POWER MECH PROJECTS LIMITED

May'24 Day Wise Erection Plan of ESP Unit - 3 of 2X800MW


W1 W2 W3 W4 W5
May'24 Grand
Si.No Description UOM REMARK
Plan 01 May 2024 02 May 2024 03 May 2024 04 May 2024 Total 05 May 2024 06 May 2024 07 May 2024 08 May 2024 09 May 2024 10 May 2024 11 May 2024 Total 12 May 2024 13 May 2024 14 May 2024 15 May 2024 16 May 2024 17 May 2024 18 May 2024 Total 19 May 2024 20 May 2024 21 May 2024 22 May 2024 23 May 2024 24 May 2024 25 May 2024 Total 26 May 2024 27 May 2024 28 May 2024 29 May 2024 30 May 2024 31 May 2024 Total Total
S

4.0 21.0 24.0 27.0 76.0 8.0 23.0 24.0 22.0 25.0 17.0 25.0 144.0 9.0 25.0 22.0 24.0 80.0 7.0 23.0 25.0 55.0 0.0 355.0
1 ESP Structure Erection MT 355

Installation of support 0.0 5.0 5.0 0.0 11.0 11.0 0.0 16.0
2 bearing Erection MT 16

Installation of Stool 9 0.0 0.0 0.0 0.0 9 9.0 9.0


3 MT

Installation of Casing 0.0 0.0 18.0 18.0 18.0 54.0 19.0 19.0 18.0 56.0 10.0 18.0 18.0 18.0 18.0 18.0 100.0 210.0
210
structure
4 MT

Installation of Casing 0.0 0.0 12.0 13.0 13.0 38.0 13.0 13.0 12.0 38.0 6.0 13.0 13.0 12.0 13.0 13.0 70.0 146.0
wall
5 MT 146
Installtion of
Longitudinal hopper 5 0.0 0.0 0.0 0.0 5 5.0 5.0
6 ridge MT
Installtion of
Transverse hopper 0.0 0.0 0.0 2.0 2.0 2.0 6.0 2.0 2 2 6.0 12.0
7 ridge MT 12

Installation Of Hopper 0.0 0.0 0.0 0.0 0.0 0.0


8 MT

Total 753 4 21 24 27 76 8 23 24 22 25 22 25 149 9 30 31 31 25 22 24 172 7 23 25 11 34 34 32 166 16 31 33 32 33 45 190 753


Labour Day Sunday Sunday Sunday Sunday

Note: The above plan is subjected to the sequential materials availability