24-CHE-3925PRO-METR - TC Super Metro Toledo - STP Design and Build-BID FORM - Feb. 13 2024.rev.1xlsx
24-CHE-3925PRO-METR - TC Super Metro Toledo - STP Design and Build-BID FORM - Feb. 13 2024.rev.1xlsx
24-CHE-3925PRO-METR - TC Super Metro Toledo - STP Design and Build-BID FORM - Feb. 13 2024.rev.1xlsx
3500000
3000000
2500000
2000000
1500000
1000000
500000
0
WELDON Metal Furring Submersible Pump BALL VALVES Sub Total BALL VALVES
2 3 4 5 6 7 7 8
Unit 1 1 1 1 1 1 1 1 1 1 Qty. lot lot lot lot lot lot lot lot lot lot
Unit Cost Matls Others LABOR
Cost 373,144.00 286,744.00 Total Amount 373,144.00 286,744.00 by Others by Others INCLUDED
PROJECT:
LOCATION: TAGBILRAN BOHOL
PACKAGE: DESIGN AND BUILD FOR SEWAGE TREATMENT PLANT TO DAO 2016-08
PROPOSED SYSTEM:
Quotation Ref.: 24-CHE-3925PRO-METR.TC
Date APRIL 26, 2024
BILL OF QUANTITIES Unit Cost
Item Description Unit Qty. Matls Others Cost Total Amount
General Requirements 1 lot LABOR
Mobilization / Demobilization 1 lot 373,144.00 373,144.00
Bonds & Insurances 1 lot 286,744.00 286,744.00
a. Performance Bond 1 lot
b. CARI 1 lot
c. Surety Bond 1 lot
1 Temporary Utilities 1 lot
a. Power 1 lot by Others
b. Water 1 lot by Others
Site supervision 1 lot INCLUDED
Safety & Housekeeping (including Health) 1 lot 382,344.00 382,344.00
Sub Total
1,042,232.00
Design & Engineering (Engineering Designed Process, As-built drawings,
Operation Manuals, Schedmatic Diagrams and Specifications, Site
supervision)
Permit and licenses - Does this include all the fees necessary
documents (except for MRSGI docs), plans (signed and sealed included 394,580.00 394,580.00
2 plans), coordination, and application to OBO and MRSGI.
Sub Total
394,580.00
Civil and Structural Works AND FABRICATIONS (All materials involved for
the standard construction of Tanks, STP Facility, Security Access, Masonry
Works and others)
Sub Total
993,132.00
MECHANICAL and PLUMBING WORKS (All materials involved for the
standard installation of Air, Supply water, drain and Waste Water Lines)
1,837,080.00 1,141,920.00 2,979,000.00
EQUALIZATION FINE BUBBLE DIFUSERS 30 PCS
MBBR BIOFILTER .27MG 2 M3
Submersible Pump 2 pc
abs pipes 2 1/4 INCH DIA 10 pcs
FLOAT SWITCHES 2 pcs
BALL VALVES 6 pcs
Gate Valves 6 pcs
4
SLUDGE
abs pipes 10 pcs
BALL VALVES 4 pcs
Submersible Pump 2 pcs
CHOLORONATION
Dosing Pump 1 pc
Dosing Tank 1 pc
abs Pipe 2 pcs
CLARIFIER
Submersible Pump 1 pcs
Abs 1 pcs
EFFLUENT/INFLUENT
flow meter 2 pcs
abs pipe 2 pcs
Sub Total
2,979,000.00
ELECTRICAL WORKS (All materials needed for standard installation of power
supply quipments and other utilities like lighting, outlets and necessary
accessories and devices, Hanger and supports )
CONTROL PANEL SETS CABINET TYPE 1 PCS 579,600.00 259,000.00 838,600.00
5 LIGHTS 5 PCS
DO METER 1 PCS
4 PCS
Sub Total
838,600.00
INSTRUMENTATION & CONTROL (Control Panel, relay, sensors, and
accessories, Sub kW-hr Meter)
7
INCLUDED TO MECHANICAL WORKS
INCLUDED TO DOCUMENTATIONS
INCLUDED 1 year
10
Sub Total
201,600.00
Sub-Total Price: 6,449,144.00
Discounted Amount: 257,965.76
TOTAL COST LESS DISCOUNT 6,191,178.24
TOTAL BID, PRICE:/ Vat.- Inc.: PHP 6,934,119.63
Disocunted Price: 6,865,464.98
Final Discounted Price: PHP 9,200,351.00
Terms of Payment: 60 PERCENT DP/30 PERCENT COMPLETION/10 PERCENT RETENTION
Completion: 60 TO 90 DAYS
Mobilization: 2 WEEKS AFTER DP RECEIVED
Warranty (Equipment & Workmanship): 1 YEAR WORK PE4RFORMANCE AND MACHINERIES
Notes:
All line items, shall be provided with materials and labor cost breakdown