Document Title: MSRA COLUMN AND WALL CONCRETE WORKS (CLIMBING FORM WORK)
Document Reference: B-035-GN-MS-GV-STR-012-Rev.00
6 The following activity must be included in Engineer’s comments complied accordingly and Risk Assessment
the risk assessment and provide the incorporated in the attached Risk Assessment.
safety control measures.
Preassembly of the climbing platforms
at ground floor.
Attaching the corn assembly during the
wall reinforcement stage.
Lifting of preassembled climbing
platform.
Positioning/locking the climbing
platform at job required location.
Access to suspended climbing
platform.
Congested work place between
climbing platform and wall
reinforcement.
Working on climbing platform (loose
material and person fall risk).
Scaffold erection on climbing platform.