Project Charter

Goal Statement:
Reduction of Lens & FPCB Dropping from 10% →5 %
Problem Statement :
Dropping percentage in Q3 has been 10% based on MES data
which is affected our Targeted Yied rate
In Scope:
All equipment Nozzles, vacuum pressure, Utility and all existing
internal process

Business Case:

- Dropping of Lens and FPCB is main concern in camera


manufacturing .
- Due to dropping our UPH drop, productivity reduced
and OEE not achieved as per target and yield also reduced.
- Customer is also concerned about this dropping and due to
which scrap rate also increased.
Failure of this lead to not achieve our operation's KPI
Start End

Period
Oct-23 Dec-23

Out Scope:
modification in Nozzles,procurement of Measureable Goals:
specific vacuum pads
Suppliers Inputs Process Outputs Customers
(Providers of the required (Resources required by the (Top level description of the (Anyone who receives a
resources) process) activity) (Deliverables from the process) deliverable from the process)
Requirements Requirements
Pasta that is
tender, but Restaurant
Restaurant owner Stove To heat water slightly firm patrons
Pasta that
makes patrons
happy and
To hold Cooked pasta prepared Restaurant
Restaurant owner Pan ingredients quickly owner
Pasta that
passes test for
Cook pasta
To measure done "sticks to
from adding
salt and stir the wall when
ingredients to
Restaurant owner Spoon ingredients thrown!) Cook
determine if
To measure oil done
Restaurant owner Measuring cup and water
Restaurant owner Water To cook pasta
Seasoning and
change alter
water boiling
Grocery supplier Salt temperature
Keep pasta
Grocery supplier Oil from sticking
Product for
Grocery supplier Raw Pasta patron meals

Suppliers Inputs Process Outputs Customers


(Providers of the (Resources required ( Top level description of activity) (Deliverables from the (Anyone who receives a deliverable from the
required resources) by the process) process) process)

Requirements Requirements
8
What does the process expect from each input? 5
7 What does the process expect from each input?
Who is the supplier of each input? What does each customer expect from each output?
Who is the supplier of each input? 2 What does each customer expect from each output?
3
When
does the What are the outputs from the process?
What are the outputs from the process?
6 process
What Inputs are required to enable this processstart?
to occur?
What Inputs are required to enable this process
1 to occur?
4
What is the process?
What is the process? Who is the customer of each output?
Who is the customer of each output?

2
When
does the
process
end?
Suppliers Inputs Process Outputs Customers
(Providers of the required (Resources required by the (Anyone who receives a
resources) process) (Top level description of the activity) (Deliverables from the process) deliverable from the process)
Requirements Requirements
Company Equipment Capture image
Equipment Typesetting Tape on Carry End User
manufacturer Tape sticking with carry Clear
Glue dispense No Dust particle
Comapany Supplier FPCB,Lens lens mounted on FPCB inside camera Customer
on FPCB
module

washing
Company Equipment Incoming Child cleaned child parts from
Washing Machine
manufacturer parts dust
FPCB,Lens
Camera Module prepare
Cleaning of
Company Equipment child parts with Cleaned child part before
Plasma
manufacturer N2 and Ar glue dispensing
gases
Semifinished camera
Company Equipment Testing of
Active Alignment machine manufactured with power
manufacturer parameters
ON/OFF
Company Equipment sticking film on
Protective Film Machine camera with sticking film
manufacturer Camera