Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

SANKYU (S) PTE LTD

CENTRIFUGAL PUMP CHECKLIST

Page:
SYSTEM NO: CONTRACT NO: ###
MECH EQUIP NO: P&ID NO:
DRAWING NO: REV: VEND DWG NO: REV:
DESCRIPTION: CON AREA ID:

1.0 GENERAL The following items have been inspected and verified; YES N/A NO
1. There is no visual damage to the equipment
2. Civil foundation release record complete
3. Structural steelwork release complete
4. Temporary shipping items removed
5. Mechanical seal / packing installed as per GA / P&ID
6. Equipment has been aligned and levelled
7. Primary cold alignment complete
8. Connecting flange alignment complete
9. Equipment is released for grouting complete
10. Jackscrews removed and foundation bolts tightened
11. Inspection, maintenance record card updated
12. The item is clean and free from debris internally and externally
13. Equipment installed in accordance with drawings
14. Client Asset Numbers verified
15. Equipment Tag number verified
16. Pump vents and drains fitted
17. Coupling installed
18. Final cold alignment record complete
19. Coupling guard fitted
20. Preservation covers removed
21. Impeller clearance set and recorded. Value: ……………… (mm)
Remarks* / No Remarks* (*Delete as applicable)

COMPLETED BY SANKYU CARIFLEX


COMPANY
SIGNATURE
NAME
DATE
REV:

NO

You might also like