TECHNICAL EVALUATION

PROJECT TITLE: Construction of Mezzanine at Packaging Materials Preparation Area

CONTRACTORS / BIDDERS
ITEM
DESCRIPTION
No.
EDNAVA Construction SSIMC TransTech Albatech

ACCURACY (35%) - closest to Baseline BOM


1 BOM
2 Drawing of Plans
3 Permits
4 Materials Supply
5 Labor Supply
6 Scope of Works
Preliminaries
Demolition and Excavation
Structural Works
Architectural Finishes

Electrical Works
Installation of Exhaust Fans
Relocation of Condensing Units
Installation of ACU
ACCURACY RATING
COST (35%) - lowest compared to baseline cost
BASELINE COST
DIFFERENCE
COST RATING
TIME (35%) - lowest compared to baseline schedule
BASELINE SCHEDULE
DIFFERENCE
TIME RATING
TOTAL RATING
REMARKS REMARKS REMARKS REMARKS

EVALUATION :
PREPARED AND CHECKED BY: APPROVALS:

DATE: MANAGER
ITEM NO. DESCRIPTION
1.0 GENERAL REQUIREMENTS
1.1 Mobilization
1.2 Demolization
1.3 Safety Requirements

2.0 PROVISION FOR CONCRETE FLO


2.1 Cement (PortLand)
2.2 Sand
2.3 Gravel
2.4 Deformed Bar 10mm
2.5 Tie Wire #16
2.6 Plywood (4'x8'x1/2")
2.7 Coco Lumber (2" x 2" x 12')
2.9 Consumables

3.0 STRUCTURE WITH ROOFING & R


3.1 GI Pipe 2" Ø
3.2 GI Pipe 4" Ø
3.3 Steel Matting 1/8"Ø X2"X2"X4'X8'MS/A36
3.4 Deformed Bar 10mm
3.5 Deformed Bar 12mm
3.6 PRE-PAINTED RIB TYPE ROOF SHEET
3.7 C-PURLINS 2'' X 4''
3.8 PLAIN G.I SHEET #16
3.9 ANGLE BAR 3'' X 3''
4.0 I-BEAM
4.1 Cutting disc
4.2 Grinding disc
4.3 Welding rod 6011
4.4 Consumables

4.1 MACHINE/TOOLS ENCLOSURE FAB


4.1 GI Pipe 2" Ø
4.2 ANGLE BAR 1'' X 1''
4.3 2'' X 2'' WIREMESH
4.4 Consumables

5.0 ELECTRICAL WORKS


5.1 THW 80mm Electrical Wire
2

5.2 3 GANG EXPLOSION PROOF OUTLET


5.3 JUNCTION BOX
5.4 UTILITY BOX
5.5 WEATHER PROOF LIGHTING WITH FIXTURE
I 5.6 FLEXIBLE HOSE 1/2
5.7 Consumables

ITEM NO. DESCRIPTION

6.0 LABOR WORKS


6.1 Area Preparation
6.2 Structural Works
6.3 Electrical Works

7.0 OTHERS
7.1 Contractor's Profit
7.2 Contingency
7.3 VAT

TOTAL COST
QTY UNIT UNIT COST TOTAL
GENERAL REQUIREMENTS
1 lot ₱ 5,000.00 ₱ 5,000.00
1 lot ₱ 5,000.00 ₱ 5,000.00
1 lot ₱ 5,000.00 ₱ 5,000.00
SUB-TOTAL 15,000.00
ROVISION FOR CONCRETE FLOORING
bag ₱ 290.00 ₱ -
cu. m ₱ 2,000.00 ₱ -
cu. m ₱ 2,000.00 ₱ -
lengths ₱ 380.00 ₱ -
kg ₱ 85.00 ₱ -
lengths ₱ 720.00 ₱ -
lengths ₱ 180.00 ₱ -
1 lot ₱ - ₱ -
SUB-TOTAL -
TRUCTURE WITH ROOFING & RAFTER
length ₱ 1,542.00 ₱ -
length ₱ 500.00 ₱ -
sheet ₱ 550.00 ₱ -
lengths ₱ 168.00 ₱ -
lengths ₱ 249.00 ₱ -
lm ₱ 704.72 ₱ -
lengths ₱ 515.00 ₱ -
rolls ₱ 1,509.00 ₱ -
lengths ₱ 780.00 ₱ -
lengths ₱ -
25 pcs ₱ 80.00 ₱ 2,000.00
10 pcs ₱ 75.00 ₱ 750.00
15 kilo ₱ 137.00 ₱ 2,055.00
1 lot ₱ 240.25 ₱ 240.25
SUB-TOTAL 5,045.25
HINE/TOOLS ENCLOSURE FABRICATION MACHINE/TOOLS ENCLOSUR
lengths
lengths
sheet
lot
SUB-TOTAL -
ELECTRICAL WORKS
1 ROLL ₱ 690.00 690.00
2 PCS ₱ 690.00 1,380.00
4 PCS ₱ 86.00 344.00
4 PCS ₱ 14.33 57.32
2 PCS ₱ 10.35 20.70
1 ROLL ₱ 150.00 150.00
1 lot ₱ 132.10 132.10
SUB-TOTAL 2,774.12
TOTAL DIRECT COST: 7,819.37
No. Man No. of
Cost/Day TOTAL
power Days
LABOR WORKS
600 ₱ -
680 ₱ -
2 1 680 ₱ 1,360.00
SUB-TOTAL ₱ 1,360.00
OTHERS
1,376.91
917.94
1,101.52
SUB-TOTAL 3,396.37

₱ 27,575.74
MACHINE/TOOLS ENCLOSURE FABRICATION
AREA
L 12 m
W 5m

FLOOR
Cement 45
Sand 3
Gravel 6
10mm 41
Tie Wire 3
Plywood 3.4 sq.m
1.180556 sheet
Lumber 34 m
3.4 m
37.4 m
12.46667 length

PEDESTAL
Cement 2
Sand 0.1
Gravel 0.2
10mm 8
12mm 6
Tie Wire 1
Plywood 1 sq.m
Lumber 3 length

FOOTING
Cement 2
Sand 0.1
Gravel 0.2
12mm 3
Tie Wire 0.6

TOTAL
Cement 49 bags
Sand 3.2 cu.m.
Gravel 6.4 cu.m.
10mm 49 length
12mm 9 length
Tie Wire 4.6 kilo
Plywood 2.18 sheet
Lumber 15.47 length