Project: Maintenance for NESTE

Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform


File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Overall Scaffold 3D View


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1
A B C D E F G

Scaffold Plan View


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Scaffold Front View at Grid 6


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Scaffold Front View at Grid 3 & 5


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Scaffold Front View at Grid 1


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Scaffold Side View at Grid F & G


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Scaffold Side View at Grid C & D


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading
4. Not all of them are shown in the drawings to ease of reading
Project: Maintenance for NESTE
Subject: Tubular Scaffold(2W*6L*5.7H) with Suspended-Scaffold(3.6S)\Working-Platform
File Name: HL_NESTE_2x6x5.7H+3.6S_Drg.V1

Scaffold Side View at Grid A & B


Notes:
1. All Tubular Steels Scaffold Pipes are ∅48.6x2.4mm wall thick (STK 500).
2. Right angle clamps should be used for all the right angle connections.
3. Lateral supports, diagonal bracings, handrails, toe-boards, lifelines, etc. according to MOM requirements shall be provided.
4. Not all of them are shown in the drawings to ease of reading