Professional Documents
Culture Documents
sPRINKLER INSTALLATION CHECKLIST
sPRINKLER INSTALLATION CHECKLIST
sPRINKLER INSTALLATION CHECKLIST
INSTALLATION CHECKLIST
PROJECT BLDG.
LOCATION LEVEL
DATE AREA
ACTIVITIES:
DESCRIPTION ACTION
3. Pipes and supports are properly installed and secured with bolts, nuts and washers. YES NO
4. Pipe-work (size & route) are properly installed as per approved shop drawing. YES NO
5. Pipe-work fittings (type & size) are properly installed as per approved shop drawing. YES NO
6. Sprinkler Valves and Sprinkler heads (size & rating are properly installed as YES NO
COMMENTS:
SIGNATURES:
Fire Fighting Contractor Main Contractor Consultant Others
Name
Position
Company
Signature
Date