YKL-APC - SDO.PKE-MII-001 - Mechanical Item Installation R1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

DRAWING FILE

NOTE
RECEIVING AREA WAREHOUSE AREA

1 ADDED DESCRIPTION 18.09.23


0 PRELIMINARY 20.03.23
REV DESCRIPTION DATE
CLIENT
APICAL GROUP
PT SARI DUMAI OLEO (SDO)

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
JOHOR, WEST MALAYSIA

SCALE N.T.S
DATE 18/09/2023 REV 1
DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
PROJECT TITLE
PROPOSED
PKE UNLOADING SYSTEM
120MT/HR

DRAWING NO.
YKL/APC-SDO-PKE/MII/001

DRAWING TITLE
MECHANICAL ITEM INSTALLATION

PROJECT NO. PAGE NO.


YKL 01/23 01/10
RECEIVING AREA DRAWING FILE

CODING Item No 20
Description Dust Collecting System NOTE
A DUST COLLECTING
kW 15
SYSTEM Qty 1
Remark:
1. To assembly and install ducting sets using bolts.
2. To install cyclone, fan & bag filter and to be fastened (using bolt) to plinth.
3. Position to suit dust collecting system plinth.

Retaining Plate 1 ADDED DESCRIPTION 18.09.23


0 PRELIMINARY 20.03.23
CODING Item No 1
REV DESCRIPTION DATE
Description Receiving Hopper
RECEIVING (L10m x W3m x H2.6m) CLIENT
kW ~ APICAL GROUP
HOPPER
Qty 1 PT SARI DUMAI OLEO (SDO)
Remark:
1. To assembly and install Receiving Hopper. All plate fully welded and base plate to be
fastened (using bolt) to footing. Position to suit base plate footing.
2. To assembly and install Dust Collection Box (L10000mm x W3688mm x H6000mm) and
handrail. All plate fully welded and frame base plate to be fastened (using bolt) to floor.
Copying utilization or handing over to third parties is
3. To fabricate at site retaining plate and support (approx. 10130mm x 1524mm x 980mm)
not permitted without the written consent of YKL
and install (bolt & weld). Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
To install conveyor walkway, handrail and staircase from floor to top of dust KAMPUNG PAYA PANJANG,
collection box. BUKIT PASIR, 84300 MUAR
- Walkway, handrail & staircase standard length: 6m JOHOR, WEST MALAYSIA
(walkway, handrail & staircase to cut & assemble (welding) to suit SCALE N.T.S
site condition). DATE 18/09/2023 REV 1
- Staircase base plate bolt to floor DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
PROJECT TITLE
PROPOSED
PKE UNLOADING SYSTEM
120MT/HR

DRAWING NO.
YKL/APC-SDO-PKE/MII/001

DRAWING TITLE
MECHANICAL ITEM INSTALLATION
A
PROJECT NO. PAGE NO.
YKL 01/23 02/10
RECEIVING AREA DRAWING FILE

NOTE

CODING Item No 4
Description Ø24” Palm Kernel Expeller Transfer Screw Conveyor
No 1 below Receiving Hopper
16.5 kW 7.5
Qty 1 1 ADDED DESCRIPTION 18.09.23
Remark: 0 PRELIMINARY 20.03.23
1. To assembly screw conveyor by using bolt and install into position. REV DESCRIPTION DATE
2. To install conveyor cover, chain coupling and motor. CLIENT
3. To install and welding conveyor stand (interval 6m). APICAL GROUP
4. To fabricate at site 1 unit conveyor outlet chute to Item No 6 PT SARI DUMAI OLEO (SDO)
(approx. 400mm x 600mm x 500mm) and install (welding).

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
CODING Item No 5
Engineering
Description Ø24” Palm Kernel Expeller Transfer Screw Conveyor
No 2 below Receiving Hopper
19.4 kW 7.5 YKL ENGINEERING SDN BHD
Qty 1 LOT 663, BATU 10,
Remark: KAMPUNG PAYA PANJANG,
1. To assembly screw conveyor by using bolt and install into position. BUKIT PASIR, 84300 MUAR
2. To install conveyor cover, motor base (to be fastened using bolt to floor), JOHOR, WEST MALAYSIA
sprocket, chain and motor.
SCALE N.T.S
3. To install and welding conveyor stand (interval 6m).
DATE 18/09/2023 REV 1
4. To fabricate at site 1 unit conveyor outlet chute to Item No 6 DRAWING BY SITI
(approx. 400mm x 600mm x 500mm) and install (welding). CHECKED BY TC ER
5. To fabricate at site 1 unit safety cover and support APPROVED BY HW WONG
(approx. 1700mm x 400mm x 200mm) and install (bolt & welding). PROJECT TITLE
PROPOSED
PKE UNLOADING SYSTEM
120MT/HR

DRAWING NO.
YKL/APC-SDO-PKE/MII/001

DRAWING TITLE
MECHANICAL ITEM INSTALLATION
To install conveyor walkway & handrail for Item No 7 & 8.
- Walkway & handrail standard length: 6m PROJECT NO. PAGE NO.
(walkway & handrail to cut & assemble (welding) to suit site condition)
YKL 01/23 03/10
RECEIVING AREA DRAWING FILE

CODING Item No 7 NOTE


Description Ø24” Palm Kernel Expeller Cross Screw
Conveyor No 1
Fan Cyclone B
7.4 kW 4
Filter Bag

Qty 1
Remark:
1. To assembly screw conveyor by using bolt and install into position.
2. To install conveyor cover, chain coupling and motor.
3. To install and welding conveyor stand (interval 6m).
4. To install (welding) 1 unit conveyor outlet chute (c/w rack & pinion) 1 ADDED DESCRIPTION 18.09.23
and to fabricate extend chute at site (approx. 600mm x 600mm x 0 PRELIMINARY 20.03.23
770mm) and install (welding) to Item No 10. REV DESCRIPTION DATE
5. To fabricate at site 1 unit conveyor outlet chute to Item No 9 CLIENT
(approx. 600mm x 600mm x 1250mm) and install (welding).
APICAL GROUP
PT SARI DUMAI OLEO (SDO)
CODING Item No 6
Description Palm Kernel Expeller Elevator
31.0 kW 22
Qty 2
Copying utilization or handing over to third parties is
Remark: not permitted without the written consent of YKL
1. To assembly and install elevator body, belt, bucket (using Engineering
bolt), drum, motor, sprocket, chain, plummer block & gear
reducer.
2. Elevator position to suit elevator plinth and elevator base YKL ENGINEERING SDN BHD
fully welded to the plinth structure. LOT 663, BATU 10,
3. To fabricate at site 2 units elevator chute to Item No 7 & 8. KAMPUNG PAYA PANJANG,
(approx. 540mm x 730mm x 1540mm) & install (welding). BUKIT PASIR, 84300 MUAR
4. To fabricate at site 2 units safety cover and support JOHOR, WEST MALAYSIA
(approx. 1870mm x 200mm x 500mm) and install (bolt &
SCALE N.T.S
welding). DATE 18/09/2023 REV 1
DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
PROJECT TITLE
CODING Item No 8
PROPOSED
Description Ø24” Palm Kernel Expeller Cross Screw
PKE UNLOADING SYSTEM
Conveyor No 2
9.4 kW 4 120MT/HR
Qty 1
Remark: DRAWING NO.
1. To assembly screw conveyor by using bolt and install into position. YKL/APC-SDO-PKE/MII/001
2. To install conveyor cover, chain coupling and motor.
3. To install and welding conveyor stand (interval 6m).
4. To install (welding) 1 unit conveyor outlet chute (c/w rack & pinion) DRAWING TITLE
and to fabricate extend chute at site (approx. 600mm x 600mm x MECHANICAL ITEM INSTALLATION
770mm) and install (welding) to Item No 10.
5. To fabricate at site 1 unit conveyor outlet chute to Item No 9 B PROJECT NO. PAGE NO.
(approx. 600mm x 600mm x 1250mm) and install (welding).
YKL 01/23 04/10
RECEIVING AREA DRAWING FILE
(VIEW A – A)

NOTE

CODING Item No 2 1 ADDED DESCRIPTION 18.09.23


Description Vibrator for Receiving Hopper 0 PRELIMINARY 20.03.23
VIBRATOR kW 0.37 REV DESCRIPTION DATE
Qty 8 CLIENT
Remark: APICAL GROUP
1. Vibrator to install (bolt) at Receiving Hopper and position to suit site PT SARI DUMAI OLEO (SDO)
condition.
2. Support to fabricate and install (welding) at site.

Discharge Chute

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
JOHOR, WEST MALAYSIA

SCALE N.T.S
DATE 18/09/2023 REV 1
DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
CODING Item No 3 PROJECT TITLE
VIBRATING Description Vibrating Feeder PROPOSED
kW 0.65 PKE UNLOADING SYSTEM
FEEDER Qty 8 120MT/HR
Remark:
1. Vibrating Feeder to install below Receiving Hopper chute and DRAWING NO.
to be support to receiving hopper (bolt & welding). YKL/APC-SDO-PKE/MII/001
2. To fabricate at site 8 units discharge chute to Item No 4 & 5
(approx. 920mm x 620mm x 670mm) and install. 1. To install conveyor walkway & handrail for Item No 4 & 5.
- Walkway & handrail standard length: 6m DRAWING TITLE
(walkway & handrail to cut & assemble (welding) to suit site condition) MECHANICAL ITEM INSTALLATION
2. Conveyor and walkway support to fabricate and install at site. Base plate to be
fastened (using bolt) to floor (to suit site condition).
PROJECT NO. PAGE NO.
YKL 01/23 05/10
RECEIVING AREA DRAWING FILE
(VIEW B – B)

1. To install walkway and staircase (staircase base plate bolt to floor) NOTE
2. To install handrail surround receiving pit (handrail bolt to floor)
- Walkway, handrail & staircase standard length: 6m
(walkway, handrail & staircase to cut & assemble (welding) to suit site condition).

1 ADDED DESCRIPTION 18.09.23


To cut Dust Collection Box plate (approx. 1200mm x 1200mm) 0 PRELIMINARY 20.03.23
to receive Ducting Reducer (welding). REV DESCRIPTION DATE
CLIENT
APICAL GROUP
PT SARI DUMAI OLEO (SDO)

Ducting Reducer
Copying utilization or handing over to third parties is
not permitted without the written consent of YKL
Dust Collection Box Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
Receiving Hopper JOHOR, WEST MALAYSIA
Dust Collecting System Plinth
SCALE N.T.S
DATE 18/09/2023 REV 1
DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
PROJECT TITLE
PROPOSED
Receiving Hopper Footing Receiving Pit PKE UNLOADING SYSTEM
120MT/HR

DRAWING NO.
Elevator Pit Elevator Plinth YKL/APC-SDO-PKE/MII/001

To install dust collecting saddle (welding)


DRAWING TITLE
MECHANICAL ITEM INSTALLATION

PROJECT NO. PAGE NO.


YKL 01/23 06/10
WAREHOUSE AREA DRAWING FILE

NOTE
To install conveyor walkway, staircase and handrail for Item No 9, 10, 11, 12, 13 & 14 Walkway and staircase support to fabricate
- Walkway, handrail & staircase standard length: 6m and install at site (to suit site condition).
(walkway, handrail & staircase to cut & assemble (welding) to suit site condition).

1 ADDED DESCRIPTION 18.09.23


0 PRELIMINARY 20.03.23
REV DESCRIPTION DATE
CLIENT
APICAL GROUP
PT SARI DUMAI OLEO (SDO)

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
JOHOR, WEST MALAYSIA

SCALE N.T.S
DATE 18/09/2023 REV 1

C DRAWING BY
CHECKED BY
SITI
TC ER
APPROVED BY HW WONG
PROJECT TITLE
CODING Item No 9 CODING Item No 10
PROPOSED
Description Ø24” Palm Kernel Expeller Transfer Screw Description Ø24” Palm Kernel Expeller Transfer Screw PKE UNLOADING SYSTEM
Conveyor No 1 Conveyor No 2 120MT/HR
26.6 kW 7.5 42.7 kW 11
Qty 1 Qty 1 DRAWING NO.
Remark: Remark: YKL/APC-SDO-PKE/MII/001
1. To assembly screw conveyor by using bolt and install into position. 1. To assembly screw conveyor by using bolt and install into position.
2. To install conveyor cover, chain coupling and motor. 2. To install conveyor cover, chain coupling and motor.
3. To install and welding conveyor stand (interval 6m). 3. To install and welding conveyor stand (interval 6m). DRAWING TITLE
4. To fabricate at site 1 unit conveyor outlet chute to Item No 13 4. To install (welding) 1 unit conveyor outlet chute (c/w rack & pinion) and MECHANICAL ITEM INSTALLATION
(approx. 600mm x 600mm x 1100mm) and install (welding). to fabricate extend chute at site (approx. 600mm x 600mm x 640mm)
and install (welding) to Item No 13.
5. To fabricate at site 1 unit conveyor outlet chute to Item No 11 (approx. PROJECT NO. PAGE NO.
600mm x 600mm x 1100mm) and install (welding).
YKL 01/23 07/10
WAREHOUSE AREA DRAWING FILE

CODING Item No 11 CODING Item No 12


Description Ø24” Palm Kernel Expeller Transfer Screw Conveyor Description Ø24” Palm Kernel Expeller Transfer Screw NOTE
Line A No 1 to Warehouse Conveyor Line A No 2 to Warehouse (Twin Drive)
42.3 kW 11
43.2 kW 11
Qty 1 Qty 2
Remark: Remark:
1. To assembly screw conveyor by using bolt and install into position. 1. To assembly screw conveyor by using bolt and install into position.
2. To install conveyor cover, chain coupling and motor. 2. To install conveyor cover, chain coupling and motor.
3. To install and welding conveyor stand (interval 6m). 3. To install and welding conveyor stand (interval 6m).
4. To install (welding) 5 units conveyor outlet chute (c/w rack & pinion) and 4. To install (welding) 11 units conveyor outlet chute (c/w rack & pinion)
to fabricate extend chute at site (approx. 600mm x 600mm x 415mm) and and to fabricate extend chute at site (approx. 600mm x 600mm x 90 mm)
and install (welding) to Item No 15. 1 ADDED DESCRIPTION 18.09.23
install (welding) to Item No 15.
0 PRELIMINARY 20.03.23
5. To fabricate at site 1 unit conveyor outlet chute to Item No 12 (approx. 5. To install (bolt & welding) 12 units Dust Suppression (Item No 15).
REV DESCRIPTION DATE
600mm x 600mm x 1170mm) and install (welding).
CLIENT
6. To install (bolt & welding) 5 units Dust Suppression (Item No 15).
APICAL GROUP
PT SARI DUMAI OLEO (SDO)

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
JOHOR, WEST MALAYSIA

SCALE N.T.S
DATE 18/09/2023 REV 1
DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
PROJECT TITLE
PROPOSED
PKE UNLOADING SYSTEM
120MT/HR

DRAWING NO.
YKL/APC-SDO-PKE/MII/001

DRAWING TITLE
MECHANICAL ITEM INSTALLATION

PROJECT NO. PAGE NO.


YKL 01/23 08/10
WAREHOUSE AREA DRAWING FILE

NOTE

1 ADDED DESCRIPTION 18.09.23


0 PRELIMINARY 20.03.23
REV DESCRIPTION DATE
CLIENT
APICAL GROUP
PT SARI DUMAI OLEO (SDO)

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
JOHOR, WEST MALAYSIA

CODING Item No 13 CODING Item No 14 SCALE N.T.S


Description Ø24” Palm Kernel Expeller Transfer Screw Conveyor Description Ø24” Palm Kernel Expeller Transfer Screw DATE 18/09/2023 REV 1
Line B No 1 to Warehouse Conveyor Line B No 2 to Warehouse (Twin Drive) DRAWING BY SITI
42.3 kW 11 43.2 kW 11
CHECKED BY TC ER
APPROVED BY HW WONG
Qty 1 Qty 2
PROJECT TITLE
Remark: Remark:
PROPOSED
1. To assembly screw conveyor by using bolt and install into position. 1. To assembly screw conveyor by using bolt and install into position.
2. To install conveyor cover, chain coupling and motor. 2. To install conveyor cover, chain coupling and motor. PKE UNLOADING SYSTEM
3. To install and welding conveyor stand (interval 6m). 3. To install and welding conveyor stand (interval 6m). 120MT/HR
4. To install (welding) 5 units conveyor outlet chute (c/w rack & pinion) and 4. To install (welding) 11 units conveyor outlet chute (c/w rack & pinion)
to fabricate extend chute at site (approx. 600mm x 600mm x 415mm) and and to fabricate extend chute at site (approx. 600mm x 600mm x 90 mm) DRAWING NO.
install (welding) to Item No 15. and install (welding) to Item No 15. YKL/APC-SDO-PKE/MII/001
5. To fabricate at site 1 unit conveyor outlet chute to Item No 14 (approx. 5. To install (bolt & welding) 12 units Dust Suppression (Item No 15).
600mm x 600mm x 1170mm) and install (welding).
6. To install (bolt & welding) 5 units Dust Suppression (Item No 15). DRAWING TITLE
MECHANICAL ITEM INSTALLATION

PROJECT NO. PAGE NO.


YKL 01/23 09/10
WAREHOUSE AREA DRAWING FILE
(VIEW C – C)

NOTE

CODING Item No 17
CODING Item No 15 Description Hot Spot Detection System
Description Dust Suppression Chute HOT SPOT
DUST kW ~
kW ~ DETECTION Qty 20
SUPPRESSION Qty 38 Remark:
Remark: 1. To install Hot Spot Detection (bolt).
1. To install (bolt & welding) 5 units at Item No 11. 2. Hot Spot Detection position to suit site condition.
2. To install (bolt & welding) 12 units at Item No 12. 1 ADDED DESCRIPTION 18.09.23
2. Support to fabricate and install (welding) at site (to suit site condition).
3. To install (bolt & welding) 5 units at Item No 13. 0 PRELIMINARY 20.03.23
4. To install (bolt & welding) 12 units at Item No 14. REV DESCRIPTION DATE
CLIENT
APICAL GROUP
PT SARI DUMAI OLEO (SDO)

Copying utilization or handing over to third parties is


not permitted without the written consent of YKL
Engineering

YKL ENGINEERING SDN BHD


LOT 663, BATU 10,
KAMPUNG PAYA PANJANG,
BUKIT PASIR, 84300 MUAR
JOHOR, WEST MALAYSIA

SCALE N.T.S
DATE 18/09/2023 REV 1
DRAWING BY SITI
CHECKED BY TC ER
APPROVED BY HW WONG
PROJECT TITLE
PROPOSED
PKE UNLOADING SYSTEM
120MT/HR
CODING Item No 16
Description Water Spray Pump DRAWING NO.
PUMP kW 5.5 YKL/APC-SDO-PKE/MII/001
Qty 2
Remark:
1. Pump position to suit site condition and fastened (using bolt) to floor/plinth. DRAWING TITLE
2. To lay piping from pump to Item No 9 & Item No 10 (approx. L123m). MECHANICAL ITEM INSTALLATION
(thread & welding)
3. To install valves and fitting.
4. To fabricate and install (welding) pipe support at site (to suit site condition). PROJECT NO. PAGE NO.
YKL 01/23 10/10