Canduman Fabrication Area
Canduman Fabrication Area
CONTRACTORS / BIDDERS
ITEM
DESCRIPTION
No.
EDNAVA Construction SSIMC TransTech Albatech
Electrical Works
Installation of Exhaust Fans
Relocation of Condensing Units
Installation of ACU
ACCURACY RATING
COST (35%) - lowest compared to baseline cost
BASELINE COST
DIFFERENCE
COST RATING
TIME (35%) - lowest compared to baseline schedule
BASELINE SCHEDULE
DIFFERENCE
TIME RATING
TOTAL RATING
REMARKS REMARKS REMARKS REMARKS
EVALUATION :
PREPARED AND CHECKED BY: APPROVALS:
DATE: MANAGER
ITEM NO. DESCRIPTION
1.0 GENERAL REQUIREMENTS
1.1 Mobilization
1.2 Demolization
1.3 Safety Requirements
7.0 OTHERS
7.1 Contractor's Profit
7.2 Contingency
7.3 VAT
TOTAL COST
QTY UNIT UNIT COST TOTAL
GENERAL REQUIREMENTS
1 lot ₱ 5,000.00 ₱ 5,000.00
1 lot ₱ 5,000.00 ₱ 5,000.00
1 lot ₱ 5,000.00 ₱ 5,000.00
SUB-TOTAL 15,000.00
ROVISION FOR CONCRETE FLOORING
bag ₱ 290.00 ₱ -
cu. m ₱ 2,000.00 ₱ -
cu. m ₱ 2,000.00 ₱ -
lengths ₱ 380.00 ₱ -
kg ₱ 85.00 ₱ -
lengths ₱ 720.00 ₱ -
lengths ₱ 180.00 ₱ -
1 lot ₱ - ₱ -
SUB-TOTAL -
TRUCTURE WITH ROOFING & RAFTER
length ₱ 1,542.00 ₱ -
length ₱ 500.00 ₱ -
sheet ₱ 550.00 ₱ -
lengths ₱ 168.00 ₱ -
lengths ₱ 249.00 ₱ -
lm ₱ 704.72 ₱ -
lengths ₱ 515.00 ₱ -
rolls ₱ 1,509.00 ₱ -
lengths ₱ 780.00 ₱ -
lengths ₱ -
25 pcs ₱ 80.00 ₱ 2,000.00
10 pcs ₱ 75.00 ₱ 750.00
15 kilo ₱ 137.00 ₱ 2,055.00
1 lot ₱ 240.25 ₱ 240.25
SUB-TOTAL 5,045.25
HINE/TOOLS ENCLOSURE FABRICATION MACHINE/TOOLS ENCLOSUR
lengths
lengths
sheet
lot
SUB-TOTAL -
ELECTRICAL WORKS
1 ROLL ₱ 690.00 690.00
2 PCS ₱ 690.00 1,380.00
4 PCS ₱ 86.00 344.00
4 PCS ₱ 14.33 57.32
2 PCS ₱ 10.35 20.70
1 ROLL ₱ 150.00 150.00
1 lot ₱ 132.10 132.10
SUB-TOTAL 2,774.12
TOTAL DIRECT COST: 7,819.37
No. Man No. of
Cost/Day TOTAL
power Days
LABOR WORKS
600 ₱ -
680 ₱ -
2 1 680 ₱ 1,360.00
SUB-TOTAL ₱ 1,360.00
OTHERS
1,376.91
917.94
1,101.52
SUB-TOTAL 3,396.37
₱ 27,575.74
MACHINE/TOOLS ENCLOSURE FABRICATION
AREA
L 12 m
W 5m
FLOOR
Cement 45
Sand 3
Gravel 6
10mm 41
Tie Wire 3
Plywood 3.4 sq.m
1.180556 sheet
Lumber 34 m
3.4 m
37.4 m
12.46667 length
PEDESTAL
Cement 2
Sand 0.1
Gravel 0.2
10mm 8
12mm 6
Tie Wire 1
Plywood 1 sq.m
Lumber 3 length
FOOTING
Cement 2
Sand 0.1
Gravel 0.2
12mm 3
Tie Wire 0.6
TOTAL
Cement 49 bags
Sand 3.2 cu.m.
Gravel 6.4 cu.m.
10mm 49 length
12mm 9 length
Tie Wire 4.6 kilo
Plywood 2.18 sheet
Lumber 15.47 length