Extra Centering Work: Beam Work Sit Out Beam Work

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Extra Centering Work

Beam Work
Sit out Beam work
9.9 - 7 Nos  68.25 x 135  9,213.75
21.9 - 3Nos  65.7×135  8,869.5
Slab Floor Beam
22 x 135  2,970
9 x135 1,215
Roof Slab Concrete
20 x 6.5 120 × 35 4,450
10.2 x 4.9  49.98x35 1749 . 3
20 Ft Concreting Beam joint
1800
Pillar set & Footing
140 × 13 18,20 +2500 deep footing
4550
First floor starting Maintenance work
132.7x135 17,914.5
Sitout Floor Slab Concrete
22 x 2.5 55x40 2200
First floor maintenance work Slab filling Concrete
64 x 40 2,560
Total  57,492.05
Extra paraphet work
2000
Third floor Design Slab Concrete
20x5  3500
20x7  4900
8400
Third floor concrete work 30% adding
2600
Total 11,000
கன்னி Room & Paraphet extra line work & plastering work

10000