QUOTATION

Date : APRIL 26, 2024


PROJECT : GOLD MANSION PROJECT
SUBJECT : INSTALLATION OF ELECTRICAL DEVICES AND INSULATION RESISTANCE TEST

Material Labor
ITEM/DESCRIPTION QTY. UNIT TOTAL COST
Unit Cost Total Cost Unit Cost Total Cost

ELECTRICAL WORKS

INSULATION RESISTANCE TEST/MEGGER TEST 1 lot - - 7,000.00 7,000.00 7,000.00

INSTALLATION OF TROFFER LIGHT 16 pcs - - 1,000.00 16,000.00 16,000.00

INSTALLATION OF PINLIGHT 16 pcs - - 900.00 14,400.00 14,400.00

INSTALLATION OF CONVENIENCE OUTLET 18 pcs - - 600.00 10,800.00 10,800.00

INSTALLATION OF SWITCH 6 pcs - - 400.00 2,400.00 2,400.00

INSTALLATION OF EMERGENCY LIGHT 4 pcs - - 800.00 3,200.00 3,200.00

INSTALLATION OF EXIT LIGHT 4 pcs - - 800.00 3,200.00 3,200.00

OTHERS (WIRING-INS AT T&B) 1 lot - - 3,000.00 3,000.00 3,000.00

OTHERS

TOTAL 60,000.00
DISCOUNTED 5,000.00
GRAND TOTAL 55,000.00

NOTE: 1. PANELBOARDS, ELECTRICAL DEVICES, WIRES & MATERIALS ARE TO BE PROVIDED BY OTHERS/OWNER.
2. ELECTRICAL LAYOUT PLANS & LOAD SCHEDULES ARE TO BE PROVIDED BY CLIENT/OWNER
3. THIS QUOTATION IS FOR INSTALLATION & TESTING OF ELECTRICAL DEVICES STATED ABOVE ONLY.
4. ITEMS THAT NOT STATED IN THE COST BREAKDOWN & FREE OF CHARGE ARE INSTALLATION & TERMINATION OF PANELBOARD AND COMPLETION OF ELECTRICAL
LAYOUT & WIRING-INS FOR LIGHTINGS ONLY.