Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

EVONIK METHIONINE SEA PTE LTD

Evonik Methionine 6 (Me6) Project

RECIPROCATING PUMP CHECKLIST

Page:
SYSTEM NO: AmecFW CONTRACT NO: ###
MECH EQUIP NO: P&ID NO:
DRAWING NO: REV: VEND DWG NO: REV:
DESCRIPTION: CON AREA ID:

1.0 GENERAL The following items have been inspected and verified; YES N/A NO
1. Rotation and lubrication check record AmecFW-3313 up to date
2. Equipment foundation release record AmecFW-3344 complete
3. Equipment grout release record AmecFW-3345 complete
4. Primary cold alignment record AmecFW-3314 complete
5 Jackscrews removed and foundation bolts tightened.
6. Bearing housing flushed and lubricated. Type of lubricant: …………………………………
7. Motor bearing checked and lubricated
8. Mechanical seal or packing installed. Type of seal: ……………………………………..
9. Pump and motor dowelled
10. Pump vent and drains fitted
11. Pump harness fitted
12. Suction and discharge piping record AmecFW-6942 complete
13. Temporary suction screen fitted
14. Pipe supports fitted and adjusted
15. Coupling installed and lubricated
16. Coupling guard fitted
17. Control devices and systems fitted
18. Motor inspection protection record AmecFW-3404 complete
19. Electrical motor running record AmecFW-3400 complete
20. Final cold alignment record AmecFW-3314 complete

Remarks* / No Remarks* (*Delete as applicable)

COMPLETED BY Contractor Amec Foster Wheeler Owner (If Applicable)


COMPANY
SIGNATURE
NAME
DATE
AmecFW-3316 Rev 2
NO

Applicable)

You might also like