Korea, Republic of 2019-12-09 2019-12-13 2020-01-10: New Work Item Proposal (NP)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

77B/826/NP

NEW WORK ITEM PROPOSAL (NP)

P ROPOSER : D ATE OF PROPOSAL :

Korea, Republic of 2019-12-09

D ATE OF CIRCULATION : C LOSING DATE FOR VOTING :

2019-12-13 2020-01-10

IEC SC 77B : H IGH FREQUENCY PHENOMENA

S ECRETARIAT : S ECRETARY :

France Mr Franck GRUFFAZ

N EED FOR IEC COORDINATION : P ROPOSED HORIZONTAL STANDARD :

CIS/A,CIS/F, CIS/H, CIS/I


Other TC/SCs are requested to indicate their interest, if any, in
this NP to the TC/SC secretary

F UNCTIONS CONCERNED :
EMC E NVIRONMENT Q UALITY ASSURANCE S AFETY

T ITLE OF PROPOSAL :

Electromagnetic compatibility (EMC) - Part 4-xx: Testing and measurement techniques -


Broadband radiated immunity test

S TANDARD T ECHNICAL SPECIFICATION

P ROPOSED PROJECT NUMBER : 61000-4

S COPE
( AS DEFINED IN ISO/IEC D IRECTIVES , P ART 2, 14):

The aim of this document is to prepare a new part of the IEC 61000-4 series, regarding immunity
requirements and test methods for broadband radiated disturbance. The goal of this new part is to
evaluate the interference caused by broadband digital modulation signals in the test frequency
band, along with reducing the time for testing the electromagnetic immunity to this phenomena in
the frequency range of above 80 MHz. For examples of broadband signal, there are LTE signals
and 5G mobile communication signals.

P URPOSE AND JUSTIFICATION


INCLUDING THE MARKET RELEVANCE , W HETHER IT IS A PROPOSED HORIZONTAL STANDARD (G UIDE 108) AND RELATIONSHIP TO
S AFETY (G UIDE 104), EMC (G UIDE 107), E NVIRONMENTAL ASPECTS (G UIDE 109) AND Q UALITY ASSURANCE (G UIDE 102):

Modern digital communication signals operate on multiple frequencies (such as OFDM) and use
bandwidths ranging from tens of MHz to hundreds of MHz, all while employing in-band time-division
multiplexing (TDM) transmission technology. Such broadband signals could cause a performance
degradation and/or malfuction of other equipment. In this case, the disturbance is not a frequency
sweep but a broadband signal with coexisting multiple frequencies.

Copyright © 2019 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.
2

77B/826/NP

T ARGET DATE ( S ) FOR FIRST 2021-12-06 FOR IS: 2023-12-12


CD:

E STIMATED NUMBER OF F REQUENCY OF MEETINGS : D ATE OF FIRST MEETING : P LACE OF FIRST MEETING :
MEETINGS :

7 2 per year 2020-12-05 USA

R ELEVANT DOCUMENTS TO BE CONSIDERED :

IEC 61000-4-3

R ELATIONSHIP OF PROJECT TO ACTIVITIES OF OTHER INTERNATIONAL BODIES :

L IAISONS W ITH INTERNATIONAL BODIES : N EED FOR ISO COORDINATION :

D OCUMENT MATURITY :
A DRAFT IS ATTACHED FOR COMMENT * AN OUTLINE IS ATTACHED

* Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.

C ONCERNS KNOW N PATENTED ITEMS ( SEE ISO/IEC D IRECTIVES , P ART 1) Y ES NO

P ATENT DESCRIPTION :

W E NOMINATE A PROJECT LEADER IN ACCORDANCE W ITH ISO/IEC D IRECTIVES , P ART 1


L AST NAME : F IRST NAME : E- MAIL : C OUNTRY :

Hongsik Keum hskeum@rapa.or.kr Korea, Republic of

C OMMENTS AND RECOMMENDATIONS FROM TC/SC OFFICERS :


W ORK ALLOCATION :
N EW PROJECT TEAM N EW W ORKING GROUP E XISTING W ORKING GROUP : WG 10

I F APPROVED , THE NEXT STAGE SHOULD BE :


CD CDV

R EMARKS FROM TC/SC OFFICERS :

This topic was discussed during last SC77B plenary meeting, see Decision 11 of 77B/819/DL

A PPROVAL CRITERIA
• Approval of the new work item proposal by a 2/3 majority of the P-members voting;
• At least 4 P-members in the case of a committee with 16 or fewer P-members, or at least 5 P-members in the case of
committees with more than 17 P-members, have nominated or confirmed the name of an expert and approved the
new work item proposal.
3

77B/826/NP

OUTLINE OF WORK FOR BROADBAND RADIATED IMMUNITY (see also 77B/816/INF)


1 Scope and object
The work is to develop a new basic standard to cover the threat posed by broadband signals from
recent mobile communication and to reduce test time of radiated immunity using broadband signal.

2 Normative references
3 Terms and definitions
4 General
Background to the need for the test and applicability

5 Test levels
Define the broadband signals to be applied based on the interfering signals

6 Test equipment
6.1 Test instrumentation
A description of the test equipment, preferably based on existing equipment as VSG

6.2 Description of the test facility


IEC 61000-4-3 is a likely starting point

6.3 UFA
IEC 61000-4-3 is a likely starting point

7 Test setup
IEC 61000-4-3 is a likely starting point

8 Test procedure
IEC 61000-4-3 is a likely starting point

9 Evaluation of test results


IEC 61000-4-3 is a likely starting point

10 Test report
IEC 61000-4-3 is a likely starting point

You might also like