Project: EMAAR DUBAI HILLS ESTATE - GOLFVILLE

Client: M/S EMAAR DEVELOPMENT


Consultant: M/S KHATIB & ALAMI
Main Contractor: M/S GINCO GENERAL CONTRACTING

Document Title: MSRA COLUMN AND WALL CONCRETE WORKS (CLIMBING FORM WORK)
Document Reference: B-035-GN-MS-GV-STR-012-Rev.00

COMMENTS RESOLUTION SHEET


S/N CONSULTANT COMMENTS CONTRACTOR RESPONSE REFERENCE
1 Method statement and risk assessment Engineer’s comments complied accordingly. Method Statement
should submit only for core wall and outer
facing climbing column platforms.
2 Corn required for the attachment of Engineers comments noted and complied Method Statement Section
climbing platform is not showed in the accordingly by specialist formwork supplier TRX 7: Instruction of Assembly
material sections. Formwork & Scaffolds. and Use.
3 Corn fixing requirements during the core Engineers comments noted and complied Method Statement Section
wall concreting stage is not mentioned. accordingly by specialist formwork supplier TRX 7: Instruction of Assembly
Formwork & Scaffolds. and Use.
4 Safe method of access to outer space Engineer’s comment noted and to be complied Method Statement Section
climbing platform while attaching and accordingly. In addition to the arrangement 7: Instruction of Assembly
detaching from the mounted corn is not specified for the use of climbing platforms, safe and Use.
mentioned. access ladders adequately secured shall be
provided for safe access/eggress.
5 Use of safety catch nets and falling Engineer’s comments complied accordingly and Risk Assessment
objects mitigation measures are not incorporated in the attached Risk Assessment.
mentioned anywhere.

6 The following activity must be included in Engineer’s comments complied accordingly and Risk Assessment
the risk assessment and provide the incorporated in the attached Risk Assessment.
safety control measures.
 Preassembly of the climbing platforms
at ground floor.
 Attaching the corn assembly during the
wall reinforcement stage.
 Lifting of preassembled climbing
platform.
 Positioning/locking the climbing
platform at job required location.
 Access to suspended climbing
platform.
 Congested work place between
climbing platform and wall
reinforcement.
 Working on climbing platform (loose
material and person fall risk).
 Scaffold erection on climbing platform.