000 715.00 7150.00
Sub total of A = 8095.00 Sub total of B =
Sub total of A +B + C = 26862.34 Contractor's overhead expenses 15% =

#REF! husf] vf8ndf 9'+uf eg]{ / n]en ug]{ sfd


C10 #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

>lds HofdL 1.50 hjfg 715.00 1072.50 1072.50


Ans :6f]g 1.00 3=dL= 2450.00 2450.00
lgdf{0f ;fdu|L
jG8 :6f]g 0.20 3=dL= 2500.00 500.00 2950.00
jf:tljs b//]6 4022.5
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
?= 4022.50 k}= hDdf b/ /]6 4022.50

11 ;fx|f] k|sf/sf] Sn], g/d d'/d 9'+uf -#) ;]=dL=;Dd_ ld;]sf] df6f] ;a} lsl;dsf]
B1 vGg] sfd !) dL6/ af]sgL l8:kf]hn / !=% dL6/;Dd lnˆ6 ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
>lds Hofld 0.80 hjfg 715.00 572.00 572.00
oflGqs pks/0f Hofldsf] Hofnfsf] #Ü n] 17.16
jf:tljs b//]6 589.16
!%Ü 7]s]bf/ cf]e/x]8 0.00
b/ k|lt 3=dL=sf] hDdf b/ /]6 589.16
?= 589.16 k}=

#REF! e'O{tNnfdf d]lzgåf/f agfOPsf] O{6f pknAw ug]{,


C1 l;d]G6 d;nf -!M$_ tof/ u/L uf/f] nufpg]
sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.50 hjfg 945.00 1417.50
>lds v_ HofdL 2.20 hjfg 715.00 1573.00
u_ HofdL 0.20 hjfg 715.00 143.00 3133.50
O{6f 530 uf]6f 16.00 8480.00
lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 11700.00 1170.00
afn'jf 0.27 3=dL= 3400.00 918.00
kfgL 120.00 nL6/ 0.40 48.00 10616.00
v6sf] ;ffdfg -u_ sf] #Ü n] 4.29
jf:tljs b//]6 13753.79
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00


?= 13753.79 k}= hDdf b/ /]6 13753.79

!@=% dL=dL= afSnf] l;d]G6 afn'jf -!M$_ df


#REF! l;lnË jfx]s cGoq Knfi6/ ug]{ .
I1 b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 12.00 hjfg 945.00 11340.00
>lds
v_ HofdL 16.00 hjfg 715.00 11440.00 22780.00
l;d]G6 0.538 d]=6= 11700.00 6294.60
lgdf{0f ;fdu|L
afn'jf 1.46 3=dL= 3400.00 4964.00 11258.60

jf:tljs b//]6 34038.60


b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00

34038.60 Ö ?= 340.38 k}= hDdf b/ /]6 34038.60


100

tof/L Knfli6s Odn\;g k]G6 b'O{ sf]6 nufpg] .


1 -Ps sf]6 c:t/ ;lxt_
J5 b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 12.00 hjfg 945.00 11340.00
>lds
v_ HofdL 8.00 hjfg 715.00 5720.00 17060.00
c:t/ 8.10 nL= 310.00 2511.00
lgdf{0f ;fdu|L
tof/L /+u 16.00 nL= 422.00 6752.00 9263.00

jf:tljs b//]6 26323.00


b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00

26323.00 Ö ?= 263.23 k}= hDdf b/ /]6 26323.00


100.00

Two coat Exterior weather paint with Prime Coat

b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]


TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

k|To]s ;|
dob/13.5.ka+kha+ga

;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf

s_ l;kfn' 12.00 hjfg 945.00 11340.00


>lds
v_ HofdL 8.00 hjfg 715.00 5720.00 17060.00
c:t/ 8.1 nL= 310.00 2511.00
lgdf{0f ;fdu|L
j]b/sf]6 16.00 nL= 600.00 9600.00 12111.00

jf:tljs b//]6 29171.00


b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00

29171.00 Ö ?= 291.71 k}= hDdf b/ /]6 29171.00


100
tof/L Ogfd]n k]G6 Ps sf]6 nufpg] .
1 -Ps sf]6 k|fOd/ ;lxt_
J5 b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 8.00 hjfg 945.00 7560.00
>lds
v_ HofdL 5.00 hjfg 715.00 3575.00 11135.00
c:t/ 8.10 nL= 330.00 2673.00
lgdf{0f ;fdu|L
tof/L /+u 9.00 nL= 500.00 4500.00 7173.00
=
jf:tljs b//]6 18308.00
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00

18308.00 Ö ?= 183.08 k}= hDdf b/ /]6 18308.00


100
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

1 %) dL=dL= -@Æ_ afSnf] l;d]G6 s+qmL6 -!M@M$_ ˆnf]/ 9nfg u/L


!!–! Uf l;d]G6 3f]6L tof/ ug]{ .
H1 b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
= s_ l;kfn' 1.25 hjfg 945.00 1181.25
>lds
v_ HofdL 2.50 hjfg 715.00 1787.50 2968.75
l;d]G6 0.17 d]=6= 10700.00 1819.00
lgdf{0f ;fdu|L jfn'jf 0.23 3=dL= 1700.00 391.00
@) dL=dL /f]8f 0.46 3=dL= 1700.00 782.00 2992.00
jf:tljs b//]6 5960.75
b/ k|lt j=dL=sf] =
!%Ü 7]s]bf/ cf]e/x]8 0.00
5960.75 ?= 596.07 k}= hDdf b/ /]6 5960.75
10

1 d]lzgsf] k|of]u u/L hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{
D3 #) dL6/;Dd 9'jfgL ;lxt
-lk=;L=;L= !M@M$_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 0.50 hjfg 945.00 472.50
>lds
v_ HofdL 3.50 hjfg 715.00 2502.50 2975.00
l;d]G6 0.32 d]=6= 11700.00 3744.00
$) dL=dL=9'+uf -qm;\8_ /f]8f 0.52 3=dL= 3300.00 1716.00
@) dL=dL=9'+uf -qm;\8_ /f]8f 0.33 3=dL= 3300.00 1089.00
lgdf{0f ;fdu|L v;|f] afn'jf 0.445 3=dL= 3400.00 1513.00
kfgL 130.00 nL6/ 0.40 52.00
l8h]n 3.00 nL6/ 134.40 403.20
k]6«f]n 0.10 nL6/ 153.10 15.31 8532.51
ldS;/ 0.60 306f 304.97 182.98
oflGqs pks/0f
efOa]|6/ 0.25 306f 120.00 30.00 212.98
jf:tljs b//]6 11720.49
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

?= 11720.49 k}= hDdf b/ /]6 11720.49

1 d]lzgsf] k|of]u u/L ;'k/ :6«Sr/df l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{
D4 #) dL6/;Dd 9'jfgL ;lxt
-lk=;L=;L= !M!=%M#_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 0.50 hjfg 945.00 472.50
>lds
v_ HofdL 3.50 hjfg 715.00 2502.50 2975.00
l;d]G6 0.4 d]=6= 11700.00 4680.00
@) dL=dL=9'+uf -qm;\8_ /f]8f 0.57 3=dL= 3300.00 1881.00
!) dL=dL=9'+uf -qm;\8_ /f]8f 0.29 3=dL= 3400.00 986.00
lgdf{0f ;fdu|L v;|f] afn'jf 0.425 3=dL= 3400.00 1445.00
kfgL 200.00 nL6/ 0.40 80.00
l8h]n 3.00 nL6/ 135.40 406.20
k]6«f]n 0.10 nL6/ 153.10 15.31 9493.51
ldS;/ 0.60 306f 304.97 182.98
oflGqs pks/0f
efOa]|6/ 0.25 306f 120.00 30.00 212.98
jf:tljs b//]6 12681.49
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
?= 12681.49 k}= hDdf b/ /]6 12681.49

sf7df kmdf{ agfpg] sfd, dfn;fdfgsf] pknlAw, 5gf}6 ug]{, gS;f cg';f/ kmdf{ /fVg]
#REF! lsnf / cGt/ nufpg] kmdf{ lemSg], x6fpg] #) ld6/;Dd 9'jfgL ;lxt
kmz{ / :n]j h:tf sfd
b/ ljZn]if0fsf] nflu !) j=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.72 hjfg 945.00 1625.40
>lds
v_ HofdL 2.57 hjfg 715.00 1837.55 3462.95
:yfgLo s'–sf7 0.07 3=dL= 46200.00 3234.00
lgdf{0f ;fdu|L
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३
lgdf{0f ;fdu|L
lsnf 2.50 s]=hL= 121.00 302.50 3536.50
jf:tljs b//]6 6999.45
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
=
6999.45 ?= 699.94 k}= hDdf b/ /]6 6999.45
10
gf]6 M ^ k6s;Dd k|of]u ug{ ;lsg] To; kl5 kmdf{sf] d"No @%Ü afFls /xg] lx;fj ul/Psf] -)=&% X )=%@^Ö)=)& 3=dL=_

9'+ufsf] -/a'n_ uf/f]sf] sfd ;fx|f] Ans:6f]g pknAw ug]{,


#REF! l;d]G6 d;nf !M$ tof/ u/L uf/f] nufpg]
C6 sfd k'/f !) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.50 hjfg 945.00 1417.50
>lds
v_ HofdL 5.00 hjfg 715.00 3575.00 4992.50
l;d]G6 0.159 d]=6= 11700.00 1860.30
afn'jf 0.45 3=dL= 1700.00 765.00
lgdf{0f ;fdu|L Ans :6f]g 1.00 3=dL= 2450.00 2450.00
jG8 :6f]g 0.10 3=dL= 2500.00 250.00
kfgL 100.00 nL6/ 0.40 40.00 5365.30
jf:tljs b//]6 10357.80
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
?= 10357.80 k}= hDdf b/ /]6 10357.80

9'+ufsf] -/a'n_ uf/f]sf] sfd ;fx|f] Ans:6f]g pknAw ug]{,


#REF! l;d]G6 d;nf !M$ tof/ u/L uf/f] nufpg]
C6 sfd k'/f !) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.50 hjfg 945.00 1417.50
>lds
v_ HofdL 5.00 hjfg 715.00 3575.00 4992.50
l;d]G6 0.159 d]=6= 11700.00 1860.30
afn'jf 0.45 3=dL= 1700.00 765.00
lgdf{0f ;fdu|L
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

lgdf{0f ;fdu|L Ans :6f]g 1.00 3=dL= 271.20 271.20


jG8 :6f]g 0.10 3=dL= 271.20 27.12
kfgL 100.00 nL6/ 0.40 40.00 2963.62
jf:tljs b//]6 7956.12
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
?= 7956.12 k}= hDdf b/ /]6 7956.12

cf/=;L=;L= nflu kmnfd] 808L sf6\g], df]8\g]


#REF! gS:ff cg';f/ 7fpFdf /fvL afFWg] sfd
D9 #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! Df]=6= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 12.00 hjfg 945.00 11340.00
>lds
v_ HofdL 12.00 hjfg 715.00 8580.00 19920.00
808L (TMT rod) 1.05 d]=6= 95000.00 99750.00
lgdf{0f ;fdu|L
hL=cfO{=afFWg] tf/ 10.0 s]=hL= 107.00 1070.00 100820.00
jf:tljs b//]6 120740.00
b/ k|lt d]=6=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
?= 120740.00 k}= hDdf b/ /]6 120740.00

1 e'O{tNnfdf d]lzgåf/f agfOPsf] O{6f pknAw ug]{,


C1 l;d]G6 d;nf -!M$_ tof/ u/L uf/f] nufpg]
sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd f]t ;fwgsf]
hDdf
s_ l;kfn' 1.50 hjfg 945.00 1417.50
>lds v_ HofdL 2.20 hjfg 715.00 1573.00
u_ HofdL 0.20 hjfg 715.00 143.00 3133.50
O{6f 530 uf]6f 16.00 8480.00
lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 11700.00 1170.00
afn'jf 0.27 3=dL= 1700.00 459.00
kfgL 120.00 nL6/ 0.40 48.00 10157.00
TANSEN MUNICIPALITY
Office of Municipal Executive, Tansen, Palpa
Rate Analysis
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

v6sf] ;ffdfg -u_ sf] #Ü n] 4.29


jf:tljs b//]6 13294.79
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0.00
?= 13294.79 k}= hDdf b/ /]6 13294.79
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
नेपाल

gfkL lstfa, lan / sfo{;DkGg k|lta]bg

आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन

स्थान: तानसेन १३

तानसेन ,पाल्पा

आ.व.२०७९/८०
तानसेन नगरपालिका म.ले.प.फारम नं: ५०३
नगर कार्यपालिकाको कार्यालय साबिकको फारम नं:१७१

लुम्बिनी प्रदेश ,पाल्पा


नापी किताब
पाना नं:
नापी नं: सम्झौता विवरणः
उपभोक्ता समितिको नामः
सम्झौता भएको मितिः
कार्य सम्पन्न गर्नुपर्ने मितिः
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन कार्य आदेश मितिः
स्थान: तानसेन १३ नापी लिइएको मिति
कार्य सम्पन्न मितिः

काम/सेवाको विवरण अघिल्लो नापी किताबमा चढेको यस नापीको मापनको आयाम यस नापीबाट कायम हालसम्म अध्यावधिक काम भएको परिमाण सूची (BoQ) मा
क्र.सं. भएको परिमाण जम्मा रकम
उल्लिखित दर
क्रियाकलाप परिमाण लम्बाइ चौडाइ उचाइ ..... परिमाण
१ २ ४ ५ ६ ७ ८ ९ १० ११ १२=१०*११

क. जम्मा रकम
ख. …% मु.अ.कर
ग. कु ल जम्मा (क+ख)

उपभोक्ता समितिको सही: नापी लिनेको सही: जाँच गर्नेको सहीः प्रमाणित गर्नेको सहीः
नाम: नाम: नाम: नाम:
पदः पदः पदः पदः
मितिः मितिः मितिः मितिः

नोटः कम्प्युटरबाट नापि किताब तयार गरिएमा प्रिन्ट गरी बाइन्डिङ गर्नु र नापी किताब नियन्त्रण खातामा चढाउनुपर्दछ।

उद्देश्य

निर्माण कार्यको नापीको परिमाण अभिलेख गर्न ।प्रत्येक निर्माण काम ढाँचामा नापी कितावमा अनिवार्य किसिमले राख्न लागउने, नापी किताबमा चढेबमोजिमको कामको मात्र ठेके दारलार्इ भुक्तानी खर्च वा अमानतबाट भएको कामको भुक्तानी गर्न यो फारमको मुख्य उद्देश्य रके को छ ।
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
sfo{ ;DkGg d'Nofs+g k|ltj]bg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन प्रतिवेदनको मितिः
स्थान: तानसेन १३
लागत अनुमानको कु ल रकमः 0 काम सुरु भएको मितिः
खर्च भएको कु ल् रकमः 0 काम सम्पन्न गर्नु पर्ने मितिः
सुरु लागत अनुमान भन्दा घटी बढीको प्रतिशतः #DIV/0! #DIV/0! सम्पन्न भएको मितिः
भेरिएसनपछिको कु ल लागत अनुमान भन्दा घटी बढीको प्रतिशतः

फरक -भेरिएसनपछिको लागत


qm सुरु लागत अनुमान बमोजिमको भेरिएसन भएकोमा सो बमोजिमको कु ल लागत अनुमान खुद भएको कामको फरक -सुरु लागत अनुमानको आधारमा_
कामको विवरण PsfO अनुमानको आधारमा_
=;=
परिमाण दर जम्मा परिमाण दर जम्मा परिमाण दर जम्मा परिमाण दर जम्मा परिमाण दर जम्मा

जम्मा 0

क) स्वीकृ त लागत अनुमान (इष्टिमेट) भन्दा घटि बढी खर्च रू 0.00 al9 वा घटी
उपर्युक्त बमोजिम भएको कार्य सुरु सम्झौताको स्वीकृ त डिजाइन र स्पेसिफिके सन बमोजिम भएको छ/छैन । भेरिएशन आदेश र सर्तहरू बमोजमि
घटी/बढीको पुस्ट्याइँ.................................................................. भए/नभएकोहुँदा उक्त कार्य सम्पन्न भएको स्वीकार/ अस्वीकार गरिएको छ ।

स्वीकृ त लागत अनुमान, डिजाइन र स्पेसिफिके सन अनुसार काम भएको छ भनी सिफारिस गर्ने

तयार गर्नेः जाँच गर्नेः स्वीकृ त गर्ने


सहीः सहीः सहीः
नामM नामः कार्यलय प्रमुखको नामः
दर्जाः दर्जाः दर्जाः

मितिः मितिः मितिः


कै फियत

आदेश र सर्तहरू बमोजमि


तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
pkef]Qmf ;ldltnfO{ e'QmfgL lbg] ljn
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन बिलको क्रम सङ्ख्याः
स्थान: तानसेन १३ कार्य आदेश मितिः 0
काम सम्पन्न गर्नु पर्ने मितिः 0
pkef]Qmf ;ldltsf] vftf gDa/ M म्याद थप/भेरिएसन मितिः
नापी किताब नं काम सम्पन्न भएको मितिः 0
gfkL kl/df0f ;'rL adf]lhdsf] e]l/P;g ePsf]df ;f] adf]lhdsf] xfn;Dd cBfjlw sfd ePsf] cl3Nnf] ljndf r9]sf] xfn ePsf] sfd
lstfasf O{li6d]6 aFfsL
sfdsf] ljj/0f PsfO s}lkmot
] kfgf cf=g kl/df0f
g+= kl/df0f l:js[t b/ hDdf /sd kl/df0f l:js[t b/ hDdf /sd kl/df0f hDdf /sd kl/df0f hDdf /sd kl/df0f hDdf /sd

यो बिलबमोजिम काम भएको जम्मा रूः 0.00 हाल काम भएको बाँकी दिनुपर्ने रूः 0.00 यस बिल बमोजिम गरिएको भुक्तानी
अघिल्लो बिलसम्म भुक्तानी भएको रूः कट्टा गर्नु पर्ने रू भौचर नं:
अघिल्लो भुक्तानी बिलको क्रम सङ्ख्याः क. मोबिलाइजेसन पेस्की रूः भुक्तानी मिति:
अघिल्लो भुक्तानी बिलको भौ=नं= ख. मालसामानको पेस्की रूः भुक्तानी रकम रू
ग. मेसिनरी औजारको बहाल रूः
घ. अग्रीम आय कर रकम रूः
ङ. धरौटी रकम रूः
च. अन्य कट्टी गर्ने पर्ने रकम रूः
खुद दिनु पर्ने रकम रूः

pkef]Qmf ;ldltsf] सहीः तयार गर्नेको सहीः जाँच गर्नेको सहीः स्वीकृ त गर्नेको सहीः
नामM नाम नाम नाम
पदः दर्जाः दर्जाः दर्जाः
मितिः मितिः मितिः मितिः

यो बिल बमोजिम जम्मा रू=============================अक्षरमा============================================================================================================================ को चेक नं==========================================


तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश
lgdf{0f sfo{sf] nfut cg'dfg
आयोजनाको नाम: बौघागुम्बा मगर सांस्कृ तिक संग्राहलय भवन
स्थान: तानसेन १३
;DkGg x'g] cg'dflgt cjlw—
sfdsf] ljj/0f dfkgsf] cfofd
qm=;= ;V+of
cfO{6d nDafO{ rf}8fO{
Supply and Installation standard size sign board for
1 Construction Information (2.5'X4' size metal sheet, frame 1
and post).( सूचना बोर्ड राखने काम )
Earthwork in excavation of structure foundation by
2 Manual and disposal materials at suitable site as directed
by Engineer. ( माटो खन्ने काम मान्छे बाट )
foundation 1 9.00 8.00
Column foundation 9 1.50 1.50
trench 3 3.50 0.40
3 2.50 0.40

Stone soling work including proper consolidation all


3 complete as per the drawing, specification. ( ढुंगा को सोल्लिंग गर्ने
काम )
Column foundation 9 1.50 1.50
trench 3 3.50 0.40
3 2.50 0.40
Floor 1 7.31 6.31

PCC works in M20/20 (1:1.5:3) using crusher aggregate,


crusher sand and opc cement Including mixing, placing,
4 compaction, cleaning with wire brush and water in old
concrete surface for laying new concrete and curing with
all complete works. ( ढलान गर्ने काम )

Column foundation 9 1.50 1.50


trench 3 3.50 0.40
3 2.50 0.40
Floor 1 7.31 6.31

cuboid 9 1.50 1.50


V=1/3(A1+A2+(A1*A2))*H
trapozoidal section 9 0.29
Tie beam 2 4.16 0.23
2 2.95 0.23
6 3.05 0.23
column 9 1.66 0.30
plinth beam 2 4.16 0.23

2 2.95 0.23

6 3.05 0.23

column 9 3.00 0.30


slab beam 2 4.155 0.23

2 2.95 0.23

6 3.05 0.23

cantiliver beam 8 0.6 0.30

slab 1 9.2 8.2

Supplying and laying of stone masonary work 1:4


5 cement mortar at all complete work as per instruction of
site engineer ( ढु ङ्गा को गारो लगाउने काम १: ४ सिमेन्ट बालुवा को अनुपात मा )

trench 3 3.5 0.4

3 2.5 0.4

Supplying and laying of first class brick work 1:4 cement


mortar at all complete work as per instruction of site
6 engineer ( पहिलो तलामा इट्टा को गारो लगाउने काम १: ४ सिमेन्ट बालुवा को अनुपात
मा )
wall 2 4.155 0.23

6 3.05 0.23

partition wall 2 2.95 0.11

Providing high strengh deformed bars of grade Fe:415


approved reinforcement conforming to IS:1786-1985 for
all slabs, beams, columns staircase and lintels etc.as per
7 the detail and approved teinforcement schedule including
strengthening,cutting,bending, with all complete work.( छड
बादने काम )
Footing
12mm dia 109 1.50 163.50
12mm dia 109 1.50 163.50
beam
plinth & slab beam 16mm dia 16 9.20 147.20
24 8.20 196.80
12mm dia 16 9.20 147.20
24 8.20 196.80
column
16mm dia 36 5.30 190.80
12mm dia 36 5.30 190.80
8mm dia Stirups spacing 125mm c/c 891.3333 0.87 775.46
Slab
8mm dia Mainbar spacing 125mm c/c 74.6 9.30 693.78
8mm dia Distribution bar spacing 125mm c/c 66.6 8.20 546.12

Providing, fitting and fixing standard formwork of good


planks or shuttering plywall/ steel including all necessary
8 metal/wooden props, bracing, wedges and nails etc. and
careful removal of form works for all types RCC works all
complete as per dwawing,
column 9
3.00 1.20
slab beam 2 4.155
1.06
2 2.95
1.06
6 3.05
1.06
Slab 1
9.20 8.20

Supplying and instalation of MS steel Pipe and trush roof with


9 necessary all material at all complete work as per instruction of
site engineer
Post 11
2.50 27.50

Wire mesh Net for Fencing


10
Boundry 1
11.00 1.50
तानसेन नगरपालिका
नगर कार्यपालिकाको कार्यालय
लुम्बिनी प्रदेश ,पाल्पा
gdf{0f sfo{sf] nfut cg'dfg

cfly{s jif{—@)&(.*)
ah]6 pk lzif{s g+—
dfkgsf] cfofd cg'dflgt
kl/df0f PsfO b/
prfO{ cGo hDdf nfut b/sf] ;|f]t

1.00 nos 3000.00 3000.00

0.30 21.60
1.50 30.38

0.80 3.36

0.80 2.40

Sub -total 36.14 Cum 589.16 21,292.24

0.12 2.43

0.12 0.50

0.12 0.36

0.12 5.54

Sub -total 3.29 Cum 4022.50 13,234.03

0.08 1.62

0.08 0.34

0.08 0.24

0.08 3.69

0.15 3.04
1+A2+(A1*A2))*H
0.29 2.62

0.23 0.44
0.23 0.31

0.23 0.97

0.30 1.34

0.30 0.57

0.30 0.41
0.23 0.97

0.30 2.43

0.30 0.57

0.30 0.41

0.30 1.26

0.30 0.43

0.125 9.43

Sub -total 31.09 Cum 12305.50 382,621.46

1.50 6.30

1.50 4.50

Sub -total 10.80 Cum 7956.12 85,926.10

3.00 5.73

3.00 12.63

3.00 1.94

Sub -total 20.30 Cum Err:509 Err:509

0.89 145.33
0.89 145.33

1.58 232.58
1.58 310.94
0.89 131.01
0.89 175.15
0.00
1.58 301.46
0.89 169.60
0.40 306.31

0.40 274.04
0.40 215.72

2407.48 Kg

Sub -total 2.41 MT 120740.00 290,678.88

32.40

8.81

6.24

19.40

75.44

Sub -total 142.29 sqm 756.64 107,662.31

2.2kg/mtr 60.50

Sub -total 60.50 kg 150.00 9,075.00

16.50

Sub -total 16.50 SQM 603.71 9,961.19


जम्मा लागत अनुमान रकम रु. Err:509
विनियोजित रकम 250000.00
कन्टेजेन्सी (२.५ %) रु. 6250.00
मर्मत सम्भार कोस ( २.५ %) रु. 6250.00
खुद जाने रकम रु. 237500.00
लागत सहभागिता रकम रु. Err:509 Err:509
जम्मा रकम रु. Err:509