Process Data Report Printed: 17:25:25 4/8/2024

Comments:
File: 0408-1.dat Product: 33CL Plant # Line or Oven # 08/04/2024
Date: 4/8/2024 Process: IBO Date Material Run
Time: 15:53:25 Operator: EL MORHIR Bake Temperature Length of Bake
S/N: 556549-09 Factory: Actual Sheets Per Minute Oven Stops
Company: CP CANPACK MOROCCO

Taylor Set/Zone 1: 2: 3: 4: 5: 6: 7:
Taylor Actual/Zone 1: 2: 3: 4: 5: 6: 7:
Recorder Actual/Zone 1: 2: 3: 4: 5: 6: 7:

200
°C
threshold 190 °C

150

100

50

0:00 h:mm 0:01 0:02 0:03 0:04 0:05


Channel Peak Time Reached threshold Time Reached Time Over
Air dome #1 208 0:02:29.1 190 0:01:38.4 0:01:28.3
Air Neck #2 210 0:02:24.6 190 0:01:31.4 0:01:33.4
Dome #3 206 0:02:46.6 190 0:01:57.9 0:01:15.9
High wall #4 207 0:02:34.5 190 0:01:45.4 0:01:23.1
Low wall #5 207 0:02:33.4 190 0:01:48.9 0:01:20.8