ABB Power Transformer plant, Saint Louis, MO. Phase Angle, Degrees
978-1-4673-1935-5/12/$31.00
Authorized licensed use limited ©2012
to: AmitabhIEEE
Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
2
35%
Neutral DC = 12 Amps large 1 – phase power transformer with a 3 – limb core and
30%
Neutral DC = 40 Amps the other is a large 3 – phase power transformer with a 3 –
25%
limb core. It can be seen that the magnetizing current drawn
20% by the 3 – phase, 3 – limb core is much smaller than the
15% magnetizing current drawn by the 1 – phase transformer for
10%
the same values of DC currents flowing through the windings
of these transformers.
5%
% Magnetizing Current vs DC Current
0%
8
0 30 60 90 120 150 180 210 240 270 300 330 360
Phase Angle, Degrees
7
Fig. 2 – Magnetizing current pulse due to DC current 3-Phase, 3-Limb Transformer
6
B. Factors affecting how much DC causes Semi – saturation 1-Phase Transformer
% M ag n e tizin g C u rren t
5
Core – type, core geometry, and core design
As mentioned earlier, the magnitude of the DC flux shift in 4
the core depends on the magnetic reluctance of the DC flux
path. Thus, the DC flux shift in a 3 – phase, 3 – limb core 3
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
3
% harmonic content for these two types of transformers. The Winding Hot Spot Temperature vs Time, 1-Phase Transformer
magnetizing current pulse in the 3 – phase transformer has 130
120
higher amplitudes of the lower order harmonics and much 110
lower amplitudes of the high order harmonics. For other core
could give an erroneous message to the differential relay set at Time, Minutes
10% flux outside the core. This results into additional flux linkages
to the structural parts, such as tie plates, yoke clamps, tank
8%
walls, tank cover, tank bottom, etc. This adds to the existing
6%
leakage flux due to load current and the high peak
magnetizing current pulse. The result is an additional increase
4% in temperature of these parts. Figure 7 below presents the
calculated hot spot temperature of a tie – plate for different
2% values of DC applied continuously for 120 minutes.
The figure shows that the hot spot temperature reached
0%
60 120 180 240 300 360 420 480 540 600 660 close to a final value within about 20 minutes from the
Harmonic Frequency, Hz application of the DC. This corresponds to the typical range of
Fig. 5 – Harmonic content of magnetizing current of transformers time constant of the metallic structural parts of transformers.
subjected to DC The increase in the hot spot temperature is still not significant
even after being subjected to a 50 Amps DC for 120 minutes
D. Calculation of increase in winding hot spot temperatures
continuously (32 C). Under actual GIC, however, this
The much higher magnetizing current, and the nature of its temperature rise will be much lower than shown below due to
wave – shape, produce correspondingly higher magnitudes of the very short duration nature of GIC (1 – 2 minutes). This is
leakage flux that is also rich in harmonics. This results in demonstrated in the following section of this paper.
appreciably higher eddy and circulating current losses in the Flitch-Plate Temperature vs Time
windings as well as the structural parts of the transformer but 160
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
4
III. EFFECTS OF GIC ON POWER TRANSFORMERS Calculation of the effect of GIC currents
In order to accurately determine the capability of a Due to the short duration of the high peaks of GIC (1 – 2
transformer to GIC, one needs to consider the nature of the minutes) and the fact that the duration of the resulting
signature of the GIC current as well as magnitudes and time magnetizing current pulse is only in the range of 1/10th to
duration involved with a GIC event. 1/12th of a cycle, the actual duration of the resulting core part
– cycle, semi – saturation, and associated high peak pulses of
Typical signature of GIC Currents the core magnetizing current, is only a few seconds. Hence,
Figs. 8 & 9, below, present two different examples of GIC the increase in temperature rises in the transformer windings
signatures; one is estimated [1] based on the original due to GIC would be expected to be at least an order of
measured VAR consumption at the PSE&G Salem Generating magnitude lower than that estimated based on continuous
station during the K9 GIC event on March 13, 1989. The duration DC currents. The same is true for temperature rises in
other is a recent signature obtained at a generating station in the core and structural parts. This is because the thermal time
southern Manitoba, Canada during a GIC event in February, constants of windings and metallic structural parts are much
2011. higher than the application time of the current pulse and
associated leakage flux in the transformer.
In order to illustrate the above, a profile of GIC per Figure
10 (a) below was assumed and winding hot spot temperature
was calculated for a fully loaded large 1 – phase power
transformer when subjected to this assumed GIC current
profile. The assumed GIC profile is a base level of 100 Amps
/ phase (300 Amps for a 3 – phase bank) followed by 2 minute
duration very high level GIC pulses of 400 Amps / phase
(1200 Amps for a 3 – phase bank) every 30 minutes. This GIC
profile / magnitudes is almost 5 times that experience at the
Salem Generating Station caused by the K9 GIC event of
March 13, 1989.
Fig. 8 – GIC current at Salem Generating station in 1989 The calculated winding temperatures due to the GIC profile
of Figure 10 (a) are presented in Figure 10 (b) below. It can be
seen from the figure that:
1. The temperature rise of the winding hot – spot due to
the base 100 Amps is about 7º C; which when added to
the winding hot spot temperature of 110 º C at full
load results in a total hot spot temperature of 118 º C.
2. The temperature of the winding hot – spot, due to the 2
minute duration of 400 Amps / phase of GIC,
increases by about 35 C; resulting in a hot spot total
temperature of about 152 C. The temperatures will be
much lower when the transformer is not fully loaded
and / or ambient temperature is lower than 30 C. Such
winding hot spot temperatures for such a short
duration would not cause any appreciable damage of
the windings, structural parts, or loss of insulation life
Fig. 9 – Measured GIC at a Generating station in of the transformer. In fact. Industry Standards allow
Southern Manitoba, Canada in February 2011 much higher winding hot spot temperature levels for
As it is demonstrated in these two figures, a Solar magnetic much longer times under emergency loading
event is associated with GIC which is quasi DC characterized conditions.
by high levels of DC as well as a few much higher peaks that 3. After the 2 – minute duration, the hot spot temperature
have very short time duration. For example, in Fig. 8 above, of the windings goes back down to the original
the GIC signature shows mainly several consecutive narrow (a temperature existing before that pulse of GIC. In fact,
few minutes duration) peaks of 20 amps magnitude over a it takes only about 3 minutes for this to happen as the
period of 90 minutes along with two high peaks of 80 & 100 time constant of the windings is only several minutes.
Amps of about 2 minute duration each. Similarly in Fig. 9, the
GIC event is characterized by a number of narrow peaks of < 4. The duration of that pulse of winding temperature rise
5 amps magnitude for a total accumulative duration of 5 is only a few minutes; which would not result in any
minutes and one 8 amps peak of < 1 minute duration. damage to the windings of this transformer anyway.
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
5
The same is true for structural parts, except that the This is an old Shell form transformer that had an old
temperature rise will be even smaller for these structural parts winding design that made it susceptible to overheating caused
as their time constant is higher than that of the windings. by high circulating current when subjected to high levels of
GIC currents. This winding design was originally optimized
Idc 400 Amps 400 Amps for the leakage flux pattern typically associated with normal
loading and operating conditions. During this high GIC event,
the high GIC current caused part – cycle, semi – saturation of
the core; during which the leakage flux pattern changed and
resulted in very high circulating currents in the series
100 Amps 100 Amps 100 Amps connection of the LV windings of this transformer [2, 3]. Same
design transformers at PSE&G experienced similar
(0,0)
overheating, although to a lesser degree. This old generic
30 2 30 2 30 Time, Minutes design of the LV winding was already changed since the early
seventies. The newer design minimizes circulating currents in
(a) Simulated GIC current
Winding Hot Spot Temperature vs Time
this winding in general as well as under the conditions of core
160
semi – saturation associated with high levels of GIC.
140
Another case reported in Reference [1] is a Shell – form
Transformer that had tank wall heating during the same GIC
Winding Hot Spot Tempt, Degree C
120
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
6
Other cases were reported in Reference [5] of significant An earlier experimental study of the effect of DC on power
winding overheating in a number of large core form power transformers was conducted by Tokyo Electric Power
transformers in S. Africa during the period between 2003 and Corporation, in collaboration with Toshiba, Hitachi, and
2004. These incidents were found to coincide with failures Mitsubishi [11]. The study tested several small scale models of
caused by the phenomenon of the conducting Copper core form as well as shell form transformers with different
Sulphide forming and causing failures of transformers world – core – types. Based on the measurements performed on these
wide; related to the Sulphur content in the mineral oil used in models, measurements were made on two large – Scale
these transformers. It is believed that higher temperatures in models of 1 – phase, 3 – limb 1000 MVA / 550 KV core form
the windings, caused by GIC, could have accelerated the and shell form transformers. These transformers were tested
formation of Copper Sulphide in these transformers; which with DC levels of up to 66 Amps; which corresponds to 400 –
would have contributed to the experienced winding damage. 600 Amps / phase for the corresponding full size transformers.
However, the magnitudes of the GIC reported to have been The DC was applied for up to 30 minutes continuous. The
associated with these incidents do not seem to be high enough leakage flux and temperatures were measured in windings and
to cause much winding overheating. structural parts of these transformers. The maximum
temperature rise measured after 30 minutes of applying such
One transformer in New Zealand that was reported in
large magnitudes of DC continuously was approximately 110
Reference [6] as having failed one minute after a GIC event is
C in both the Tie – plate for the core form transformer and the
believed to have been caused by System instability associated
core support in the shell form transformer. As suggested in the
with the GIC event. Similarly, it was reported by HQ in
paper, these temperature rises would have been 1/10th of these
reference [6] that two large power core form transformers
values if the Tie plates and the core support were made of non
were subjected to external faults during the GIC event and are
– magnetic steel. Also, the very short duration of GIC would
believed to have been caused by over – voltages due to
not allow hot spot temperatures to rise to a fraction of these
System instability. Also, Reference [7] reports on two
temperatures. The study, again, concluded that because of the
transformer failures in National Grid in Britain after a GIC
short duration of these temperatures, the transformer life
event but no details were given to ascertain that claim. Finally,
would not be appreciably affected.
in Reference [8], account is given of a number of 400 kV
large power core form transformers in southern Sweden that It is very important to note here that all testing performed
were subjected to high levels of GIC in the October 2003 GIC on full size transformers or scale models, applied DC current
event. No transformer damage was reported; including a 3 – continuously for 20 minutes and up to 2 hrs. The measured
Phase transformer that was subjected to an estimated peak of temperature rises were still in a very reasonable range. Also,
330 Amps of GIC in the neutral. The authors of this paper as demonstrated in section III above, a high amplitude GIC
reported that a 20 – 50 minute black out occurred in the duration of 1 – 2 minutes and the time constants of windings
Malmo area which was caused by the tripping of a 130 kV & structural parts being in the range of 5 – 15 minutes,
line resulting from the operation of a relay that had a higher respectively, winding and structural parts temperatures would
sensitivity to the 3rd harmonic than to the fundamental not increase to any significant levels. Also, as Reference [10]
frequency. suggested, because of the short duration of these temperatures,
transformer insulation life would not be appreciably affected.
It is to be noted here that, as in the case of the Salem shell
form transformer, core and shell form transformers with VI. EFFECT OF GIC ON POWER SYSTEMS
special winding arrangements and construction could As presented earlier in this paper, part – cycle, core semi –
experience large levels of circulating current and suffer some saturation is associated with a high magnitude narrow
winding damage if these transformers are subjected to very magnetizing current pulse once per cycle. This represents high
high levels of GIC that would cause core part – cycle, semi – levels of VAR pulse requirement on the power system causing
saturation. These types of transformers will need to be system voltage distortions. Also, the narrow current pulse
investigated and identified on an individual basis. causes capacitive components on the system, such as static
VAR compensators, etc. to increase their currents and may
V. ACTUAL MEASUREMSNTS OF EFFECT OF DC / GIC become overloaded and trip, which may contribute to grid
instability. Moreover, the magnetizing current pulse is
Two full size experiments were performed by Hydro associated with high harmonics, and as a result, resonance
Quebec [9] and FIN Power [10] where very large 1 – phase and may occur and stability of the grid may be compromised due
3 – phase power transformers were injected with high levels to the creation of virtual zero at some point and opening of
of DC (75 Amps for 20 minutes and up to 200 Amps for 30 lines. Also, as observed from Figure 5 of this paper,
minute intervals; respectively). Temperature rises were transformers with other than the 3 – phase, 3 – limb core –
measured in windings and structural parts of the transformers. type have a much lower % of the 2nd order harmonic. This is
It was found that the temperature rises were in a reasonable significant as lower levels of 2nd order harmonics associated
range in spite of the high levels of DC applied continuously with the total primary current of the transformer could give an
for long durations. As concluded by these studies, even high erroneous message to the differential relays set at a low value
levels of GIC currents should not cause transformer damage.
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
7
of the % 2nd harmonic content to differentiate between Inrush Disturbances”, IEEE Special Panel Session Report, July
current events and a fault condition. 12, 1989
[5] C. T Gaunt, G. Coetzee, “Transformer failures in regions
VII. CONCLUSIONS incorrectly considered to have low GIC-risk”, Mat Post
07, 3rd European Conference on MV & HV Substation
¾ High levels of GIC could cause part – cycle, semi –
Equipment, Nov 15-17, 2007, Lyon, France, Proceedings
saturation of transformer cores. This results in a short
of Power Tech, July 15, 2007, Lausanne, Switzerland
duration, high peak pulse of magnetizing current.
[6] Jean Beland, Kevin Small, “Space Weather Effects on
¾ Because of its short duration, in the great majority of the
Power Transmission Systems: The Cases of Hydro-
cases, even high levels of GIC would not cause damaging
Quebec and Trans power New Zealand Ltd,” Proceedings
overheating of neither windings nor structural parts of
of the NATO Advanced Research Workshop on Effects
power transformers.
of Space Weather on Technology Infrastructure, NATO
¾ Only transformers, core form or shell form, where part – Science Series, Vol 176, 2004
cycle, core semi – saturation would cause high winding
[7] A. Erinmez, J. G. Kappenman, W. A. Radasky:
circulating currents would be susceptible to significant
“Management of the geomagnetically induced current
winding overheating when the transformer is subjected to
risks on the National Grid Company’s electric power
high levels of GIC. The significant overheating of the
transmission system,” Journal of Atmospheric and Solar-
series connection of old design shell form transformers at
Terrestrial Physics, 64, 2002, p743-756
PSE&G during the 1989 GIC storm was an example of
this group of transformers. [8] M. Wik et al, “Space weather events in July 1982 and
October 2003 and the effects of geomagnetically induced
¾ Other cases of significant overheating and winding
currents on Swedish technical systems”, Annales
damage, reported in the published literature as have been
Geophysicae, 27, 1775-1787, 2009.
caused by GIC, were found to have been caused totally,
or partially, by other effects, or by system instability [9] P. Picher, L. Bolduc et al, “Study of the acceptable DC
experienced during a GIC event. current limit in core-form Power Transformers”, IEEE
Transactions on Power Delivery, Vol. 12, No. 1, January
¾ The main impact of GIC is on the system instability it
1997, Page 257-265.
could cause due to high levels of VARS and significant
current harmonics as a result of transformer core part – [10] Matti Lahtinen & Jarmo Elovaara, “GIC Occurrences and
cycle, semi – saturation. GIC Test for 400 kV System Transformer”, IEEE
Transactions on Power Delivery, Vol. 17, No. 2, April
VIII. ACKNOWLEDGMENTS 2002, Page 555-561.
The authors of this paper would like to acknowledge technical [11] Nobuo Takasu et al, “An experimental analysis of DC
and editorial comments provided by Mr. Juan Castellanos of excitation of Transformers by Geo - magnetically Induced
GE Prolec, Mr. James McIver of Siemens, and Mr. Mohamed Currents”, IEEE Transactions on Power Delivery, Vol. 9,
Diaby of EFACEC. The authors also would like to thank Mr. No. 2, April 1994, Page 1173-1182.
Mats Bernesjo for his help during the production and
submission process of this document.
X. BIOGRAPHIES
IX. REFERENCES
Dr. Ramsis S. Girgis (F'93) is presently
[1] John Kappenman, “Geomagnetic Storms and Their the Research & Development manger at
Impacts on the U.S. Power Grid”, Report # Meta-R-319 the Power Transformer Division of ABB
by Metatech Corporation submitted to Oak Ridge located in St. Louis, Missouri. He is also
National Laboratory, Pages 1-197. the leader of the global ABB R&D
[2] Ramsis Girgis & Chung-Duck KO, “Calculation activities in the area of “Transformer
Techniques And Results Of Effects Of GIC Currents as Core Performance”. Dr. Girgis received
Applied to Two Large Power Transformers”, IEEE his Ph.D. degree from the University of
Transactions on Power Delivery, Vol. 7, No. 2, April Saskatchewan, Canada, in Electrical
1992, Page 699-705. Engineering in 1978. He has over 40
years of R&D experience in the area of power, distribution,
[3] Ramsis Girgis, Chung-Duck KO, and Dennis Scott, and high frequency transformers, rotating machines, and pulse
“Analysis of Transformer Overheating due to power components. He has published and presented over 60
Geomagnetic ally Induced Currents”, Proceedings of the scientific papers in IEEE, IEE, CIGRE, and other international
American Power Conference, Vol. 153 II, 1992, pp1167. journals. He co-authored chapters in two electrical
[4] Phil Gattens and R. M. Waggel; “Investigation of engineering handbooks on transformer design and transformer
Transformer overheating due to Solar Magnetic noise. He is presently the chairman of the IEEE Transformers
Standards “Audible Sound and Vibrations” Working Group.
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.
8
Authorized licensed use limited to: Amitabh Sarkar. Downloaded on October 27,2023 at 19:31:29 UTC from IEEE Xplore. Restrictions apply.