Professional Documents
Culture Documents
2022 - 12-12 - BellAdjo Center
2022 - 12-12 - BellAdjo Center
2022 - 12-12 - BellAdjo Center
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
NOT FOR
REGULATORY
APPROVAL,
PERMITTING, OR
CONSTRUCTION
ISSUED:
COVER PAGE
X01.1
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
PROGRAMME
CBCC Architects - Montee Anne-Rouge
Yaounde - CAMEROUN
BELLADJO
CENTER
SOUS-SOL ZONE DE RESTAURATION TOITURE TERRASSE ZONE DE DEGUSTATION M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
SOUS-SOL MAGASIN
The General Contractor is responsible for
confirming and correlating dimensions at
the job site. The Architect will not be
responsible for construction means,
methods, techniques, sequences, or
procedures, or for safety precautions and
programs in connection with the project.
ZONE DE JEUX
MAGASIN - LOCAL TECHNIQUE
ETAGE 1
TOILETTES
(CENTRE DE LOISIR)
COMPTOIR - VENTE DE TICKETS
06 STUDIOS MEUBLES
01 CHAMBRE MEUBLEE NOT FOR
ETAGE 2 REGULATORY
CONCIERGERIE ISSUED:
PROGRAMME
X01.2
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
CBCC Architects - Montee Anne-Rouge
Yaounde - CAMEROUN
+237 653 283 030
www.facebook.com/CBCCarchitects
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
NOT FOR
REGULATORY
APPROVAL,
PERMITTING, OR
CONSTRUCTION
ISSUED:
RENDU 3D
X01.3
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
CBCC Architects - Montee Anne-Rouge
Yaounde - CAMEROUN
+237 653 283 030
www.facebook.com/CBCCarchitects
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
NOT FOR
REGULATORY
APPROVAL,
PERMITTING, OR
CONSTRUCTION
ISSUED:
RENDU 3D
X01.4
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
CBCC Architects - Montee Anne-Rouge
Yaounde - CAMEROUN
+237 653 283 030
www.facebook.com/CBCCarchitects
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
NOT FOR
REGULATORY
APPROVAL,
PERMITTING, OR
CONSTRUCTION
ISSUED:
RENDU 3D
X01.5
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
1.61 1.61 1.61 1.61 1.87 1.87 1.87 1.62 1.52
1.73
7.05
3.20
TOILETTES
A: 22.56 m2
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
A: 11.47 m2
17.81
25.70
PISTES DE BOWLING
A: 281.22 m2
3.07
Circulation
2.80
NOT FOR
REGULATORY
ZONE DE DEGUSTATION ZONE DE DEGUSTATION APPROVAL,
A: 25.08 m2 A: 24.63 m2
PERMITTING, OR
CONSTRUCTION
ISSUED:
TOILETTES
7.08
A: 22.56 m2
ZONE DE TRANSITION
A: 18.66 m2
5.35
CBCC Architects - Montee Anne-Rouge
Yaounde - CAMEROUN
+237 653 283 030
www.facebook.com/CBCCarchitects
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
20
6.05 20 5.79 20 8.66 20 2.50 20 4.05 Project Number: Project Number
Drawings and Specifications as instruments
of service are and shall remain the property
of the Architect. They are not to be used on
extensions of the project, or other projects,
except by agreement in writing and
18.70
appropriate compensation to the Architect.
5.05
responsible for construction means,
methods, techniques, sequences, or
procedures, or for safety precautions and
programs in connection with the project.
ZONE DE JEUX
20
A: 572.78 m2
27.60
5.80
VENTE DE TICKETS
A: 21.06 m2
20
2.15
4.60
Circulation
2.65
NOT FOR
8.90
REGULATORY
APPROVAL,
20
PERMITTING, OR
3.35 2.55 CONSTRUCTION
2.10
ISSUED:
4.15
PLANS ETAGE 1 -
ESPACE DE JEUX
3.35 2.85 18.30
X01.7
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
28.70
BELLADJO
5.47
Chambre CENTER
A: 17.4 m2
7.41
Sejour + SAM M. MEK NGBWA Mathurin
A: 26.78 m2
Yaounde , CAMEROUN
2.98
methods, techniques, sequences, or
A: 6.08 m2 procedures, or for safety precautions and
18.70
programs in connection with the project.
1.12
Circulation
A: 5.86 m2
Cuisine
3.58
2.31
A: 7.92 m2
2.16
ToilettesWC Visiteur 2.04 99
A: 4.41 m2 A: 2.15 m2
2.00
27.60
Circulation
Toilettes
A: 3.92 m2
Magasin - Buanderie
Cuisine A: 14.99 m2
A: 8.28 m2
Circulation
A: 1.53 m2
8.90
A: 28.43 m2
NOT FOR
REGULATORY
APPROVAL,
PERMITTING, OR
Conciergerie CONSTRUCTION
A: 12.8 m2
ISSUED:
X01.8
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100
24.35
BELLADJO
CENTER
M. MEK NGBWA Mathurin
Yaounde , CAMEROUN
17.00
responsible for construction means,
methods, techniques, sequences, or
procedures, or for safety precautions and
CUISNE programs in connection with the project.
A: 31.34 m2 © 2023 CBCC Architects
Circulation
17.45
8.90
NOT FOR
REGULATORY
APPROVAL,
Bureau
A: 12.8 m2 PERMITTING, OR
CONSTRUCTION
ISSUED:
PLANS TOITURE
TERRASSE -
RESTAURANT
X01.9
Printed: 14/02/2023
GSPublisherVersion 0.99.100.100