Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

BP West Nile Delta

Gas Development Project

Security Classification:

WND Project Internal

Supplier Name S&TC Purchase Order No. 26009-GRO-POA-MEA0-M0001

Purchase Order Title G-F Air Coolers Bundles

Supplier (Internal) Doc Ref. VP-G-017-1

Project Document Number EG001-11RV1AMEA0-F99-0012 Revision No. 01

Tube Buckling Analysis For Flash Gas Compressor After cooler


Project Document Title
Item No. Gas Compressor After Cooler A-2721 A/B

BP West Nile Delta


Gas Development Project

EG001-11RV1AMEA0-F99-0012 Submittal: 01

Document Status: 5
Signed By: Holt_Barry

Date Signed: 28/09/2018


11RV1AMEA0 - EG001-ME-REQ-11R-0015
Purchase Order / Sub Cont No.: [MEA0-M0001]

Permission to proceed does not constitute acceptance or approval of design details, calculations,
analysis, test methods, or materials developed or selected by the Third Party and does not relieve the
Third Party from full compliance with contractual obligations.

1 - Work may Proceed


1M - Work may Proceed with Comments

2CR - Revise and resubmit. Work may proceed - Priority Return

2EX - Revise and resubmit. Work may proceed - Expedite Return

2NC - Revise and resubmit. Work may proceed

3 - Revise and Resubmit. Work may not proceed

4 - Review not required. Work may proceed

5 - For Information Only

01 27-Sep-2018 Issued For Information S.W.YEO Y.S.CHOI D.J.JEONG


Rev Date Reason for Issue Author Checker Approver
WND Project Internal (Bechtel Confidential).
© 2014/15/16 BP EXPLORATION (DELTA) LTD (“BP”). THIS DOCUMENT , PREPARED UNDER CONTRACT GPO-WND-EPCC-15-012 (THE “CONTRACT”) BETWEEN BECHTEL INTERNATIONAL INC. (“BECHTEL”) AND BP, CONTAINS
INFORMATION CONFIDENTIAL AND/OR PROPRIETARY TO BP THAT IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN ANY FORM BY ANY PERSON OR ENTITY OTHER THAN BP WITHOUT BP’S PRIOR WRITTEN PERMISSION.
ALL RIGHTS RESERVED. NOTICE: THESE MATERIALS ARE THE WORK PRODUCT OF BECHTEL. BECHTEL ACCEPTS NO LIABILITY FOR ANY RELIANCE BY ANY PERSON OTHER THAN ITS CLIENT, BP, ON THE CONTENT OF THIS
WORK PRODUCT. BP HAS EXPRESSLY AUTHORIZED BECHTEL TO ISSUE THIS DISCLAIMER.

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
BP West Nile Delta
Gas Development Project

Security Classification:

WND Project Internal

Supplier Name S&TC Purchase Order No. 26009-GRO-POA-MEA0-M0001

Purchase Order Title G-F Air Coolers Bundles

Supplier (Internal) Doc Ref. VP-G-017-1

Project Document Number EG001-11RV1AMEA0-F99-0012 Revision No. 01

Tube Buckling Analysis For Flash Gas Compressor After cooler


Project Document Title
Item No. Gas Compressor After Cooler A-2721 A/B

01 27-Sep-2018 Issued For Information S.W.YEO Y.S.CHOI D.J.JEONG


Rev Date Reason for Issue Author Checker Approver
WND Project Internal (Bechtel Confidential).
© 2014/15/16 BP EXPLORATION (DELTA) LTD (“BP”). THIS DOCUMENT, PREPARED UNDER CONTRACT GPO-WND-EPCC-15-012 (THE “CONTRACT”) BETWEEN BECHTEL INTE RNATIONAL INC. (“BECHTEL”) AND BP, CONTAINS
INFORMATION CONFIDENTIAL AND/OR PROPRIETARY TO BP THAT IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN ANY FORM BY ANY PERSON OR ENTITY OTHER THAN BP WITHOUT BP’S PRIOR WRITTEN PERMISSION.
ALL RIGHTS RESERVED. NOTICE: THESE MATERIALS ARE THE WORK PRODUCT OF BECHTEL. BECHTEL ACCEPTS NO LIABILITY FOR ANY RELIANCE BY ANY PERSON OTHER THAN ITS CLIENT, BP, ON THE CONTENT OF THIS
WORK PRODUCT. BP HAS EXPRESSLY AUTHORIZED BECHTEL TO ISSUE THIS DISCLAIMER.

ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

TUBE BUCKLING CHECK

Document Number: EG001-11RV1AMEA0-F99-0012 Page 2 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

TABLE OF CONTENT

1.0. Introduction

2.0. Design Criteria

2.1 Operating Condition

3.0. FEA Analysis

3.1 Element Type

3.2 Boundary Conditions

3.3 Loading Condition

3.4 Analysis Result

Document Number: EG001-11RV1AMEA0-F99-0012 Page 3 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

1. Introduction

This report summarizes the Tube buckling check under operating condition.

The dimensional general information for A-2721 specified to this analysis are

shown in Figure attached.

Typically the stress analysis is determined using an equivalent static analysis procedure.

This analysis is accomplished using the ANSYS program that is based on the

Finite Element Method (FEM) and recognized internationally for following proposes;

. Linear/Nonlinear Static Analysis

. Heat Transfer Analysis

. Dynamic Analysis

. Fatigue & Crack / Fracture Mechanics Analysis

. Optimization Analysis

. Eigenvalue Buckling Analysis

2. Design Criteria

2.1 Operating Condition


The operating conditions for the A-2721 are as follows

[Table 1]

DESIGN DATA

Operating Pressure : 79.100 (bar g)

Mean Tube metal Temperature : 44.2~78.7 (℃ )

Corrosion Allowance : 0.00 (mm)

Case3A

Document Number: EG001-11RV1AMEA0-F99-0012 Page 4 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

3. FEA Analysis

3.1 Element Type

For the finite element model of Plates and Tube, 3D Solid 185 elements is modeled

Total number of nodes and elements are tabulated in Table 4.

[Table 2] Total Number of Nodes and Elements

Element Type Nodes Elements

3D Solid Brick Element 13,785 4,794

3.2 Boundary Conditions

The boundary condition in this model is shown in pictures attached.

3.3 Loading Condition

The Load condition in this model is shown in pictures attached.

3.4 Analysis Result


[Table 3]
Calculated
Location Buckling Load Factor Result ( >1)
Buckling Load Factor

Tube 1 5.3918 OK

* Buckling Load = Buckling Load Factor * Actual Load

Document Number: EG001-11RV1AMEA0-F99-0012 Page 5 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

Dx = Fixed ,Dy=Free, Dz=Fixed

Dx = Free ,Dy=Free, Dz=Fixed

Dx = Free ,Dy=Free, Dz=Fixed

Fig.A Model & Boundary Condition

Document Number: EG001-11RV1AMEA0-F99-0012 Page 6 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

Dx = Free ,Dy=Fixed , Dz=Fixed

Fig.B Boundary Condition & Loading Conditions

Document Number: EG001-11RV1AMEA0-F99-0012 Page 7 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)
Tube Buckling Analysis For Flash Gas Compressor After cooler Item No. Gas Compressor After Cooler A-2721 A/B

TUBE BUCKLING ANALYSIS

Fig.C Temperature & Deformation

Document Number: EG001-11RV1AMEA0-F99-0012 Page 8 of 8 Rev: 01


@ BP Exploration (Delta) Ltd. WND Project Internal (Bechtel Confidential)

You might also like