Type of Work Permit General Work Excavation Work Height Work Hot Work
Month:May 2023
55 0 0 270
ork Permit
Month:
Disposal
nil
nil
nil
nil
nil
ROHAN BUILDERS (INDIA) PVT.LTD.
Project Name: Azim Premji University, Bhopal
Safety Observation Record Sheet.
Informed to concern MEP supervisor and advised the worker for use
FBH
Instructed to the all eng and supervisor don’t strt the work without
taken work permit.
Inform to the P&M team For providing Safety gurad after that its
installed.
Work stoped and inform to area owner to provied lifeline for slab
work after that height work training given to the all involved workers,
work started after lifeline fixing.
Work stoped and inform to area owner to provied lifeline for slab
work after that height work training given to the all involved workers,
work started after lifeline fixing.
I have to discussed with our site end and supervisor and suggest that
before encoring safety harness than work continue
Immediate work stop & strictly warn to use lifeline for anchring fbh
hook.
Immediate work stop & strictly warning given to the entire team to
use lifeline.
Immediate work stop & strictly instructed to the gang for using
lifeline.
Work stoped and instructed area owner to don’t allow work without
safety goggles.
Inform to concern person & stop the work immediately, after that tag
lineprovided.
Inform to Area team and shuttring team foreman to don’t leave the
bar without protection or use u bar
Inform to area sup to remove all the scaffolding & shuttering material
from access and stored separately.
work stopped and all the workers deployed for housekeeping, and
inform to the area owner to avoid improper material stacking in
future.
Inform to area owner to lay the cable at site in proper way after that
proper cable routin done. .
Inform to area owner to lay the cable at site in proper way after that
proper cable routin done. .
Inform to area owner & Electrical team to to lay the cable at site in
proper way.
Inform to concern person & stop the work immediatly provided tag
line rope for safe material sifting work.
work stoped and inform to site Eng and sacffolder Sup team to
without suporting or tie up don’t allow to work on scaffold after that
tie-up done.
instruction given to the all, avoid using cable without plug ad top.
All the debris needs to be removed from all floor and building
All the debris needs to be removed from all floor and building
Inform to the area sup. to deploy manpower for HK & debris removing
work.
Informed to area sup & electrician Safety training given worker about
cable management
amanraj Closed
tushar Closed
akash Closed
amanraj Closed
akash Closed
tushar Closed
tushar Closed
akash Closed
akash Closed
akash Closed
tushar Closed
vijay Closed
tushar Closed
vijay Closed
sanjay Closed
All Closed
vijay Closed
vijay Closed
tushar Closed
sazid Closed
akash Closed
akash Closed
anil yadav Closed
vijay Closed
akash Closed
nabi Closed
vijay Closed
tushar Closed
vijay Closed
vijay Closed
tushar Closed
vijay Closed
akash Closed
akash Closed
sanjay Closed
sanjay Closed
sanjay Closed
sanjay Closed
nabi Closed
anil yadav Closed
tushar Closed
dheeru Closed
sanjay Closed
tushar Closed
sazid Closed
akash Closed
sanjay Closed
sanjay Closed
dheeru Closed
narendra Closed
vijay Closed
vijay Closed
tushar Closed
nabi Closed
sanjay Closed
vijay Closed
vijay Closed
anil yadav Closed
sanjay Closed
sanjay Closed
sanjay Closed