1.0 Purpose
The purpose PC Geotechnic Sdn Bhd produced safe operation procedure is committed to
eliminate, avoid and prevent the risk of incidents arising from bored pile work activity on part of
safety and health concern. This SOP also for:

1. To indicate a potential hazard for any individual are involved in this bored pile work
activity.
2. To review the hazard are involved during bored pile work activity.
3. To reduce hazard during bored pile work activity and up to date the requirement by
local authority

2.0 Scope
This safe operating procedure applies to all PC Geotechnic Sdn Bhd project site. The scope of
safety and health for this project to ensure all the piling work activity will conduct safely and
follow the safe operating procedure. Where statutory requirements are applicable, the more
stringent requirements shall take precedence.

3.0 Responsibilities
3.1 Sr. Site Manager/Site Manager
3.2 Safety & Health Manager/Officer/Supervisor
3.3 Site Supervisor
3.4 All workers

4.0 Potential hazards

1. Toppling or collapse of crane 8. Heat stress/ fatigue/ back pain injury

2. Failure or snapping of wire rope, 9. Struck by lightning


cable and, or hydraulic hose.
3. Struck by falling object due to loose 10. Fire hazard
fittings, bolts and, or nuts.
4. Caught between crushed 11. Falling objects
5. Overturning of machine or crane 12. Failure lifting gear
6. Rigging failures
7. Unauthorized person entering the
work zone

Page 2 of 5
SOP No. 03
SAFE OPERATING PROCEDURE
BORED PILE WORK ACTIVITY Revision 00

5.0 Procedure
5.1 Pre-operational

No. Description Person In Charge


All equipment and machineries must be inspected
Sr. Site Manager/Site
regularly for damage. Equipment found to be in these
1 Manager/Safety
conditions must be replaced immediately and not re-
Manager
used.
Bored pile work activity procedures must comply with Sr. Site Manager/Site
2 safe practices and with the requirements of the law and Manager/Safety
governmental regulations. Manager
If work will be conducted at night, ensure there is Site Manager/Site
3
sufficient lighting. Supervisor
Ensure sufficient supervision while the work is carried
5 SHO/Site Supervisor
out.

5.2 Operational
5.2.1 Position of Bored Pile

No. Description Person In Charge


Sr. Site Manager/Site
1 Toolbox briefing discuss on activity. Manager/Safety
Manager
Workers to wear appropriate PPE (safety helmet, safety Site Supervisor/All
2 shoes, gloves, high visibility vest, ear muff/ear plug). workers
To have well organized communication between the Site
3 work supervisor and the machinery operator Supervisor/Machinery
operator
4 Daily machineries inspection by operator with checklist. Machinery operator
Close supervision by work supervisor. Operator and
5 Supervisor to ensure the ground condition along the Site Supervisor/All
access route is safe workers

Work supervisor to plan the location of machinery Site Supervisor/All


6 mobilization. workers
Workers must stay far from working area during
machineries movement and remain visible. Provide
7 banksman to control machinery movement at congested Site Supervisor/All
area. Banks man shall have whistle and flag to control workers
the movement.
Steel plate to be provided under machinery track where Site Supervisor/All
8 necessary. workers
Page 3 of 5
SOP No. 03
SAFE OPERATING PROCEDURE
BORED PILE WORK ACTIVITY Revision 00

5.2.2 Installation of casing

No. Description Person In Charge


Close supervision by work supervisor. Operator and
1 Supervisor to ensure the ground condition along the Operator / Supervisor
access route is safe
Conduct lifting gear inspection before work
2 commencement. Provide certificate of lifting gear. Site Supervisor/Operator

Lifting using tagline (minimum 5m length). Provide Site Supervisor/All


3 warning signage (lifting in progress) workers
Cordoned off work area. Site Supervisor/All
4
workers
5 Lifting supervisor should supervise of lifting activity Lifting supervisor

6 Provide warning signage. Site Supervisor/SSS

5.2.3 Drilling of Bored Pile

No. Description Person In Charge


Apply PTW before start work and ensure before start work has Site Supervisor/SSS/All
1 toolbox to all workers involved. workers
Operator and supervisor to ensure the ground condition
2 of Bored rig is safe Site Supervisor/Operator

Operator do not leave the cabin during concreting work


3 and ensure machine is turn off when operator leave the Site Supervisor/Operator
machine.

4 Bored rig should be stand on firm ground Site Supervisor/Operator


To have well organized communication between the
5 work supervisor and the machinery operator Site Supervisor/Operator

Wearing of earplug/earmuff is compulsory during pile Site Supervisor/All


6 installation workers
Workers must stay far from working area during
machineries movement and remain visible. Provide
7 banksman to control machinery movement at congested Site Supervisor/All
area. Banks man shall have whistle and flag to control workers
the movement.
Provide warning signage (Bored Pile work in progress)
8 and Cordoned off work area. Site Supervisor/SSS

9 Daily machineries inspection by operator with checklist. Site Supervisor/Operator

Page 4 of 5
SOP No. 03
SAFE OPERATING PROCEDURE
BORED PILE WORK ACTIVITY Revision 00

Only authorised workers are involved of this work


10 activity Operator/all workers

5.2.4 Installation of Steel Cage.

No. Description Person In Charge


Lifting using tagline (minimum 5m length). Provide Site Supervisor/All
1 warning signage (lifting in progress) workers
To provide whistle/walkie talkie for helper, operator and
2 rigger as a communication medium Site Supervisor/Operator

Workers must stay far from working area during


machineries movement and remain visible. Provide
3 banksman to control machinery movement at congested Site Supervisor/All
area. Banks man shall have whistle and flag to control workers
the movement.

Cordoned off work area and provide signage Site Supervisor/All


4
workers

5.2.5 Concreting of Bored Pile

No. Description Person In Charge


Operator do not leave the cabin during concreting work
1 and ensure machine is turn off when operator leave the Site Supervisor/Operator
machine.
Ensure the helper is aware the hand placement during
2 concreting activity. Site Supervisor/Operator

Workers shall be wearing appropriate PPE during


3 exposed with concrete ( such as: latex hand glove, yellow Site Supervisor/All
boot, apron) workers

Provide banksman to control machinery movement at


4 congested area and traffic. Banks man shall have whistle Site Supervisor/All
and flag to control the movement. workers

Page 5 of 5
SOP No. 03
SAFE OPERATING PROCEDURE
BORED PILE WORK ACTIVITY Revision 00

5.2.6 Extraction of Casing

Close supervision by work supervisor. Operator and


1 Supervisor to ensure the ground condition along the Operator / Supervisor
access route is safe
Conduct lifting gear inspection before work
2 commencement. Provide certificate of lifting gear. Site Supervisor/Operator

Lifting using tagline (minimum 5m length). Provide Site Supervisor/All


3 warning signage (lifting in progress) workers
Cordoned off work area. Site Supervisor/All
4
workers
5 Lifting supervisor should supervise of lifting activity Lifting supervisor

6 Provide warning signage. Site Supervisor/SSS

PREPARED BY, VERIFIRED BY,

………………………………………… ……………………………………….
(SYAZWANI RAHIM) (NIZAL YUSOF)
SAFETY EXECUTIVE SHE MANAGER