PROJECT INFORMATION
Client Name:
Project Name:
Project Number:
OWG.Footing Page 1 of 95
RESULTS SUMMARY
OWG.Footing Page 2 of 95
Uplift Safety Factor PASS 3.412 1.5 10 - 10 ALLOWABLE
OWG.Footing Page 3 of 95
Bearing Pressure PASS 1.0204 3.3 ksf 5 - 5 ALLOWABLE
Note: A value of 99999 in the Min/Max Value column against Stability, Sliding and Upli parameter rows
indicates that these parameters do not govern the foo ng design.
For eg - A value of 99999 against Stability row indicates that there is no overturning moment and therefore
the footing is safe in overturning with a very high stability ratio or the stability ratio is greater than 99999.
OWG.Footing Page 4 of 95
MATERIAL QUANTITIES
OWG.Footing Page 5 of 95
DESIGN CODE ACI_318_2019 INPUT UNITS English OUTPUT UNITS English
BUOYANCY CRITERIA:
Consider Buoyancy: No
Water Table Below Grade 10 ft
DEFAULT PARAMETERS:
Consider Biaxial Bending Pressure for Concrete Design: Yes
Limit Footing To Soil Non-Contact Area Yes
Max Non-Contact Area (%) 40
OWG.Footing Page 6 of 95
FOOTING GEOMETRY
Footing Description - - F-1
OWG.Footing Page 7 of 95
LOAD ELEMENT GEOMETRY AND APPLIED LOADS
OWG.Footing Page 8 of 95
44 - 44 ULTIMATE 21.24 0 0 -7.3 0
45 - 45 ULTIMATE 29.14 0 0 19.4 0
46 - 46 ULTIMATE 18.54 0 0 12.6 0
47 - 47 ULTIMATE 20.34 0 0 10 0
48 - 48 ULTIMATE 32.76 0 0 10.14 0
49 - 49 ULTIMATE 34.36 0 0 12.54 0
50 - 50 ULTIMATE 36.74 0 0 12 0
51 - 51 ULTIMATE 36.74 0 0 12 0
52 - 52 ULTIMATE 36.74 0 0 12 0
53 - 53 ULTIMATE 36.74 0 0 12 0
54 - 54 ULTIMATE 43.34 0 0 14.4 0
55 - 55 ULTIMATE 40.84 0 0 14.4 0
56 - 56 ULTIMATE 36.74 0 0 12 0
57 - 57 ULTIMATE 36.74 0 0 12 0
58 - 58 ULTIMATE -19.17 0 0 -17.77 0
59 - 59 ULTIMATE -11.27 0 0 8.93 0
60 - 60 ULTIMATE -10.37 0 0 -17.77 0
61 - 61 ULTIMATE -2.47 0 0 8.93 0
62 - 62 ULTIMATE -13.07 0 0 2.13 0
63 - 63 ULTIMATE -11.27 0 0 -0.47 0
64 - 64 ULTIMATE 4.33 0 0 0.33 0
65 - 65 ULTIMATE 5.93 0 0 2.73 0
66 - 66 ULTIMATE 5.13 0 0 1.53 0
67 - 67 ULTIMATE 5.13 0 0 1.53 0
68 - 68 ULTIMATE 5.13 0 0 1.53 0
69 - 69 ULTIMATE 5.13 0 0 1.53 0
70 - 70 ULTIMATE 11.73 0 0 3.93 0
71 - 71 ULTIMATE 9.23 0 0 3.93 0
72 - 72 ULTIMATE 5.13 0 0 1.53 0
73 - 73 ULTIMATE 5.13 0 0 1.53 0
OWG.Footing Page 9 of 95
17 - 17 ALLOWABLE 18.15 0 0 -5.15 0
18 - 18 ALLOWABLE 18.15 0 0 -5.15 0
19 - 19 ALLOWABLE 18.15 0 0 -5.15 0
20 - 20 ALLOWABLE 18.15 0 0 -5.15 0
21 - 21 ALLOWABLE 21.225 0 0 -6.95 0
22 - 22 ALLOWABLE 23.1 0 0 -6.95 0
23 - 23 ALLOWABLE 18.15 0 0 -5.15 0
24 - 24 ALLOWABLE 18.15 0 0 -5.15 0
25 - 25 ULTIMATE 14.28 0 0 -4.9 0
26 - 26 ULTIMATE 48.26 0 0 -16.02 0
27 - 27 ULTIMATE 48.4 0 0 -14.42 0
28 - 28 ULTIMATE 21 0 0 -11.42 0
29 - 29 ULTIMATE 17.05 0 0 1.93 0
30 - 30 ULTIMATE 25.4 0 0 -11.42 0
31 - 31 ULTIMATE 21.45 0 0 1.93 0
32 - 32 ULTIMATE 21 0 0 -6.72 0
33 - 33 ULTIMATE 20.1 0 0 -8.02 0
34 - 34 ULTIMATE 29.2 0 0 -7.72 0
35 - 35 ULTIMATE 29.2 0 0 -7.72 0
36 - 36 ULTIMATE 29.2 0 0 -7.72 0
37 - 37 ULTIMATE 29.2 0 0 -7.72 0
38 - 38 ULTIMATE 31.25 0 0 -8.92 0
39 - 39 ULTIMATE 32.5 0 0 -8.92 0
40 - 40 ULTIMATE 29.2 0 0 -7.72 0
41 - 41 ULTIMATE 29.2 0 0 -7.72 0
42 - 42 ULTIMATE 20.34 0 0 -19.4 0
43 - 43 ULTIMATE 12.44 0 0 7.3 0
44 - 44 ULTIMATE 29.14 0 0 -19.4 0
45 - 45 ULTIMATE 21.24 0 0 7.3 0
46 - 46 ULTIMATE 20.34 0 0 -10 0
47 - 47 ULTIMATE 18.54 0 0 -12.6 0
48 - 48 ULTIMATE 34.36 0 0 -12.54 0
49 - 49 ULTIMATE 32.76 0 0 -10.14 0
50 - 50 ULTIMATE 36.74 0 0 -12 0
51 - 51 ULTIMATE 36.74 0 0 -12 0
52 - 52 ULTIMATE 36.74 0 0 -12 0
53 - 53 ULTIMATE 36.74 0 0 -12 0
54 - 54 ULTIMATE 40.84 0 0 -14.4 0
55 - 55 ULTIMATE 43.34 0 0 -14.4 0
56 - 56 ULTIMATE 36.74 0 0 -12 0
57 - 57 ULTIMATE 36.74 0 0 -12 0
58 - 58 ULTIMATE -11.27 0 0 -8.93 0
59 - 59 ULTIMATE -19.17 0 0 17.77 0
60 - 60 ULTIMATE -2.47 0 0 -8.93 0
61 - 61 ULTIMATE -10.37 0 0 17.77 0
62 - 62 ULTIMATE -11.27 0 0 0.47 0
63 - 63 ULTIMATE -13.07 0 0 -2.13 0
64 - 64 ULTIMATE 5.93 0 0 -2.73 0
65 - 65 ULTIMATE 4.33 0 0 -0.33 0
66 - 66 ULTIMATE 5.13 0 0 -1.53 0
67 - 67 ULTIMATE 5.13 0 0 -1.53 0
68 - 68 ULTIMATE 5.13 0 0 -1.53 0
69 - 69 ULTIMATE 5.13 0 0 -1.53 0
70 - 70 ULTIMATE 9.23 0 0 -3.93 0
71 - 71 ULTIMATE 11.73 0 0 -3.93 0
72 - 72 ULTIMATE 5.13 0 0 -1.53 0
73 - 73 ULTIMATE 5.13 0 0 -1.53 0
OWG.Footing Page 10 of 95
Footing Description - - F-3 - Load Element - - P-3
OWG.Footing Page 11 of 95
48 - 48 ULTIMATE 30.18 1.9 0 9.54 0
49 - 49 ULTIMATE 36.98 1.9 0 13.14 0
50 - 50 ULTIMATE 52.09 0 0 12.3 0
51 - 51 ULTIMATE 53.09 0 0 14.2 0
52 - 52 ULTIMATE 42.39 0 0 12.3 0
53 - 53 ULTIMATE 43.29 0 0 14.2 0
54 - 54 ULTIMATE 36.79 0 0 12 0
55 - 55 ULTIMATE 36.79 0 0 12 0
56 - 56 ULTIMATE 43.39 0 0 14.4 0
57 - 57 ULTIMATE 40.89 0 0 14.4 0
58 - 58 ULTIMATE -24.27 0 0 -17.97 0
59 - 59 ULTIMATE -16.27 0 0 9.03 0
60 - 60 ULTIMATE -15.47 0 0 -17.97 0
61 - 61 ULTIMATE -7.47 0 0 9.03 0
62 - 62 ULTIMATE -18.07 4.2 0 2.13 0
63 - 63 ULTIMATE -16.27 4.2 0 -0.47 0
64 - 64 ULTIMATE 1.73 1.9 0 -0.27 0
65 - 65 ULTIMATE 8.53 1.9 0 3.33 0
66 - 66 ULTIMATE 20.43 0 0 1.83 0
67 - 67 ULTIMATE 21.43 0 0 3.73 0
68 - 68 ULTIMATE 10.73 0 0 1.83 0
69 - 69 ULTIMATE 11.63 0 0 3.73 0
70 - 70 ULTIMATE 5.13 0 0 1.53 0
71 - 71 ULTIMATE 5.13 0 0 1.53 0
72 - 72 ULTIMATE 11.73 0 0 3.93 0
73 - 73 ULTIMATE 9.23 0 0 3.93 0
1 - 1 ALLOWABLE 0.4 0 0 0 0
2 - 2 ALLOWABLE 0.4 -2.295 0 0 0
3 - 3 ALLOWABLE 0.4 2.565 0 0 0
4 - 4 ALLOWABLE 0.24 -3.06 0 0 0
5 - 5 ALLOWABLE 0.24 3.42 0 0 0
6 - 6 ALLOWABLE 0.412 0 0 0 0
7 - 7 ULTIMATE 0.56 0 0 0 0
8 - 8 ULTIMATE 0.48 -2.55 0 0 0
9 - 9 ULTIMATE 0.48 2.85 0 0 0
10 - 10 ULTIMATE 0.48 -5.1 0 0 0
11 - 11 ULTIMATE 0.48 5.7 0 0 0
12 - 12 ULTIMATE 0.48 0 0 0 0
13 - 13 ULTIMATE 0.36 -5.1 0 0 0
14 - 14 ULTIMATE 0.36 5.7 0 0 0
15 - 15 ULTIMATE 0.36 0 0 0 0
OWG.Footing Page 12 of 95
Load Combination Axial Load Shear-X Mom-Z Shear-Z Mom-X
kips kips kip-ft kips kip-ft
OWG.Footing Page 13 of 95
24 - 48 ULTIMATE 32.76 0 0 10.14 0
25 - 49 ULTIMATE 34.36 0 0 12.54 0
26 - 50 ULTIMATE 36.74 0 0 12 0
27 - 51 ULTIMATE 36.74 0 0 12 0
28 - 52 ULTIMATE 36.74 0 0 12 0
29 - 53 ULTIMATE 36.74 0 0 12 0
30 - 54 ULTIMATE 43.34 0 0 14.4 0
31 - 55 ULTIMATE 40.84 0 0 14.4 0
32 - 56 ULTIMATE 36.74 0 0 12 0
33 - 57 ULTIMATE 36.74 0 0 12 0
34 - 58 ULTIMATE -19.17 0 0 -17.77 0
35 - 59 ULTIMATE -11.27 0 0 8.93 0
36 - 60 ULTIMATE -10.37 0 0 -17.77 0
37 - 61 ULTIMATE -2.47 0 0 8.93 0
38 - 62 ULTIMATE -13.07 0 0 2.13 0
39 - 63 ULTIMATE -11.27 0 0 -0.47 0
40 - 64 ULTIMATE 4.33 0 0 0.33 0
41 - 65 ULTIMATE 5.93 0 0 2.73 0
42 - 66 ULTIMATE 5.13 0 0 1.53 0
43 - 67 ULTIMATE 5.13 0 0 1.53 0
44 - 68 ULTIMATE 5.13 0 0 1.53 0
45 - 69 ULTIMATE 5.13 0 0 1.53 0
46 - 70 ULTIMATE 11.73 0 0 3.93 0
47 - 71 ULTIMATE 9.23 0 0 3.93 0
48 - 72 ULTIMATE 5.13 0 0 1.53 0
49 - 73 ULTIMATE 5.13 0 0 1.53 0
OWG.Footing Page 14 of 95
ULTIMATE LOAD COMBINATIONS
OWG.Footing Page 15 of 95
ALLOWABLE LOAD COMBINATIONS
OWG.Footing Page 16 of 95
20 - 44 ULTIMATE 16.19 0 0 -7.5 0
21 - 45 ULTIMATE 24.19 0 0 19.5 0
22 - 46 ULTIMATE 13.59 4.2 0 12.6 0
23 - 47 ULTIMATE 15.39 4.2 0 10 0
24 - 48 ULTIMATE 30.18 1.9 0 9.54 0
25 - 49 ULTIMATE 36.98 1.9 0 13.14 0
26 - 50 ULTIMATE 52.09 0 0 12.3 0
27 - 51 ULTIMATE 53.09 0 0 14.2 0
28 - 52 ULTIMATE 42.39 0 0 12.3 0
29 - 53 ULTIMATE 43.29 0 0 14.2 0
30 - 54 ULTIMATE 36.79 0 0 12 0
31 - 55 ULTIMATE 36.79 0 0 12 0
32 - 56 ULTIMATE 43.39 0 0 14.4 0
33 - 57 ULTIMATE 40.89 0 0 14.4 0
34 - 58 ULTIMATE -24.27 0 0 -17.97 0
35 - 59 ULTIMATE -16.27 0 0 9.03 0
36 - 60 ULTIMATE -15.47 0 0 -17.97 0
37 - 61 ULTIMATE -7.47 0 0 9.03 0
38 - 62 ULTIMATE -18.07 4.2 0 2.13 0
39 - 63 ULTIMATE -16.27 4.2 0 -0.47 0
40 - 64 ULTIMATE 1.73 1.9 0 -0.27 0
41 - 65 ULTIMATE 8.53 1.9 0 3.33 0
42 - 66 ULTIMATE 20.43 0 0 1.83 0
43 - 67 ULTIMATE 21.43 0 0 3.73 0
44 - 68 ULTIMATE 10.73 0 0 1.83 0
45 - 69 ULTIMATE 11.63 0 0 3.73 0
46 - 70 ULTIMATE 5.13 0 0 1.53 0
47 - 71 ULTIMATE 5.13 0 0 1.53 0
48 - 72 ULTIMATE 11.73 0 0 3.93 0
49 - 73 ULTIMATE 9.23 0 0 3.93 0
1 - 1 ALLOWABLE 0.4 0 0 0 0
2 - 2 ALLOWABLE 0.4 -2.295 0 0 0
3 - 3 ALLOWABLE 0.4 2.565 0 0 0
4 - 4 ALLOWABLE 0.24 -3.06 0 0 0
5 - 5 ALLOWABLE 0.24 3.42 0 0 0
6 - 6 ALLOWABLE 0.412 0 0 0 0
1 - 7 ULTIMATE 0.56 0 0 0 0
2 - 8 ULTIMATE 0.48 -2.55 0 0 0
3 - 9 ULTIMATE 0.48 2.85 0 0 0
4 - 10 ULTIMATE 0.48 -5.1 0 0 0
5 - 11 ULTIMATE 0.48 5.7 0 0 0
6 - 12 ULTIMATE 0.48 0 0 0 0
OWG.Footing Page 17 of 95
7 - 13 ULTIMATE 0.36 -5.1 0 0 0
8 - 14 ULTIMATE 0.36 5.7 0 0 0
9 - 15 ULTIMATE 0.36 0 0 0 0
OWG.Footing Page 18 of 95
Footing Description - - F-1
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
OWG.Footing Page 19 of 95
21 - 21 ALLOWABLE 0 0 6.95 41.7
22 - 22 ALLOWABLE 0 0 6.95 41.7
23 - 23 ALLOWABLE 0 0 5.15 30.9
24 - 24 ALLOWABLE 0 0 5.15 30.9
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
OWG.Footing Page 20 of 95
48 - 72 ULTIMATE 3.4172 10.0781 16.2562 5.13 34.8816
49 - 73 ULTIMATE 3.4172 10.0781 16.2562 5.13 34.8816
OWG.Footing Page 21 of 95
Footing Description - - F-2
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
OWG.Footing Page 22 of 95
21 - 21 ALLOWABLE 0 0 -6.95 -41.7
22 - 22 ALLOWABLE 0 0 -6.95 -41.7
23 - 23 ALLOWABLE 0 0 -5.15 -30.9
24 - 24 ALLOWABLE 0 0 -5.15 -30.9
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
OWG.Footing Page 23 of 95
48 - 72 ULTIMATE 2.2781 10.3312 16.2562 5.13 33.9956
49 - 73 ULTIMATE 2.2781 10.3312 16.2562 5.13 33.9956
OWG.Footing Page 24 of 95
Footing Description - - F-3
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
OWG.Footing Page 25 of 95
21 - 21 ALLOWABLE 0 0 5.15 30.9
22 - 22 ALLOWABLE 0 0 5.15 30.9
23 - 23 ALLOWABLE 0 0 6.95 41.7
24 - 24 ALLOWABLE 0 0 6.95 41.7
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
OWG.Footing Page 26 of 95
48 - 72 ULTIMATE 4.5562 13.1 16.2562 11.73 45.6425
49 - 73 ULTIMATE 4.5562 13.1 16.2562 9.23 43.1425
OWG.Footing Page 27 of 95
Footing Description - - F-4
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
1 - 1 ALLOWABLE 0 0 0 0
2 - 2 ALLOWABLE -2.295 -13.77 0 0
3 - 3 ALLOWABLE 2.565 15.39 0 0
4 - 4 ALLOWABLE -3.06 -18.36 0 0
5 - 5 ALLOWABLE 3.42 20.52 0 0
6 - 6 ALLOWABLE 0 0 0 0
Load Combination Load Element Soil Footing App Axial Total Axial Buoyant
Weight Weight Weight Load Load Load
kips kips kips kips kips kips
1 - 7 ULTIMATE 0 0 0 0
2 - 8 ULTIMATE -2.55 -15.3 0 0
3 - 9 ULTIMATE 2.85 17.1 0 0
4 - 10 ULTIMATE -5.1 -30.6 0 0
5 - 11 ULTIMATE 5.7 34.2 0 0
6 - 12 ULTIMATE 0 0 0 0
7 - 13 ULTIMATE -5.1 -30.6 0 0
8 - 14 ULTIMATE 5.7 34.2 0 0
9 - 15 ULTIMATE 0 0 0 0
OWG.Footing Page 28 of 95
OWG.Footing Page 29 of 95
SOIL BEARING PRESSURE RESULTS - Allowable Load Combinations - Without Buoyancy
OWG.Footing Page 30 of 95
5 - 5 ALLOWABLE 1.5944 0.011 1.5944 0.011 3.3 72.25 100
6 - 6 ALLOWABLE 0.8408 0.6662 0.8408 0.6662 3.3 72.25 100
7 - 7 ALLOWABLE 1.2916 0.2042 1.2916 0.2042 3.3 72.25 100
8 - 8 ALLOWABLE 1.349 0.1244 1.349 0.1244 3.3 72.25 100
9 - 9 ALLOWABLE 0.6309 0 0.6309 0 3.3 71.1571 98.4873
10 - 10 ALLOWABLE 1.0943 0 1.0943 0 3.3 37.2946 51.6188
11 - 11 ALLOWABLE 0.8045 0.0377 0.8045 0.0377 3.3 72.25 100
12 - 12 ALLOWABLE 0.9897 0 0.9897 0 3.3 51.9061 71.8423
13 - 13 ALLOWABLE 0.4008 0.2953 0.4008 0.2953 3.3 72.25 100
14 - 14 ALLOWABLE 0.4773 0.1889 0.4773 0.1889 3.3 72.25 100
15 - 15 ALLOWABLE 0.799 0.3025 0.799 0.3025 3.3 72.25 100
16 - 16 ALLOWABLE 0.7135 0.3647 0.7135 0.3647 3.3 72.25 100
17 - 17 ALLOWABLE 0.9526 0.3488 0.9526 0.3488 3.3 72.25 100
18 - 18 ALLOWABLE 0.9526 0.3488 0.9526 0.3488 3.3 72.25 100
19 - 19 ALLOWABLE 0.9526 0.3488 0.9526 0.3488 3.3 72.25 100
20 - 20 ALLOWABLE 0.9526 0.3488 0.9526 0.3488 3.3 72.25 100
21 - 21 ALLOWABLE 1.1007 0.2859 1.1007 0.2859 3.3 72.25 100
22 - 22 ALLOWABLE 1.1267 0.3118 1.1267 0.3118 3.3 72.25 100
23 - 23 ALLOWABLE 0.9526 0.3488 0.9526 0.3488 3.3 72.25 100
24 - 24 ALLOWABLE 0.9526 0.3488 0.9526 0.3488 3.3 72.25 100
OWG.Footing Page 31 of 95
Load Combination Max Min Vertex 1 Vertex 2 All Contact Percent
Pressure Pressure Pressure Pressure Pressure Area Contact
ksf ksf ksf ksf ksf sq ft
OWG.Footing Page 32 of 95
STABILITY RATIO - Allowable Load Combinations - Without Buoyancy
OWG.Footing Page 33 of 95
18 - 18 ALLOWABLE 0 199.8164 99999 30.9 199.8164 6.4666 1.1
19 - 19 ALLOWABLE 0 199.8164 99999 30.9 199.8164 6.4666 1.1
20 - 20 ALLOWABLE 0 199.8164 99999 30.9 199.8164 6.4666 1.1
21 - 21 ALLOWABLE 0 212.8852 99999 41.7 212.8852 5.1052 1.1
22 - 22 ALLOWABLE 0 220.8539 99999 41.7 220.8539 5.2963 1.1
23 - 23 ALLOWABLE 0 199.8164 99999 30.9 199.8164 6.4666 1.1
24 - 24 ALLOWABLE 0 199.8164 99999 30.9 199.8164 6.4666 1.1
Note: A value of 99999 indicates that there is no overturning moment and therefore the foo ng is safe
in overturning with a very high stability ratio or the stability ratio is greater than 99999.
OWG.Footing Page 34 of 95
OWG.Footing Page 35 of 95
SLIDING SAFETY FACTOR - Allowable Load Combinations - Without Buoyancy
OWG.Footing Page 36 of 95
Effective Footing Length Z Dir - Lz = 8.5 ft
Effective Footing Width X Dir - Lx = 8.5 ft
Footing Thickness Considered = h = 1.5 ft
Soil Cover - h1 = 1.5 ft
Soil Unit Weight - Y = 100 pcf
Passive Pressure At Footing Top - p1 = Yh1 = 0.15 ksf
Passive Pressure At Footing Base - p2 = Y(h + h1) = 0.3 ksf
Passive Resistance - R1 = 0.5*Lx*h*(p1+p2) = 2.8688 kips
Cohesion - c = 1 ksf
Adhesion - B = 0.75 ksf
Cohesive Resistance - R2 = 2*c*Lx*h = 25.5 kips
Adhesive Resistance - R3 = B*Lx*Lz = 54.1875 kips
Passive Resistance - R4 = R1 * Ppc = 2.8688 kips
Applied Axial Load = Aal = 54.9216 kips
Soil Weight = Sw = 10.0781 kips
Friction Resistance - R5 = (Aal - Nsc * Sw) * Scf = 21.9686 kips
Total Lateral Resistance - R = R1+R2+R3+R4+R5 = 104.5249 kips
Total Applied Lateral Load - S = 13.505 kips
Sliding Factor Of Safety - FS,slid = R/S = 7.7397
OWG.Footing Page 37 of 95
Load Combination Lateral Lateral Sliding Lateral Lateral Sliding All
Load Resist F.S. - X Dir Load Resist F.S. - Z Dir Sliding
kips kips kips kips
Note: A value of 99999 indicates that there is no applied lateral force and therefore the foo ng is safe
in sliding with a very high sliding safety factor or the sliding safety factor is greater than 99999.
OWG.Footing Page 38 of 95
UPLIFT SAFETY FACTOR - Allowable Load Combinations - Without Buoyancy
Load Combination Load Element Soil Footing App Axial Buoyant Safety Allowable/Required
Weight Weight Weight Load Load Factor Factor
kips kips kips kips kips kips
Load Combination Load Element Soil Footing App Axial Buoyant Safety Allowable/Required
Weight Weight Weight Load Load Factor Factor
kips kips kips kips kips kips
OWG.Footing Page 39 of 95
18 - 18 ALLOWABLE 2.2781 10.3312 16.2562 18.15 0 99999 1.5
19 - 19 ALLOWABLE 2.2781 10.3312 16.2562 18.15 0 99999 1.5
20 - 20 ALLOWABLE 2.2781 10.3312 16.2562 18.15 0 99999 1.5
21 - 21 ALLOWABLE 2.2781 10.3312 16.2562 21.225 0 99999 1.5
22 - 22 ALLOWABLE 2.2781 10.3312 16.2562 23.1 0 99999 1.5
23 - 23 ALLOWABLE 2.2781 10.3312 16.2562 18.15 0 99999 1.5
24 - 24 ALLOWABLE 2.2781 10.3312 16.2562 18.15 0 99999 1.5
Load Combination Load Element Soil Footing App Axial Buoyant Safety Allowable/Required
Weight Weight Weight Load Load Factor Factor
kips kips kips kips kips kips
Load Combination Load Element Soil Footing App Axial Buoyant Safety Allowable/Required
Weight Weight Weight Load Load Factor Factor
kips kips kips kips kips kips
OWG.Footing Page 40 of 95
Load Element Weight - Esf = 3.4172 kips
Soil Weight - Ssw = 10.0781 kips
Footing Weight - Fsw = 16.2562 kips
App Axial Weight - Tal = -11.16 kips
Buoyant Weight - Bl = 0 kips
Total Self Weight - Tsw = Esf + Ssw + Fsw - Bl = 29.7516 kips
Uplift Safety Factor - Usf = (Tsw / abs(Tal)) if Tal < 0 = 2.6659
Allowed Safety Factor - Asf = 1.5
Note: A value of 99999 indicates that there is no net upli force and therefore the foo ng is safe
in uplift with a very high uplift safety factor or the uplift safety factor is greater than 99999.
OWG.Footing Page 41 of 95
FACTORED SOIL BEARING PRESSURE RESULTS - Ultimate Load Combinations
OWG.Footing Page 42 of 95
FACTORED SOIL BEARING PRESSURE RESULTS - Ultimate Load Combinations
OWG.Footing Page 43 of 95
FACTORED SOIL BEARING PRESSURE RESULTS - Ultimate Load Combinations
OWG.Footing Page 44 of 95
FACTORED SOIL BEARING PRESSURE RESULTS - Ultimate Load Combinations
OWG.Footing Page 45 of 95
BEAM SHEAR STRESS - X DIRECTION - Ultimate Load Combinations - Without Buoyancy
OWG.Footing Page 46 of 95
49 - 73 ULTIMATE 6.5833 3.3885 2.2715 100.6231
OWG.Footing Page 47 of 95
47 - 71 ULTIMATE 6.2083 8.2642 5.54 100.6231
48 - 72 ULTIMATE 6.2083 3.7443 2.51 100.6231
49 - 73 ULTIMATE 6.2083 3.7443 2.51 100.6231
OWG.Footing Page 48 of 95
45 - 69 ULTIMATE 6.9583 5.801 4.0989 100.6231
46 - 70 ULTIMATE 6.9583 2.9321 2.0718 100.6231
47 - 71 ULTIMATE 6.9583 2.9321 2.0718 100.6231
48 - 72 ULTIMATE 6.9583 5.9728 4.2203 100.6231
49 - 73 ULTIMATE 6.9583 5.5193 3.8999 100.6231
Note: Allowable shear stress calculated assuming footing shear reinforcement >= Av,min will be provided
OWG.Footing Page 49 of 95
Footing Description - - F-1
OWG.Footing Page 50 of 95
BEAM SHEAR STRESS - Z DIRECTION - Ultimate Load Combinations - Without Buoyancy
OWG.Footing Page 51 of 95
49 - 73 ULTIMATE 6.5 2.909 2.0555 100.6231
OWG.Footing Page 52 of 95
47 - 71 ULTIMATE 6.5 3.4451 2.3094 100.6231
48 - 72 ULTIMATE 6.5 6.827 4.5765 100.6231
49 - 73 ULTIMATE 6.5 6.2387 4.1821 100.6231
Note: Allowable shear stress calculated assuming footing shear reinforcement >= Av,min will be provided
OWG.Footing Page 53 of 95
PUNCHING SHEAR STRESS - Ultimate Load Combinations - Without Buoyancy
OWG.Footing Page 54 of 95
49 - 73 ULTIMATE 9.2163 3.8425 183.7117
OWG.Footing Page 55 of 95
47 - 71 ULTIMATE 18.7007 8.7581 183.7117
48 - 72 ULTIMATE 8.7183 4.0831 183.7117
49 - 73 ULTIMATE 8.7183 4.0831 183.7117
OWG.Footing Page 56 of 95
45 - 69 ULTIMATE 18.4632 7.3114 183.7117
46 - 70 ULTIMATE 9.3805 3.7147 183.7117
47 - 71 ULTIMATE 9.3805 3.7147 183.7117
48 - 72 ULTIMATE 18.8947 7.4823 183.7117
49 - 73 ULTIMATE 16.8873 6.6874 183.7117
OWG.Footing Page 57 of 95
PUNCHING SHEAR CALCULATION FOR LOAD ELEMENT - P-1 - Footing - F-1 - Load Combination 2
Ultimate Soil Bearing At Left Critical Section - X Dir - SBl,x = 2.0188 ksf
Ultimate Soil Bearing At Right Critical Section - X Dir - SBr,x = 2.0188 ksf
Ultimate Soil Bearing At Left Critical Section - Z Dir - SBl,z = 0.7023 ksf
Ultimate Soil Bearing At Right Critical Section - Z Dir - SBr,z = 1.4572 ksf
Area Under Pressure Diagram X Dir - Ap,x = 23.5671 kips
Area Under Pressure Diagram Z Dir - Ap,z = 12.6045 kips
Footing Weight Within Punching Perimeter - Fw,p = 2.6266 kips
Soil Weight Within Punching Perimeter - Sw,p = 0.9917 kips
Applied Axial Load - P = 51.6772 kips
Total Punching Load - Pt = P + Fw,p + Sw,p = 55.2954 kips
Punching Load Due To Moment - X Dir = Npm,x = 0 kips
Punching Load Due To Moment - Z Dir = Npm,z = 28.1327 kips
Net Punching Load - X Dir - Np,x = Pt + Npm,x - Ap,x = 31.7283 kips
Net Punching Load - Z Dir - Np,z = Pt + Npm,z - Ap,z = 70.8236 kips
Maximum Punching Load - Pmax = Max (Np,x, Np,z) = 70.8236 kips
Average Effective Depth For Punching Shear - deff = 14.625 in
Punching Perimeter - Pp = 13.6667 ft
Punching Shear Stress - Ps = Pmax/(deff * Pp) = 29.5283 psi
OWG.Footing Page 58 of 95
FOOTING MOMENTS - X DIRECTION - Ultimate Load Combinations
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
OWG.Footing Page 59 of 95
FOOTING MOMENTS - X DIRECTION - Ultimate Load Combinations
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
1 - 25 ULTIMATE 26.8859 5 0 0
2 - 26 ULTIMATE 85.3087 5 0 0
3 - 27 ULTIMATE 80.5265 5 0 0
4 - 28 ULTIMATE 51.6267 5 0 0
5 - 29 ULTIMATE 19.8178 5 0 0
6 - 30 ULTIMATE 54.7973 5 0 0
7 - 31 ULTIMATE 22.9884 5 0 0
8 - 32 ULTIMATE 37.2827 5 0 0
9 - 33 ULTIMATE 40.6017 5 0 0
10 - 34 ULTIMATE 46.2435 5 0 0
11 - 35 ULTIMATE 46.2435 5 0 0
12 - 36 ULTIMATE 46.2435 5 0 0
13 - 37 ULTIMATE 46.2435 5 0 0
14 - 38 ULTIMATE 51.3829 5 0 0
15 - 39 ULTIMATE 52.2837 5 0 0
16 - 40 ULTIMATE 46.2435 5 0 0
17 - 41 ULTIMATE 46.2435 5 0 0
18 - 42 ULTIMATE 0 0 -19.1586 3.5
19 - 43 ULTIMATE 32.8846 5 0 0
20 - 44 ULTIMATE 0 0 -19.1586 3.5
21 - 45 ULTIMATE 39.2258 5 0 0
22 - 46 ULTIMATE 46.8174 5 0 0
23 - 47 ULTIMATE 0 0 -19.1586 3.5
24 - 48 ULTIMATE 64.6719 5 0 0
25 - 49 ULTIMATE 56.1944 5 0 0
26 - 50 ULTIMATE 64.7388 5 0 0
27 - 51 ULTIMATE 64.7388 5 0 0
28 - 52 ULTIMATE 64.7388 5 0 0
29 - 53 ULTIMATE 64.7388 5 0 0
30 - 54 ULTIMATE 75.0178 5 0 0
31 - 55 ULTIMATE 76.8193 5 0 0
32 - 56 ULTIMATE 64.7388 5 0 0
33 - 57 ULTIMATE 64.7388 5 0 0
34 - 58 ULTIMATE 0 0 -19.1586 3.5
35 - 59 ULTIMATE 0 0 -19.1586 3.5
36 - 60 ULTIMATE 0 0 -19.1586 3.5
37 - 61 ULTIMATE 0 0 -19.1586 3.5
38 - 62 ULTIMATE 0 0 -5.045 5
39 - 63 ULTIMATE 0 0 -1.2759 5
40 - 64 ULTIMATE 14.2464 5 0 0
41 - 65 ULTIMATE 5.7689 5 0 0
42 - 66 ULTIMATE 10.0076 5 0 0
43 - 67 ULTIMATE 10.0076 5 0 0
44 - 68 ULTIMATE 10.0076 5 0 0
45 - 69 ULTIMATE 10.0076 5 0 0
46 - 70 ULTIMATE 20.2866 5 0 0
47 - 71 ULTIMATE 22.0881 5 0 0
48 - 72 ULTIMATE 10.0076 5 0 0
49 - 73 ULTIMATE 10.0076 5 0 0
OWG.Footing Page 60 of 95
FOOTING MOMENTS - X DIRECTION - Ultimate Load Combinations
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
OWG.Footing Page 61 of 95
FOOTING MOMENTS - X DIRECTION - Ultimate Load Combinations
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
OWG.Footing Page 62 of 95
33 - 57 ULTIMATE 45.108 5.375 0 0
34 - 58 ULTIMATE 0 0 -15.1277 3.125
35 - 59 ULTIMATE 17.96 5.375 -15.1277 3.125
36 - 60 ULTIMATE 0 0 -15.1277 3.125
37 - 61 ULTIMATE 17.8194 5.375 -15.1277 3.125
38 - 62 ULTIMATE 0 0 -1.633 5.375
39 - 63 ULTIMATE 0 0 -3.6478 5.375
40 - 64 ULTIMATE 5.0565 5.375 0 0
41 - 65 ULTIMATE 10.3835 5.375 0 0
42 - 66 ULTIMATE 7.72 5.375 0 0
43 - 67 ULTIMATE 7.72 5.375 0 0
44 - 68 ULTIMATE 7.72 5.375 0 0
45 - 69 ULTIMATE 7.72 5.375 0 0
46 - 70 ULTIMATE 15.9193 5.375 0 0
47 - 71 ULTIMATE 14.4832 5.375 0 0
48 - 72 ULTIMATE 7.72 5.375 0 0
49 - 73 ULTIMATE 7.72 5.375 0 0
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
OWG.Footing Page 63 of 95
33 - 57 ULTIMATE 44.4536 5.375 0 0
34 - 58 ULTIMATE 18.5645 5.375 -15.2732 3.125
35 - 59 ULTIMATE 0 0 -15.2732 5.375
36 - 60 ULTIMATE 17.376 5.375 -15.2732 3.125
37 - 61 ULTIMATE 0 0 -15.2732 5.375
38 - 62 ULTIMATE 0 0 -4.3021 5.375
39 - 63 ULTIMATE 0 0 -2.2873 5.375
40 - 64 ULTIMATE 9.7292 5.375 0 0
41 - 65 ULTIMATE 4.4021 5.375 0 0
42 - 66 ULTIMATE 7.0657 5.375 0 0
43 - 67 ULTIMATE 7.0657 5.375 0 0
44 - 68 ULTIMATE 7.0657 5.375 0 0
45 - 69 ULTIMATE 7.0657 5.375 0 0
46 - 70 ULTIMATE 13.8288 5.375 0 0
47 - 71 ULTIMATE 15.265 5.375 0 0
48 - 72 ULTIMATE 7.0657 5.375 0 0
49 - 73 ULTIMATE 7.0657 5.375 0 0
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
OWG.Footing Page 64 of 95
33 - 57 ULTIMATE 52.5542 5.375 0 0
34 - 58 ULTIMATE 0 0 -16.8637 3.125
35 - 59 ULTIMATE 17.5014 5.375 -16.8637 3.125
36 - 60 ULTIMATE 0 0 -16.8637 3.125
37 - 61 ULTIMATE 16.0742 5.375 -16.8637 3.125
38 - 62 ULTIMATE 8.1833 5.375 -16.8637 3.125
39 - 63 ULTIMATE 4.6318 5.375 -16.8637 3.125
40 - 64 ULTIMATE 8.8824 5.375 0 0
41 - 65 ULTIMATE 19.3746 5.375 0 0
42 - 66 ULTIMATE 17.7144 5.375 0 0
43 - 67 ULTIMATE 21.7784 5.375 0 0
44 - 68 ULTIMATE 12.1422 5.375 0 0
45 - 69 ULTIMATE 16.1489 5.375 0 0
46 - 70 ULTIMATE 8.3743 5.375 0 0
47 - 71 ULTIMATE 8.3743 5.375 0 0
48 - 72 ULTIMATE 16.5736 5.375 0 0
49 - 73 ULTIMATE 15.1375 5.375 0 0
Load Combination Max Pos Pos Mom Max Neg Neg Mom
Moment Location Moment Location
kip-ft ft kip-ft ft
OWG.Footing Page 65 of 95
FOOTING REINFORCEMENT
OWG.Footing Page 66 of 95
in sq in/ft sq in/ft kip-ft/ft
1 - 7 ULTIMATE 6 6 12 0.442 0 0 X
2 - 8 ULTIMATE 6 6 12 0.442 0.389 -0.925 Z
Bottom Steel
OWG.Footing Page 67 of 95
OWG.Footing Page 68 of 95
OWG.Footing Page 69 of 95
OWG.Footing Page 70 of 95
OWG.Footing Page 71 of 95
OWG.Footing Page 72 of 95
OWG.Footing Page 73 of 95
OWG.Footing Page 74 of 95
FOOTING DEVELOPMENT LENGTH CALCULATION
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 8.179 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 1.062 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 3.327
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 4.839 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 6.954 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
OWG.Footing Page 75 of 95
Required rebar area based on moment Areqd = 0.952 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 3.714
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 4.335 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -1.78 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.215 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 16.41
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 1.275 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -1.78 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
OWG.Footing Page 76 of 95
Required rebar area based on moment Areqd = 0.226 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 15.62
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 1.34 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 10.036 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 1.305 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 2.708
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 5.946 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 6.877 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
OWG.Footing Page 77 of 95
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.941 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 3.755
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 4.287 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -2.254 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.273 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 12.953
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 1.616 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -1.797 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
OWG.Footing Page 78 of 95
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.228 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 15.471
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 1.353 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 6.318 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.864 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 4.09
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 3.937 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
OWG.Footing Page 79 of 95
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 7.034 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.913 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 3.871
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 4.159 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -1.536 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.195 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 18.097
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 1.156 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
OWG.Footing Page 80 of 95
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -1.984 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 3.534 sq in
Required rebar area based on moment Areqd = 0.24 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 14.719
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 1.422 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 4.899 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 2.651 sq in
Required rebar area based on moment Areqd = 0.448 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 5.915
OWG.Footing Page 81 of 95
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 2.722 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 4.899 kip-ft/ft
Cast concrete depth below rebar Cd = 3 in
Casting Postion Factor Fcp = 1
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
16.1 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 2.651 sq in
Required rebar area based on moment Areqd = 0.473 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 5.609
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 2.87 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= 0 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 0
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
0 in
Minimum required development length In tension ld,min = 0 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 2.651 sq in
Required rebar area based on moment Areqd = 0 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 0
OWG.Footing Page 82 of 95
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 0 in
Final Development Length ld = max{ld,rpr,ld,min} 0 in
Rebar size Rs = 6
Rebar diameter db = 0.75 in
Rebar area Ab = 0.442 sq in
Footing Moment M= -0.925 kip-ft/ft
Cast concrete depth below rebar Cd = 16 in
Casting Postion Factor Fcp = 1.3
Lightweight Concrete Modification Factor Lamda = 1
Epoxy Coating Factor Fep = 1
Rebar Size Factor Frb= 0.8
Transverse Reinforcement Index Ktr = 0
Rebar cover to rebar diameter ratio r = f(Cb/db) = 2.5
Reinforcement Grade Factor Frg= 1
Ultimate Bond Stress Tbd = Not Applicable 0 psi
Required development length in tension ld,o = (3/40)*(fy/sqrt(Lamda*fc')*(Fcp*Fep*Frb*Frg*db)/((Cb + Ktr)/db)
20.93 in
Minimum required development length In tension ld,min = 12 in
Consider reduction based On rebar stress ratio Cred = True
Provided rebar area Aprov = 2.651 sq in
Required rebar area based on moment Areqd = 0.079 sq in
Provided to required rebar ratio Rp,r = Aprov/Areqd 33.546
Reduced development length based on rebar ratio ld,rpr = ld,o/Rp,r 0.624 in
Final Development Length ld = max{ld,rpr,ld,min} 12 in
Geometry
Shape Rectangle
X Dim 2.25 ft
Z Dim 2.25 ft
Height 4.5 ft
Offset - X 0 ft
Offset - Z 0 ft
OWG.Footing Page 83 of 95
Rebar Size 5
Number of bars - X Dir 4
Number of bars - Z Dir 4
Total number of bars 12
Bar spacing - X Dir 7.2083 in
Bar spacing - Z Dir 7.2083 in
Area Provided 3.6816 sq in
Provided Reinforcement Ratio 0.0051
Requested Reinforcement Ratio 0.005
OWG.Footing Page 84 of 95
42 - 66 ULTIMATE 8.5472 738.0546 6.885 593.4082 1.0043 86.6333 86.1886
43 - 67 ULTIMATE 8.5472 738.0546 6.885 593.4082 1.0043 86.6333 86.1886
44 - 68 ULTIMATE 8.5472 738.0546 6.885 593.4082 1.0043 86.6333 86.1886
45 - 69 ULTIMATE 8.5472 738.0546 6.885 593.4082 1.0043 86.6333 86.1886
46 - 70 ULTIMATE 15.1472 520.8842 17.685 607.1963 1.7798 61.2108 34.334
47 - 71 ULTIMATE 12.6472 366.3237 17.685 512.2268 1.486 43.0428 28.9639
48 - 72 ULTIMATE 8.5472 738.0546 6.885 593.4082 1.0043 86.6333 86.1886
49 - 73 ULTIMATE 8.5472 738.0546 6.885 593.4082 1.0043 86.6333 86.1886
OWG.Footing Page 85 of 95
OWG.Footing Page 86 of 95
PIER DESIGN - Ultimate Load Combinations
Geometry
Shape Rectangle
X Dim 1.5 ft
Z Dim 2.25 ft
Height 4.5 ft
Offset - X 0 ft
Offset - Z 0 ft
Rebar Size 5
Number of bars - X Dir 3
Number of bars - Z Dir 3
Total number of bars 8
Bar spacing - X Dir 6.3125 in
Bar spacing - Z Dir 10.8125 in
Area Provided 2.4544 sq in
Provided Reinforcement Ratio 0.0051
Requested Reinforcement Ratio 0.005
OWG.Footing Page 87 of 95
20 - 44 ULTIMATE 31.4181 73.2714 87.3 203.5946 2.9847 6.9608 2.3321
21 - 45 ULTIMATE 23.5181 247.9708 32.85 346.3377 2.2342 23.5553 10.543
22 - 46 ULTIMATE 22.6181 125.9344 45 250.3049 2.1487 11.9575 5.5623
23 - 47 ULTIMATE 20.8181 75.4956 56.7 205.618 1.9777 7.1721 3.6264
24 - 48 ULTIMATE 36.6381 203.7424 56.43 313.7127 3.4806 19.3574 5.5593
25 - 49 ULTIMATE 35.0381 286.8421 45.63 372.686 3.3286 27.1313 8.1509
26 - 50 ULTIMATE 39.0181 252.6467 54 349.6346 3.7067 23.9999 6.4747
27 - 51 ULTIMATE 39.0181 252.6467 54 349.6346 3.7067 23.9999 6.4747
28 - 52 ULTIMATE 39.0181 252.6467 54 349.6346 3.7067 23.9999 6.4747
29 - 53 ULTIMATE 39.0181 252.6467 54 349.6346 3.7067 23.9999 6.4747
30 - 54 ULTIMATE 43.1181 213.95 64.8 321.471 4.0962 20.3262 4.961
31 - 55 ULTIMATE 45.6181 239.6505 64.8 340.3982 4.3337 22.7667 5.2531
32 - 56 ULTIMATE 39.0181 252.6467 54 349.6346 3.7067 23.9999 6.4747
33 - 57 ULTIMATE 39.0181 252.6467 54 349.6346 3.7067 23.9999 6.4747
34 - 58 ULTIMATE -8.9919 -24.9936 40.185 111.7686 0.8542 2.3769 2.7796
35 - 59 ULTIMATE -16.8919 -23.8282 79.965 112.8805 1.6047 2.2662 1.4106
36 - 60 ULTIMATE -0.1919 -0.6471 40.185 135.5253 0.0182 0.0615 3.3724
37 - 61 ULTIMATE -8.0919 -12.5131 79.965 123.6561 0.7687 1.1887 1.5464
38 - 62 ULTIMATE -8.9919 -108.7569 2.115 25.9229 0.8542 10.3107 12.0702
39 - 63 ULTIMATE -10.7919 -72.7515 9.585 64.6191 1.0252 6.9113 6.7412
40 - 64 ULTIMATE 8.2081 215.7152 12.285 322.7988 0.7798 20.4938 26.2758
41 - 65 ULTIMATE 6.6081 967.6811 1.485 217.3695 0.6278 91.4186 145.6239
42 - 66 ULTIMATE 7.4081 438.2303 6.885 407.2521 0.7038 41.6315 59.1506
43 - 67 ULTIMATE 7.4081 438.2303 6.885 407.2521 0.7038 41.6315 59.1506
44 - 68 ULTIMATE 7.4081 438.2303 6.885 407.2521 0.7038 41.6315 59.1506
45 - 69 ULTIMATE 7.4081 438.2303 6.885 407.2521 0.7038 41.6315 59.1506
46 - 70 ULTIMATE 11.5081 204.6531 17.685 314.4104 1.0933 19.4439 17.7784
47 - 71 ULTIMATE 14.0081 303.5718 17.685 382.6496 1.3308 28.7492 21.6034
48 - 72 ULTIMATE 7.4081 438.2303 6.885 407.2521 0.7038 41.6315 59.1506
49 - 73 ULTIMATE 7.4081 438.2303 6.885 407.2521 0.7038 41.6315 59.1506
OWG.Footing Page 88 of 95
OWG.Footing Page 89 of 95
PIER DESIGN - Ultimate Load Combinations
Geometry
Shape Rectangle
X Dim 3 ft
Z Dim 2.25 ft
Height 4.5 ft
Offset - X 0 ft
Offset - Z 0 ft
Rebar Size 5
Number of bars - X Dir 5
Number of bars - Z Dir 5
Total number of bars 16
Bar spacing - X Dir 7.6562 in
Bar spacing - Z Dir 5.4062 in
Area Provided 4.9087 sq in
Provided Reinforcement Ratio 0.0051
Requested Reinforcement Ratio 0.005
OWG.Footing Page 90 of 95
20 - 44 ULTIMATE 20.7462 362.2575 33.75 589.1295 2.9045 50.732 17.4557
21 - 45 ULTIMATE 28.7462 127.9597 87.75 390.6041 4.0245 17.9143 4.4513
22 - 46 ULTIMATE 18.1462 121.2757 56.7 378.9308 18.9 126.3136 6.6831
23 - 47 ULTIMATE 19.9462 192.617 45 434.3722 18.9 182.4603 9.6527
24 - 48 ULTIMATE 34.7362 610.5322 42.93 752.1372 8.55 148.5884 17.3788
25 - 49 ULTIMATE 41.5362 464.1294 59.13 660.6906 8.55 95.5375 11.1735
26 - 50 ULTIMATE 56.6462 866.9722 55.35 847.0169 7.9305 120.7645 15.2279
27 - 51 ULTIMATE 57.6462 767.1525 63.9 849.3238 8.0705 107.5646 13.2915
28 - 52 ULTIMATE 46.9462 681.8618 55.35 802.8323 6.5725 95.3125 14.5018
29 - 53 ULTIMATE 47.8462 531.3193 63.9 709.5594 6.6985 74.3811 11.1042
30 - 54 ULTIMATE 41.3462 555.7566 54 725.8208 5.7885 77.8035 13.4411
31 - 55 ULTIMATE 41.3462 555.7566 54 725.8208 5.7885 77.8035 13.4411
32 - 56 ULTIMATE 47.9462 518.7721 64.8 701.0882 6.7125 72.6238 10.8192
33 - 57 ULTIMATE 45.4462 466.3159 64.8 664.8118 6.3625 65.2768 10.2594
34 - 58 ULTIMATE -19.7138 -53.7075 80.865 220.3061 2.7599 7.5191 2.7244
35 - 59 ULTIMATE -11.7138 -61.3408 40.635 213.0034 1.6399 8.5999 5.2367
36 - 60 ULTIMATE -10.9138 -32.4698 80.865 240.5835 1.5279 4.5458 2.9751
37 - 61 ULTIMATE -2.9138 -19.4608 40.635 271.4038 0.4079 2.7245 6.679
38 - 62 ULTIMATE -13.5138 -130.4976 9.585 92.5602 18.9 182.5127 9.6567
39 - 63 ULTIMATE -11.7138 -124.0434 2.115 22.4388 18.9 200.2072 10.5896
40 - 64 ULTIMATE 6.2862 813.8688 1.215 157.2972 8.55 1106.712 129.44
41 - 65 ULTIMATE 13.0862 596.9405 14.985 682.4068 8.55 389.8378 45.5393
42 - 66 ULTIMATE 24.9862 1760.0865 8.235 577.4391 3.4981 247.8111 70.1201
43 - 67 ULTIMATE 25.9862 1156.4429 16.785 746.7689 3.6381 161.9009 44.4903
44 - 68 ULTIMATE 15.2862 1342.4572 8.235 723.1276 2.1401 187.9438 87.8115
45 - 69 ULTIMATE 16.1862 828.8488 16.785 859.0056 2.2661 116.0509 51.177
46 - 70 ULTIMATE 9.6862 1064.4963 6.885 755.7329 1.3561 148.524 109.5249
47 - 71 ULTIMATE 9.6862 1064.4963 6.885 755.7329 1.3561 148.524 109.5249
48 - 72 ULTIMATE 16.2862 796.197 17.685 863.6042 2.2801 111.5982 48.8326
49 - 73 ULTIMATE 13.7862 576.3132 17.685 739.2505 1.9301 80.6917 41.801
OWG.Footing Page 91 of 95
OWG.Footing Page 92 of 95
PIER DESIGN - Ultimate Load Combinations
Geometry
Shape Rectangle
X Dim 1.5 ft
Z Dim 1.5 ft
Height 4.5 ft
Offset - X 0 ft
Offset - Z 0 ft
Rebar Size 5
Number of bars - X Dir 3
Number of bars - Z Dir 3
Total number of bars 8
Bar spacing - X Dir 6.3125 in
Bar spacing - Z Dir 6.3125 in
Area Provided 2.4544 sq in
Provided Reinforcement Ratio 0.0076
Requested Reinforcement Ratio 0.005
OWG.Footing Page 93 of 95
Number of total tie bars 10
Provided tie bar area - X Dir 7.854 sq in
Required tie bar area - X Dir 0 sq in
Provided tie bar area - Z Dir 7.854 sq in
Required tie bar area - Z Dir 0
No. of internal ties specified- X Dir 2
No. of internal ties specified- Z Dir 2
OWG.Footing Page 94 of 95
OWG.Footing Page 95 of 95