Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Owner/

LIFTING CAPACITY FOR :


SANY SCC6500A (650 ton C/C)

126M
0m

21965
HJDB
0
T
15
1970
16
18 124 Detail - A
Manufacturer / :
20 106
22 92.7
24 81.2
26 71.6
28 63.4 g
in
30 56.4 fill
ck
32 50.3 ba
al
on ea

TS4
34 45 ti ar
di ng
36 40.3 ad ki
g r
38 36.1 irin wo
e qu a ne
e ar cr
Ar ain
M

Installation Contractor/
TS3

00
R260
105000

Drawing status/

R3
0 00
LAYOUT FOR UNLOADING MATERIAL
0
FOR INSTALLATION
TS2

ea INSTALLATION PERMIT
ar
g
in
w er
lo
box
ar
Ge
Project Name/
Dai Phong Wind Farm Project
TS1

SANY
SCC6
500A

Project Location/
Thien Nghiep Commune, Mui Ne Ward, Phan Thiet Ci

Drawing Title/
g
in Installation Gearbox at WTG02
ill
ckf
26000 l ba
na
tio Civil Engineer:
di
SCC6500A / Configuration: HJDB ad Notes \
SCC6500A 40.0T Gearbox ng
uiri All dimensions are in millimeters, all weights & capacities are
Electrical Engineer:
eq in tonnes unless otherwise specified.
Load Case 1 2 3
Boom Config / C ear 1

1.
Ar
Main Boom Length/ 126m 3. 1. Round sling x 2pcs 3. Increase trimmer x 2 sets Draw by/
Minimum pressure capacity of the ground for main crane:
Crane Parameters 2 25Ton/m2 PHAM TIEN DAT
Jib Length/ 0m 2. 2. Shackle x 2pcs
4. 4. Shackle x 2pcs
m Hook Block / Crane working & traveling area to be kept free from any Check by/
Radius 30.0 26.0 26.0 5. 5. Lifting Anchor Point x 2pcs construction and obstruction.
3 VU HUNG THAI
Load Chart Capacity HB Weight / 4.75t
t 56.4 75.5 75.5
Drawing Revison/
Load Parameters Max wind speed for lifting: 08m/s
4

Load / t 40.0 40.0 40.0

Tackle / t 0.5 0.5 0.5


t 4.8 4.8 4.8 A 25/02/2023 First Submission/
Hook Block /
t Sheet/ Trang Total sheet/
Total Load / 45.25 45.25 45.25 3 3
Safety Calculation
Date/ 25/02/2023
Safety factor
80.23 59.93 59.93 Dwg No/ PLC-DP-V150-WTG02-0003