INDEX SHEET
A PAGE STD A
DESCRIPTION
NUMBER NUMBER
1 COVER SHEET N/A
2 INDEX SHEET N/A
3 GENERAL NOTES N/A
4 LIGHTING SUPPORT FIXING FOR SECONDARY STEEL 301
5 LIGHTING TRAY AND CONDUIT - TYPICAL ARRANGEMENT 302
6 LIGHTING SUPPORT FIXING FOR HANDRAIL MOUNTING 303
7 FLOOD LIGHT FIXTURE ON STEEL STRUCTURE 304
8 POLE MOUNTED FLUORESCENT FIXTURE 305
9 FLUORESCENT FIXTURE MOUNTING WITH BRACKET 306
10 EXIT/ESCAPE LIGHT FIXTURE HANDRAIL MOUNTED 307
B 11 EXIT/ESCAPE LIGHT FIXTURE POLE MOUNTED 308 B
12 CONVENIENCE OUTLET HANDRAIL MOUNTED 309
13 CONVENIENCE OUTLET FLOOR MOUNTED 310
EXIT/ESCAPE LIGHT FIXTURE PENDANT MOUNTING
14 311
ON SECONDARY STEEL
15 EXIT/ESCAPE LIGHT FIXTURE ON STEEL STRUCTURE 312
16 POLE MOUNTED FLUORESCENT FIXTURE ON HAND RAIL 313
17 FLUORESCENT FIXTURE BELOW STRUCTURAL MEMBER 314
20 SPARE N/A
C C
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
GENERAL NOTES :
1. ALL THE SUPPORTING MATERIALS SHALL BE OF PAINTED STEEL. ALL CONDUITS WILL BE HOT DEEP
A A
GALVANIZED STEEL.
2. LIGHTING FIXTURES, SOCKET OUTLETS AND JBS SHAPES AND SIZES SHOWN IN THIS DOCUMENT ARE
INDICATIVE ONLY.
4. LIGHTING CABLES WILL BE LAID IN ONE LAYER TOUCHING. BUNCHING CAN BE USED FOR CABLE
TRAY FILLING OPTIMIZATION IF BUNCH IS LIMITED TO SIX CABLES AND BUNCH IS NOT LARGER TO 200mm
6. SUPPORT AND MOUNTING PLATE SHAPE AND DIMENSIONS FOR JBs AND LIGHTING FIXTURE SHALL BE
DETERMINED BY THE SUB - CONTRACTOR, BASED ON THE ACTUAL DIMENSION OF THE EQUIPMENT.
B B
7. THE FIXING ARRANGEMENT OF LIGHTING FIXTURE / SOCKETS SHOWN IN STD'S ARE IN INDICATIVE ONLY.
IT IS TO BE ADJUSTED BASED UPON VENDOR INFORMATION .
8. WHEREVER APPLICABLE, THE LIGHTING CABLE FROM THE TRAY TO THE FIXTURE SHALL BE FIXED ON
STRUCTURE USING STAINLESS STEEL CABLE CLIPS.
9. AS GENERAL RULE AND FOR ACCESSIBILITY, THE JUNCTION BOXES ARE INSTALLED UNDER THE
LIGHTING FIXTURES MOUNTED ON COLUMN, DEPENDING ON CONDITIONS CONSTRAINT ON SITE, THE
JUNCTION BOXES CAN ALSO BE INSTALLED ABOVE LIGHTING FIXTURES
10. ABBREVIATIONS:
CTR - CONTRACTOR
VDR - VENDOR
S/CTR - SUB-CONTRACTOR ( CONSTRUCTION SUB-CONTRACTOR)
STR - STRUCTURAL
C C
-COMPLIANCE WITH DOC 076328C-TS00-JSD-1600-0003 - PHILOSOPHY OF LIGHTING A IFR 23.07.18 ISSUED FOR REVIEW KUP NSK KGP STD INSTALLATION FOR LIGHTING
-THE SURROUNDING SPACE AND INSTALLATION ARRANGEMENT ALLOW THE GOOD OPERATION IN FPSO CONDITION REV STATUS DATE DESCRIPTION BY CHK. APP. GENERAL NOTES
-AROUND SPACE AND ARRANGEMENT PROVIDE ADEQUATE ACCESS FOR MAINTENANCE CTR DRAWING NUMBER: AREA / UNIT:
-HSED RULES APPLICABLE IN THE PROJECT ARE SATISFIED 076328C-TS00-STD-1683-0001 -
COMPANY DRAWING NUMBER: REVISION:
N/A 0
This document and all the information contained herein are the confidential and exclusive property of TechnipFMC,
and may not be reproduced, disclosed, or made public in any manner prior to express written authorization by TechnipFMC. ORIG. SIZE: A3 SCALE: N.T.S GEN_R SHEET: 3 OF 20
1 2 3 4 5 6
1 2 3 4 5 6
3 3
B C
5 HORIZONTAL OR VERTICAL CONDUIT RUN SECTION C-C
SEE NOTE 5
ON STEEL STRUCTURE
FOR WELDING ARRANGEMENT
NOTES :
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE
EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
SECONDARY STEEL SECONDARY STEEL FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
REFER RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
7 WELD 2. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR WILL PROVIDE
APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
B WELD 1 B
7
4 3. TRAY SUPPORT SPACING 2M (MAX.) & 0.3M FROM END.
2 1 4. CABLE ROUTING UP TO 2 CABLES WILL BE DONE USING OPEN CONDUITS (PROVIDED THAT IT'S
OCCUPYING LESS THAN 35% AT THE CONDUIT). ROUTING WITH 3 CABLES OR MORE WILL BE DONE
2 4 USING CABLE TRAY .
SECTION B - B 5. SUITABLE WASHER WILL BE USED TO PREVENT GALVANIC CORROSION BETWEEN STAINLESS
SECTION B - B STEEL / CABLE TRAY AND CARBON STEEL SUPPORT.
OPTION 1
OPTION 2
6. STEEL ANGLE PLATE SHALL BE WELDED TO SECONDARY STEEL DEPENDING ON LOAD AND
CONSTRAINTS CONDITIONS.
SECONDARY STEEL SECONDARY STEEL
8 HDGS U-BOLT S/CTR
C
7 PAINTED STEEL PLATE SUPPORT FOR JB INCLUDING FIXING CLAMP C/W NUTS, S/CTR
7 BOLTS, WASHERS
WELD C
1 STAINLESS STEEL TRAY FIXING CLIP WITH INSULATING WASHERS BOLTS,
6 S/CTR
WASHERS
4
WELD 5 CABLE TRAY (PERFORATED) OR HDGS CONDUIT S/CTR
2
4 CABLE GLAND TO SUIT LIGHTING CABLE S/CTR
PAINTED STEEL SUPPORT FOR TRAY / CONDUIT (INCLUDING FIXING CLAMP IN
SECTION B - B 3 CASE OF CONDUIT) S/CTR
2 4 1 7
OPTION 3 2 LIGHTING CABLE S/CTR
SECTION B - B
1 JUNCTION BOX S/CTR
OPTION 4
ITEM MATERIAL DESCRIPTION SUPPLIED BY
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
IDENTIFICATION
SYMBOL
STD
IVE 302
AT 2 " DIA. CONDUIT (SEE NOTE 1)
A D IC A
IN
2M
JUNCTION BOX
JUNCTION
BOX
TO LOCAL
LIGHTING U BOLT LIGHTING
PANEL FITTING (TYP)
2 " DIA. CONDUIT
INDICATIVE
2 M MAX.
1.9 M
NOTES :
C C
1. PREFERRED ROUTING FOR QUANTITY OF 2 CABLES IS 2" DIA. CONDUIT. PROVIDED THAT CABLE
U BOLTS TYP.
OCCUPATION IS NOT EXCEEDING 35% OF THE CONDUIT CAPACITY.
2 M MAX.
CABLE FIXING PREFERRED ROUTING FOR QUANTITY OF 3 CABLES AND ABOVE OR WHERE 2 CABLES EXCEED 35%
SEE NOTE 3 OCCUPATION OF 2" DIA. CONDUIT : CABLE TRAY.
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
11 IDENTIFICATION
POLE SYMBOL
HAND RAIL STD
11 303
6 6
5
A A
WELD
5
VIEW "A"
NOTES :
WELD 7
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE
4
6 6 EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
1 4 REFER RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
PLATFORM 1
WELD 2. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR WILL PROVIDE
5 5 APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
B B
2 3. TRAY SUPPORT SPACING 2M (MAX.) & 0.3M FROM END.
SECONDARY STEEL SECONDARY
3 STEEL 4. CABLE ROUTING UP TO 2 CABLES WILL BE DONE USING OPEN CONDUITS (PROVIDED THAT IT'S
OCCUPYING LESS THAN 35% AT THE CONDUIT). ROUTING WITH 3 CABLES OR MORE WILL BE DONE
WELD USING CABLE TRAY .
5. SUITABLE WASHER WILL BE USED TO PREVENT GALVANIC CORROSION BETWEEN STAINLESS
3 STEEL / CABLE TRAY AND CARBON STEEL SUPPORT.
10
8
9 8 COMPANY:
ENERGEAN ISRAEL LIMITED
3 3
PROJECT:
1 2 3 4 5 6
A
1 2 3 4 5 6
STANDARD
IDENTIFICATION
SYMBOL
4
STD
304
A 5
NOTES :
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE
EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
REFER RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
2. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR WILL PROVIDE
APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
1
3. TRAY SUPPORT SPACING 2M (MAX.) & 0.3M FROM END.
FROM H=4m TO H=8m 4. CABLE ROUTING UP TO 2 CABLES WILL BE DONE USING OPEN CONDUITS (PROVIDED THAT IT'S
6
ABOVE FLOOR OCCUPYING LESS THAN 35% AT THE CONDUIT). ROUTING WITH 3 CABLES OR MORE WILL BE DONE
B USING CABLE TRAY . B
STEEL STRUCTURE
3
WELDING WELDING
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
TYPE-A TYPE-A IDENTIFICATION
SYMBOL
STD
NOTES : 318
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS
A SHOWN AS 2500mm IN THE PRESENT STANDARD. HOWEVER THIS A
DETAIL-6 ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE EACH
LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER
BE LESS THAN 2200mm FROM FLOOR PLATFORM ELEVATION. FOR
EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES, REFER
RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
DETAIL-5 N/A 0
This document and all the information contained herein are the confidential and exclusive property of TechnipFMC,
and may not be reproduced, disclosed, or made public in any manner prior to express written authorization by TechnipFMC. ORIG. SIZE: A3 SCALE: N.T.S GEN_R SHEET: 8 OF 20
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
IDENTIFICATION
SYMBOL
100
STD
8 306
1 4
A A
50
400
4 3 5
2
NOTES :
50
3
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
1
8 PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE
EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
8 FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
VIEW FROM `C'
REFER RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
B 2. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR WILL PROVIDE B
TYPE-I APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
6 5
S/CTR
7
C 6 PIPE SUPPORT GRIP (NEOPRENE OR EQUAL) S/CTR C
2
400
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
HAND RAIL IDENTIFICATION
SYMBOL
6 6
5 STD
5 1
11 307
A 11 A
1 4
1 2 3 4 5 6
1 2 3 4 5 6
3 11 STANDARD
VIEW "C" 9
4 IDENTIFICATION
4 11 2
SEE NOTE 6 SYMBOL
1
NOTES : STD
1
WELD EXIT 308
1. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY.
VIEW "A" 5
SUB-CONTRACTOR WILL PROVIDE APPROPRIATE SUPPORTING SYSTEM FOLLOWING
A A
THIS PRINCIPLE.
11 VIEW-C 2. TRAY SUPPORT SPACING 2 M (MAX.) & 0.3 M (MAX) FROM END.
TYPE-1
3. CABLE ROUTING UPTO 2 CABLES WILL BE DONE USING OPEN CONDUITS (PROVIDED
6 WELD
(UNLESS OTHERWISE NOTED)
THAT IT'S OCCUPYING LESS THAN 35% OF THE CONDUIT). ROUTING WITH 3 CABLES
6 SEE NOTE 6
OR MORE WILL BE DONE USING CABLE TRAY.
HAND RAIL 4. REFER SHEET-006, FOR FIXING THE JB & POLE IN THE HANDRAIL THROUGH WELDING
9 10 ARRANGEMENT.
11
2750
10 9
5. REFER SHEET-005, FOR CABLE TRAY / CONDUIT ARRANGEMENT.
SEE NOTE 4
VIEW-C 6. BOLTING SOLUTION IS PROPOSED IN THIS STANDARDS. HOWEVER, WELDING
TYPE-2 SOLUTION CAN BE CONSIDERED BY S/CTR IF IT IS MORE SUITABLE FOR THE
CONSTRUCTION SEQUENCE .
B 7. STEEL ANGLE PLATE SHALL BE WELDED TO SECONDARY STEEL DEPENDING ON LOAD B
12 AND CONSTRAINTS CONDITIONS.
16 PAINTED STEEL CHANNEL S/CTR
10 8 PAINTED HDGS SUPPORT FOR TRAY / CONDUIT INCLUDING FIXING CLAMP
10 15 S/CTR
8 C/W NUTS,BOLTS, WASHERS .
2
14 CABLE TRAY (PERFORATED) OR HDGS CONDUIT S/CTR
SEE NOTE 4 2
9 SEE NOTE-4 13 STAINLESS STEEL TRAY FIXING CLIP WITH INSULATION S/CTR
PLATFORM
9 WASHER.
5 12 PAINTED STEEL SUPPORT FOR JB INCLUDING NUTS, BOLTS, S/CTR
SECONDARY STEEL WASHERS
SECONDARY STEEL
7 11 FLAT BAR / PAINTED STEEL S/CTR
14 SEE NOTE 3 WELD
10 PAINTED STEEL PLATE TO FIX POLE S/CTR
SEE NOTE 7
9 HGDS "U" BOLT COMPLETE WITH NUT & WASHER S/CTR
7 15
C 8 JUNCTION BOX S/CTR C
15 LIGHTING CABLE
7 S/CTR
VIEW A
13 6 HDGS PIPE DIA 2" S/CTR
14 SEE NOTE 3 PLASTIC BUSHING
OPTION-A 5 S/CTR
4 MOUNTING BRACKETS WITH BOLTS & WASHERS S/CTR
6 3 PIPE CAP S/CTR
VIEW "A" 10 6 2 CABLE GLAND TO SUIT LIGHTING CABLE
10 S/CTR
8 1 EXIT / ESCAPE LIGHT FIXTURE S/CTR
12
ITEM MATERIAL DESCRIPTION SUPPLIED BY
8
COMPANY:
ENERGEAN ISRAEL LIMITED
14 PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
13 STANDARD
14 SEE NOTE 6 13
VIEW-C IDENTIFICATION
13 8 WELD NOTES : SYMBOL
SEE NOTE 6 1 1. STEEL PROFILES.SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY.
1 STD
14
SUB-CONTRACTOR WILL PROVIDE APPROPRIATE SUPPORTING SYSTEM
309
8 1 14 FOLLOWING THIS PRINCIPLE.
2
2
A 2. TRAY SUPPORT SPACING 2 M (MAX.) & 0.3 M (MAX) FROM END. A
5 3. CABLE ROUTING UPTO 2 CABLES WILL BE DONE USING OPEN CONDUITS
2 5 (PROVIDED THAT IT'S OCCUPYING LESS THAN 35% OF THE CONDUIT).
5
ROUTING WITH 3 CABLES OR MORE WILL BE DONE USING CABLE TRAY.
VIEW-C VIEW-C
15 4 TYPE-2 4. REFER SHEET-006, FOR FIXING THE JB & POLE IN THE HANDRAIL THROUGH
TYPE-1 5 WELDING ARRANGEMENT.
HAND RAIL 5. REFER SHEET-005, FOR CABLE TRAY / CONDUIT ARRANGEMENT.
8
10 6. BOLTING SOLUTION IS PROPOSED IN THIS STANDARDS. HOWEVER, WELDING
SEE NOTE 4 SOLUTION CAN BE CONSIDERED BY S/CTR IF IT IS MORE SUITABLE FOR THE
CONSTRUCTION SEQUENCE .
COMPANY:
ENERGEAN ISRAEL LIMITED
9 PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
6
VIEW 'A' WELDED IDENTIFICATION
NOTES : SYMBOL
REFER NOTE-7
1 1
1. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. STD
1
SUB-CONTRACTOR WILL PROVIDE APPROPRIATE SUPPORTING SYSTEM 310
WELDED
FOLLOWING THIS PRINCIPLE.
A A
2. TRAY SUPPORT SPACING 2 M (MAX.) & 0.3 M (MAX) FROM END.
1300
A 7. BOLTING SOLUTION IS PROPOSED IN THIS STANDARDS. HOWEVER, WELDING
REFER NOTE-6 REFER NOTE-6
B SOLUTION CAN BE CONSIDERED BY S/CTR IF IT IS MORE SUITABLE FOR THE B
CONSTRUCTION SEQUENCE .
7
8. STEEL ANGLE PLATE SHALL BE WELDED TO SECONDARY STEEL DEPENDING
ON LOAD AND CONSTRAINTS CONDITIONS.
1 2 3 4 5 6
1 2 3 4 5 6
VARIABLE
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
12
PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE
11 8 EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
SEE NOTE 5 FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
REFER RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
EXIT
2. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR WILL PROVIDE
3
7 APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
2500mm (MIN) 3. TRAY SUPPORT SPACING 2M (MAX.) & 0.3M FROM END.
1 SEE NOTE 1
4. CABLE ROUTING UP TO 2 CABLES WILL BE DONE USING OPEN CONDUITS (PROVIDED THAT IT'S
OCCUPYING LESS THAN 35% AT THE CONDUIT). ROUTING WITH 3 CABLES OR MORE WILL BE DONE
USING CABLE TRAY .
B B
SECONDARY STEEL 5. SUITABLE WASHER WILL BE USED TO PREVENT GALVANIC CORROSION BETWEEN STAINLESS
SECONDARY STEEL STEEL / CABLE TRAY AND CARBON STEEL SUPPORT.
WELD
6. STEEL ANGLE PLATE SHALL BE WELDED TO SECONDARY STEEL DEPENDING ON LOAD AND
CONSTRAINTS CONDITIONS.
9
SECONDARY STEEL
SEE NOTE:6 12 PAINTED STEEL SUPPORT FOR ESCAPE LIGHTING S/CTR
SEE NOTE:6 INCLUDING NUTS, BOLTS & WASHERS
WELDED
11 MOUNTING BRACKETS WITH BOLTS AND WASHERS S/CTR
4 7
12 PAINTED STEEL SUPPORT FOR JB INCLUDING FIXING CLAMP C/W
10 S/CTR
WELD 1 NUTS, BOLTS, INSULATION WASHERS
8 6 11
4 9 STAINLESS STEEL TRAY FIXING CLIP WITH INSULATION WASHER S/CTR
WELDED 2 8 CABLE TRAY (PERFORATED) OR HDGS STEEL CONDUIT S/CTR
C 1 C
7 CABLE GLAND TO SUIT LIGHTING CABLE S/CTR
SECTION A-A
WELDING SECTION B - B 6 PAINTED STEEL SUPPORT FOR TRAY / CONDUIT INCLUDING
SECTION C-C S/CTR
ARRANGEMENT OPTION 1 FIXING CLAMP C/W NUTS, BOLTS, WASHERS.
5 STAINLESS STEEL CABLE CLIP S/CTR
PAINTED STEEL SUPPORT SUITABLE FOR PENDANT MOUNTING OF FIXTURE
4 S/CTR
INCLUDING FIXING CLAMP C/W NUTS, BOLTS, WASHERS
SECONDARY STEEL SECONDARY STEEL 3 LIGHTING CABLE S/CTR
SECONDARY STEEL
2 JUNCTION BOX S/CTR
1 EXIT / ESCAPE LIGHT FIXTURE S/CTR
WELD 7 ITEM MATERIAL DESCRIPTION SUPPLIED BY
WELD
7 1
COMPANY:
4 WELDED ENERGEAN ISRAEL LIMITED
1 PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
6 STD
4 3
312
A
EXIT A
9
NOTES :
7
1 7 2 2 5 1. PRESENT GRAPHIC DESIGN SHOWS STANDARD STEEL PROFILES. THIS IS FOR
PRINCIPLE ONLY. S/CTR WILL PROVIDE APPROPRIATE SUPPORTING SYSTEM
SEE NOTE 3 FOLLOWING THIS PRINCIPLE.
7
0 IFD 24.08.18 ISSUED FOR DESIGN KUP NSK KGP STD INSTALLATION FOR LIGHTING
A IFR 23.07.18 ISSUED FOR REVIEW KUP NSK KGP EXIT/ESCAPE LIGHT FIXTURE ON
REV STATUS DATE DESCRIPTION BY CHK. APP. STEEL STRUCTURE
11
CTR DRAWING NUMBER: AREA / UNIT:
SECTION C - C SECTION C - C 076328C-TS00-STD-1683-0001 -
OPTION 1 OPTION 2 COMPANY DRAWING NUMBER: REVISION:
N/A 0
This document and all the information contained herein are the confidential and exclusive property of TechnipFMC,
and may not be reproduced, disclosed, or made public in any manner prior to express written authorization by TechnipFMC. ORIG. SIZE: A3 SCALE: N.T.S SHEET: 15 OF 20
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
ING
LI GHT IDENTIFICATION
G TO
CO RDIN URE
S
PIPE
SYMBOL
X AC FIXT STD
CAP
313
VIEW-X
A 20° 20° A
H=2.50m
ABOVE FLOOR
11 TRIMMER S/CTR
10 PAINTED STEEL PLATE TO FIX POLE S/CTR
9 HGDS "U" BOLT COMPLETE WITH NUT & WASHER S/CTR
C C
8 JUNCTION BOX S/CTR
7 FLAT BAR (SS400 WITH PAINTING) S/CTR
CASE - 1
OPTION-1 6 PVC BUSHING FOR CABLE PROTECTION S/CTR
5 PIPE CAP OR WELDING S/CTR
4 4 2" DIA SCHEDULE 40 HDGS PIPE S/CTR
3 HDGS 'U' BOLT TO SUIT HANDRAIL (PVC COATED STAINLESS STEEL 316L) S/CTR
10
2 LIGHTING CABLE S/CTR
1 FLUORESCENT LIGHTING FIXTURE COMPLETE WITH LAMPS S/CTR
8 ITEM MATERIAL DESCRIPTION SUPPLIED BY
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
IDENTIFICATION
SYMBOL
STD
314
A A
5 4 STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR
WILL PROVIDE APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
H=2.50m
ABOVE FLOOR 1 5. TRAY SUPPORT SPACING 2M (MAX.) & 0.3M FROM END.
C C
7 JUNCTION BOX S/CTR
6 CABLE SUPPORTS PAINTED STEEL S/CTR
5 LIGHTING CABLE S/CTR
4 LIGHTING FIXTURE SUPPORT SYSTEM PAINTED STEEL S/CTR
3 JB SUPPORT PAINTED STEEL S/CTR
2 SS316L BOLTING S/CTR
1 FLUORESCENT LIGHTING FIXTURE COMPLETE WITH LAMPS S/CTR
ITEM MATERIAL DESCRIPTION SUPPLIED BY
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
IDENTIFICATION
SYMBOL
HANDRAIL HANDRAIL
STD
318
7 7
A A
2 2
3
3
6
6 1 5 1
5 2
2
VIEW "B" VIEW "A" VIEW "A" NOTES :
~
TO LIGHTING TO LIGHTING 1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
CIRCUIT
~ CIRCUIT PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE
PLATFORM PLATFORM EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
WELDING FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
VIEW "C" REFER RESPECTIVE LIGHTING INSTALLATION LAYOUTS/3D-MODEL.
LIGHTING LAYOUT
APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
LIGHTING LAYOUT
SEE RELEVANT
B B
SEE RELEVANT
~
GRADE LEVEL
GRADE LEVEL
~
TO LIGHTING CIRCUIT 4 TO LIGHTING CIRCUIT 3. TRAY SUPPORT SPACING 2M (MAX.) & 0.3M FROM END.
4
BOLTED MOUNTING 4. CABLE ROUTING UP TO 2 CABLES WILL BE DONE USING OPEN CONDUITS (PROVIDED THAT IT'S
BOLTED MOUNTING OCCUPYING LESS THAN 35% AT THE CONDUIT). ROUTING WITH 3 CABLES OR MORE WILL BE DONE
CLAMPING WELDING
ARRANGEMENT USING CABLE TRAY .
ARRANGEMENT
5. SUITABLE WASHER WILL BE USED TO PREVENT GALVANIC CORROSION BETWEEN STAINLESS
STEEL / CABLE TRAY AND CARBON STEEL SUPPORT.
SECONDARY
STEEL ~ ~ COMPANY:
ENERGEAN ISRAEL LIMITED
TO LIGHTING PROJECT:
1 2 3 4 5 6
1 2 3 4 5 6
STANDARD
SECONDARY STEEL 300 (MAX) 2000 (MAX) IDENTIFICATION
WELD SYMBOL
6 STD
NOTES : 316
1. THE HEIGHT OF LIGHTING FIXTURE W.R.T. GRADE / PLATFORM IS SHOWN AS 2500mm IN THE
A PRESENT STANDARD. HOWEVER THIS ELEVATION WILL VARY SUBJECT TO ENVIRONMENT WHERE A
3 WELD
EACH LIGHTING FIXTURE WILL BE PLACED. THIS ELEVATION SHALL NEVER BE LESS THAN 2200mm
4 5 7
1 FROM FLOOR PLATFORM ELEVATION. FOR EXACT MOUNTING HEIGHT OF LIGHTING FIXTURES,
VARIABLE
8 2. STEEL PROFILES SHAPES AND SIZES ARE SHOWN FOR PRINCIPLE ONLY. S/CTR WILL PROVIDE
APPROPRIATE SUPPORTING SYSTEM FOLLOWING THIS PRINCIPLE.
SECONDARY PAINTED STEEL SUPPORT ALONG WITH MOUNTING PLATE SUITABLE FOR FIXTURE
3 MOUNTING C/W NUTS / BOLTS / WASHERS S/CTR
STEEL 2 4 1 5
WELD SECTION B - B SECTION B - B LIGHTING CABLE S/CTR
2
OPTION 3 OPTION 4
REFER NOTE-7 1 FLOOD LIGHT S/CTR
1 2 3 4 5 6
1 2 3 4 5 6
A A
SPARE
B B
C C
COMPANY:
ENERGEAN ISRAEL LIMITED
PROJECT:
1 2 3 4 5 6