Professional Documents
Culture Documents
Umair SB Netmetring
Umair SB Netmetring
Installatation &
5 Installation and commissioning 15,000 1 15,000
Commissioning
6 0
7 0
8 0
9 0
#NAME?
¬ Transportation cost for the systems out of Lahore will cost as per actual.
Terms & Conditions:
Product Warranty:
Product Warranty
Inverter
Batteries
Note: Panels
These warranties are subject to the manufacturer’s terms and conditions.
These Prices are Exclusive of GST
Internal wiring cost is not in our scope/Job discription Hence It is not mentioned in Quotation .
If distance from PV to Inverter is more than 140 ft, than additional cost will be charge as per actual
It is an initial quote, Final quotation will be forwarded after site survey and consent of the client if agreed on the general prices of the product.
Payment Terms:
Price: Prices are valid for 1 Day
Payment Mode: 100% at the time of order
Order Confirmation: Order will be confirmed upon receiving of 100% advance payment