Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

-: COMPARATIVE STATEMENT OF QUOTATION:-

Dept. Enquiry Ref. No. ______________________ dtd._________________________

Comparative statement prepared on basis of the rate as obtained from different firms related to the lighting works for Cremetorium of preparing of D.P.R. The rate as indicated
hereunder has been collected from the open market as the rates are not available in the P.W.D.SCHEDULE

Columns 4 to 6 to indicate the firms Name

Sl. Description Quantity NAME OF THE FIRMS Special reasons for


No. selecting materials
Unique Refractories & at a higher rate to
Jadob Electric Co. Ronsan
Engineering Industries be provided in this
column.
1 2 3 4 5 6 7
Probable items and Amount Amount Amount
approximate quantities for the Unique Refractories
work of " Supply ,delivery Including Rs. 89,85,568.00 Including Rs. 91,96,173.00 Including Rs. 94,25,574.00 & Engineering
,installation, testing and 1 G.S.T & G.S.T & G.S.T & Industries stood
commissioning of Electric all Taxes all Taxes all Taxes lowest
Cremation Furnace including
Pollution Control Unit

As per the comparative statement it is seen that Unique Refractories & Engineering Industries has been offered the lowest unit rate for the aforesaid item and
thereafter the lowest rate as offered by this Firm has been accepted.

Chairman
Konnagar Municipality

1
2

You might also like