REHABILITATION AND UPGRADATION TO 22-LANE LANE WITH

PAVED SHOULDERS CONFIGURATION OF GONDIGUDA


TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480
TO KM 51.772) OF NH
NH-516
516 E IN THE STATE OF ANDHRA
PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PR PROJECT (GNHCP) WITH THE LOAN
ASSISTANCE OF WORLD BANK ON EPC MODE
(COS MINOR BRIDGE AT GRADE JUNCTION KM 157.8)

SUBMITTED TO

M/s SRC INFRA DEVELOPERS PVT LTD


2A, 2ND FLOOR, SYCON POLARIS
8TH MAIN RMV EXTENSION
SADASHIV NAGAR, BENGALURU
BENGALURU-80

M/s. KDM ENGINEERS (INDIA) PRIVATE LIMITED


OFFICE: Plot No
No-93, E-Block,
Block, Autonagar, Visakhapatnam

Email: mrk@kdmengineers.com & gtvskp@kdmengineers.com

Ph No: 9912944495 & 9912922255


NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO
2-LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA)
SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN
NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON
EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM 157.8)

TABLE OF CONTENTS
1. INTRODUCTION

1.1 Project Description


1.2 Purpose of Study
1.3 Index of Report
2. FIELD INVESTIGATION
2.1 Soil Boring
2.2 Standard Penetration Tests
2.3 Rotary Core Drilling
2.4 Sampling
2.5 Measurement of water level
2.6 Details of Borehole
3. LABORATORY TESTS
4. VARIABILITY SUBSURFACE CONDITION
5. ANALYSIS OF STRATUM
6. ABSTRACT OF SBC
7. ABSTRACT OF ROCK RESULT
8. RECOMMENDATION.
9. CLOSURE
APPENDIX
Field Bore log
Laboratory Test Data Summary
Calculation of SBC and Settlement
Site Photograph
Location Map
Calculation of Silt Factor
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)

1.0 Introduction
1.1 Project Description
M/s SRC Infra Developers Pvt Ltd has proposed to carry out soil investigations and field testing for
the Project “Rehabilitation and Up gradation to 2-lane with paved shoulders configuration of Gondiguda
to Araku (up to Bhallaguda) section (Km 27.480 to Km 51.772) of NH-516 E in the state of Andhra Pradesh
under Green National Highways Corridor Project (GNHCP) with the Loan Assistance of World Bank on
EPC Mode (COS Minor Bridge at A Grade Junction km 157.8)”.
KDM Engineers (India) Pvt. Ltd. was entrusted with the task of carrying out soil exploration, field
testing and reporting of key findings of Ground Investigation.
1.2 Purpose of Study
The overall purpose of this study is to conduct a geotechnical investigation to assess the SBC for
foundation design for the above project. To accomplish these purposes the study was conducted in the
following phases:
 Drilling of 03 boreholes BH-3(P-1), BH-4(A-2) and BH-5(A-1).
 Testing samples in laboratory to determine the engineering properties of the strata.
 Analyzing all field and laboratory data to develop preliminary geotechnical recommendations for
foundations
1.3 Index of the report
The initial sections of this report presents brief descriptions of above project site the field work
along with list of various laboratory tests conducted. This is followed by bore-wise presentation and
the recommendations and report concludes with a summary of the principal findings and
recommendations. All field and laboratory data is presented in the appendix Bore Hole Wise.
2.0 Field Investigation
2.1 Boring/Sampling:
Different types of explorations, borings are the most practical and relatively correct method of obtaining
sub-surface information. The bore hole 150 mm diameter was sunk as per specifications and IS: 1892
and was extended up to 10.0m depth (Maximum depth of Exploration). Casings as required were used to
retain the borehole. The borehole was progressed using Rotary drilling machine.
2.2 Standard Penetration Tests:
Standard Penetration Tests ( SPT ) were conducted in the boreholes at every 1.5m depth by connecting
the split spoon sampler to SPT rod and driving it by 45 cm using 63.5 kg hammer falling freely from a
height of 75 cm . The tests were conducted in accordance with IS 2131 – 1981.
The number of blows for each 15 cm of penetration of the split spoon sampler was recorded. The
number of blows required to penetrate the initial 15 cm of the split spoon is ignored for seating the
sampler due to possible presence of loose materials or cutting from the drilling operation. The
cumulative number of blows required to penetrate the balance 30 cm out of 45 cm is termed as the SPT
or N values. The N values are presented on the soil profile for each borehole up to the Refusal and
stopped for further boring into the refusal; the refusal can be considered when the N value exceeds 50
blows for 30 cm penetration. Standard Penetration Test ( SPT ) are conducted in the boreholes at 1.5 m
depth intervals by connecting the split spoon sampler to SPT rod and driving it by 45 cm using a 63.5 kg
hammer falling freely from a height of 75 cm . The test was conducted in accordance with IS 2131 –
1981.
1|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)
2.3 Rotary core drilling:
Conventional diamond core drilling equipment was used for drilling vertical holes up to specified depth
at each location. Rotary core drilling in rock was carried out according to IS 1892-1979. This drilling
technique was regarded as the most satisfactory method of assessing the character of rock formation,
which lies at depth below the ground surface. Specimens of rock in the form of cylindrical cores were
recovered from the drill hole by means of a core barrel. Double barrel technique was adopted according
to field condition. The core barrel was provided at its lower end with a detachable shoe or core bit,
which is of diamond. All rotary core bits were of NX (75mm) size.

2.4 Sampling:
The details of these bore holes including field of Standard Penetration and also collection of disturbed
soil samples are given in Bore Logs enclosed , labeled properly, disturbed & SPT representative samples
of sub-surface deposits were collected from bore holes, labeled depth wise and placed in polythene bags.
Reference Numbers and depth of these samples are shown in Bore Log Data Sheets.
Cores recovered from hard strata were arranged in a core box with proper leveling and identification
mark. From the rock strata core recovery {CR% = (Length of Core /Length of run) x 100} & rock
quality designation (RQD) = (total length of core pieces of more than 100mm /length of run) x 100}
were computed for every drilling run. Summary of CR and RQD in different boreholes is presented.
Depth and details of the sample are shown in the borehole logs (Annexure).

2.5 Measurement of Water Level:


Depth of level of water was noted when struck in. This is termed as depth of observed water level below
existing ground level (EGL). Depth of standing water (SWL) below EGL after 24 hours of removal of
casing was also noted. Standing water level was not encountered during the progress of soil exploration
in all the Boreholes. However ground water table effect may be taken for design purpose as
indicated in IS 6403:1981.

2|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)
2.6 Details of Bore holes:

BH Depth BH Bore Hole Coordinates Commenced Completed


CH OGL
No. (m) RL on on
X Y
BH-3 0157.8 906.204 906.204 698086.035 2027040.882
10.0 10.03.2024 12.03.2024
(P-1)
BH-4 0182.8 906.264 906.264 698109.007 2027050.746
9.0 12.03.2024 15.03.2024
(A-2)
BH-5 0132.8 907.669 907.669 698063.064 2027031.018
8.0 12.03.2024 15.03.2024
(A-1)

3.0 Laboratory Testing:


For proper identification and classification of the sub-surface and for deriving adequate information
regarding its relevant physical and geotechnical properties at the site under investigation, the following
laboratory tests were conducted on the soil samples collected from the bore holes.

Sl. No. Tests Relevant IS Codes


Soil
1 Grain size analysis IS:2720(part-4)
2 Atterberg’s limits IS:2720(part-5)
3 Specific gravity IS: 2720(part-3)
4 Free swell Index IS: 2720(part-40)
Rock
5 Unconfined Compressive strength IS:9143

Results of all tests are furnished in Annexure of this report

3|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)

4.0 VARIABILITY IN SUBSURFACE CONDITIONS


Subsurface conditions encountered during construction may vary somewhat from the conditions
encountered during the site investigation. In case significant variations are encountered during
construction, we request to be notified so that our engineers may review the recommendations in this
report in light of these variations.

5.0 Analysis of Strata:


At BH-3 (P-1):-

In this location from ground level to 1.5m depth Dense compacted SDR strata is present followed by
rock strata up to 10.0m depth (Maximum Depth of exploration) whose core recovery varies from 14% to
50% and RQD varies from Nil to 30%

At BH-4 (A-2):-

In this location from ground level to 1.5m depth Dense compacted SDR strata is present followed by
rock strata up to 9.0m depth (Maximum Depth of exploration) whose core recovery varies from 20% to
75% and RQD varies from Nil to 74%

At BH-5 (A-1):-

In this location from ground level to 1.5m depth Low compressible clay strata is present followed by a
Dense compacted SDR strata present up to 3.0m depth followed by rock strata up to 8.0m depth
(Maximum Depth of exploration) whose core recovery varies from 27% to 50% and RQD varies from
Nil to 32%

4|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)

6.0 Abstract of SBC :

Allowable
Bearing
Borehole Depth
SL SPT N Foundation NSBC Settleme Pressure Recommended
No/Chainage Below Type Of Strata
No Value Size (m) (t/m2) nt (mm) (t/m2) for ABP (t/m2)
No GL
50mm
settlement

BH-3 1.5 >100 SDR 109.0 90.0 60.5 60.0


6.0m x
1 (P-1)
6.0m
0+157.8 3.0 >100 Rock 166.0 --- --- 166.0

1.5 >100 SDR 109.0 90.0 60.5 60.0


BH-4
6.0m x
2 A-2 3.0 >100 166.0 --- --- 166.0
6.0m
0+182.8 Rock
4.0 >100 207.0 --- --- 207.0
Low
BH-5 1.5 22 Compressible 22.6 83.0 13.58 13.0
Clay 6.0m x
3 A-1
6.0m
0+132.8 3.0 >100 SDR 166.0 124.0 66.9 66.0

 The SPT N Value 100 has been restricted to 50 for calculation of SBC and Settlement in
soil and SDR.
 As Per IS 12070 Clause No 7.1 where the rock is of Low strength and has discontinuities at
a very close spacing, or is weathered or fragmented, it is common practice in such cases to
consider the rock as a granular mass and to design the foundation on the basis of
conventional soil mechanics that’s why the SBC calculation has been done by considering
SPT N value as greater than 100.
 For BH-3 (P-1) at 3.0m depth and For BH-4(A-2) at 3.0m and 4.0m depth because of
unavailability of rock core samples for UCS the SBC has been calculated by considering as
Granular mass and assuming the SPT N value as greater than 100.

5|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

7.0 Abstract of Rock Result:

Allowable Bearing
Unconfined Compressive Density in Point Load Index in Classification of Rock as per UCS
S.No BH N0 Depth in m Pressure as per IS
Strength in N/mm2 kg/m3 N/mm2 (AS Per IS 4464-2020)
12070 (T/m2)

1 1.5m to 3.0m ---- 2656 2.1 ---


---

2 3.0m to 4.0m ---- 2662 6.2 ---


---

3 4.0m to 5.0m 60.96 2765 --- 228.6


Strong

4 BH-3 5.0m to 6.0m 69.35 2786 --- 260.1


Strong

5 (P-1) 6.0m to 7.0m --- 2664 7.8 ---


---

6 7.0m to 8.0m 42.45 2731 --- 159.2


Medium Strong

7 8.0m to 9.0m --- 2668 8.5 ----


---

8 9.0m to 10.0m 43.39 2747 --- 162.7


Medium Strong

9 1.5m to 3.0m ---- 2666 8.2 ---


BH-4 ----
(A-2)
10 3.0m to 4.0m ---- 2671 13.2 ----
----

6|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

Allowable Bearing
Unconfined Compressive Density in Point Load Index in Classification of Rock as per UCS
S.No BH N0 Depth in m 2 3 2
Pressure as per IS
Strength in N/mm kg/m N/mm
12070 (T/m2) (AS Per IS 4464-2020)

11 4.0m to 5.0m ---- 2675 15.3 ---


---

12 5.0m to 6.0m 37.45 2688 --- 140.4


Medium Strong
BH-4
13 6.0m to 7.0m 41.20 2727 --- 154.5
(A-2) Medium Strong

14 7.0m to 8.0m 59.28 2766 --- 222.3


Strong

15 8.0m to 9.0m 89.63 2802 --- 336.1


Strong

17 3.0m to 4.0m ---- 2660 5.3 ----


---

18 4.0m to 5.0m 79.19 2797 --- 297.0


Strong
BH-5
19 5.0m to 6.0m 64.15 2769 --- 240.6
(A-1) Strong

20 6.0m to 7.0m 65.94 2783 --- 247.3


Strong

21 7.0m to 8.0m 58.10 2755 --- 217.9


Strong

7|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)
Note: 1. As per IS 9143-1979,Cl No.3.3 (a) the Unconfined Compressive Strength test of the Rock
Samples has been Carried out by taking a Core Size of L/D Ratio 1:1 and While Calculating the
Unconfined Compressive Strength of the Rock samples the required Correction factor has been
adopted.

2. For BH-3 (P-1) at 1.5m, 3.0m, 6.0m, 8.0m, for BH-4(A-2) at 1.5m, 3.0m, 4.0m and for BH-5 (A-
1) at 3.0m depth we didn’t got the required core size for conducting the UCS that’s why Point
Load Index test has been done for those samples.
3.For BH-3(P-1) at 4.0m, 5.0m, 7.0m and 9.0m for BH-4 (A-2) at 5.0m, 6.0m, 7.0m and 8.0m and
for BH-5 (A-1) at 4.0m, 5.0m, 6.0m and 7.0m depth the SBC calculation has been done as per IS
12070 by taking the UCS of the rock sample (Refer Appendix – Calculation of SBC and
Settlement)

8|Page
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)

8.0Recommendations:
1. Based upon the Soil investigation and Laboratory test results we have arrived at the following
Conclusions:-
a) The soil Investigation has been done for Major Bridge.
b) For BH-3 (P-1) and BH-5 (A-1) an Open Foundation can be recommended at a depth of 4.0m
with Safe Bearing Capacity of 80 T/m2 by taking an embedment depth of 1.5m into the
Rock.
c) For BH4 (A-2) an Open Foundation can be recommended at a depth of 5.0m with Safe
Bearing Capacity of 80 T/m2 by taking an embedment depth of 1.5m into the Rock.
d) . The Footings for open foundation to be connected by tie beams.
2. The above calculation and recommendations are based on borehole data and if any major variations
are observed during foundation excavation, suitable decisions are to be taken.

Safety precautions:

1. Proper drainage system should be provided for this site.

2. As Araku is coming under Zone-II seismic zone, safety precaution should be taken for earthquake
resistant as per IS: 1893.

3. This general recommendation is not structure-specific and the designer is at liberty to decide the
depth and the type of foundation intended basing on the sub-soil characteristics made available in this
report.

9.0 CLOSURE
We appreciate the opportunity to perform this investigation for you and have pleasure in
submitting this report. Please contact us when we can be of further service to you.

FOR KDM ENGINEERS (INDIA) PRIVATE LIMITED


KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)
9|Page

APPENDIX

10 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE
AT GRADE JUNCTION KM 157.8)
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

FIELD BORE LOG


REHABILITATION AND UP-GRADATION OF 2-LANE WITH PAVED SHOULDERS CONFIGURATION OFGONDIGUDA TO ARAKU (UP TO
M/s. KDM Engineers (India) Pvt. Ltd. BHALLAGUDA) SECTION (KM 27+480 TO KM 51+772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL CLIENT: SRC Infra Developers Pvt Ltd.
HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE

Borehole: BH-03 Borehole Dia: 100 mm/Nx R.L 906.204 Samples No.s

Location: Pier-1 Commenced On: 10.03.2024 G.W.T 1.0 Undisturbed 0

Chainage: 0+157.8 Completed On: 12.03.2024 Tests No.s Disturbed 1

Type of Structure: - Termination Depth (m): 10.0 SPT 1 Core 8

Standard Penetration Test (SPT)


Depth of Drilling (m) Sample
Strata
Sl. No. Date Test Conducted No. of Blows for Penetration Depth of Strata Description Collection CR (%) RQD (%) Remarks
N Value Symbol
at (m) Penetration (cm) Type
From To 0-15cm 15-30cm 30-45cm

1 10.03.2024 0.0 1.5 1.5 >50 >50 >50 >100 3 SDR SPT - - SPT Collected

2 11.03.2024 1.5 3.0 - - - - - - Rock Core 14 - Core Collected

3 11.03.2024 3.0 4.0 - - - - - - Rock Core 30 - Core Collected

4 11.03.2024 4.0 5.0 - - - - - - Rock Core 35 27 Core Collected

5 11.03.2024 5.0 6.0 - - - - - - Rock Core 50 30 Core Collected

6 12.03.2024 6.0 7.0 - - - - - - Rock Core 20 - Core Collected

7 12.03.2024 7.0 8.0 - - - - - - Rock Core 35 30 Core Collected

8 12.03.2024 8.0 9.0 - - - - - - Rock Core 20 - Core Collected

9 12.03.2024 9.0 10.0 - - - - - - Rock Core 40 29 Core Collected

Description: DS - Disturbed Sample CR - Core Recovery RQD - Rock Quality Designation SPT - Standard Penetration Test R.L - Reduced Level G.W.T - Ground Water Table

11 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

REHABILITATION AND UP-GRADATION OF 2-LANE WITH PAVED SHOULDERS CONFIGURATION OFGONDIGUDA TO ARAKU (UP TO
M/s. KDM Engineers (India) Pvt. Ltd. BHALLAGUDA) SECTION (KM 27+480 TO KM 51+772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL CLIENT: SRC Infra Developers Pvt Ltd.
HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE

Borehole: BH-04 Borehole Dia: 100 mm/Nx R.L 906.264 Samples No.s

Location: A-2 Commenced On: 12.03.2024 G.W.T - Undisturbed 0

Chainage: 0+182.8 Completed On: 15.03.2024 Tests No.s Disturbed 1

Type of Structure: - Termination Depth (m): 9.0 SPT 1 Core 7

Standard Penetration Test (SPT)


Depth of Drilling (m) Sample
Strata
Sl. No. Date Test Conducted No. of Blows for Penetration Depth of Strata Description Collection CR (%) RQD (%) Remarks
N Value Symbol
at (m) Penetration (cm) Type
From To 0-15cm 15-30cm 30-45cm

1 12.03.2024 0.0 1.5 1.5 >50 >50 >50 >100 3 SDR SPT - - SPT Collected

2 12.03.2024 1.5 3.0 - - - - - - Rock Core 20 - Core Collected

3 13.03.2024 3.0 4.0 - - - - - - Rock Core 20 - Core Collected

4 13.03.2024 4.0 5.0 - - - - - - Rock Core 25 - Core Collected

5 13.03.2024 5.0 6.0 - - - - - - Rock Core 28 25 Core Collected

6 14.03.2024 6.0 7.0 - - - - - - Rock Core 75 74 Core Collected

7 14.03.2024 7.0 8.0 - - - - - - Rock Core 25 14 Core Collected

8 15.03.2024 8.0 9.0 - - - - - - Rock Core 50 50 Core Collected

Description: DS - Disturbed Sample CR - Core Recovery RQD - Rock Quality Designation SPT - Standard Penetration Test R.L - Reduced Level G.W.T - Ground Water Table

12 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

REHABILITATION AND UP-GRADATION OF 2-LANE WITH PAVED SHOULDERS CONFIGURATION OFGONDIGUDA TO ARAKU (UP TO
M/s. KDM Engineers (India) Pvt. Ltd. BHALLAGUDA) SECTION (KM 27+480 TO KM 51+772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL CLIENT: SRC Infra Developers Pvt Ltd.
HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE

Borehole: BH-05 Borehole Dia: 100 mm/Nx R.L 907.669 Samples No.s

Location: A-1 Commenced On: 12.03.2024 G.W.T - Undisturbed 0

Chainage: 0+132.8 Completed On: 15.03.2024 Tests No.s Disturbed 2

Type of Structure: - Termination Depth (m): 8.0 SPT 1 Core 5

Standard Penetration Test (SPT)


Depth of Drilling (m) Sample
Strata
Sl. No. Date Test Conducted No. of Blows for Penetration Depth of Strata Description Collection CR (%) RQD (%) Remarks
N Value Symbol
at (m) Penetration (cm) Type
From To 0-15cm 15-30cm 30-45cm

1 12.03.2024 0.0 1.5 1.5 7 10 12 22 45 Low Compressible Clay SPT - - SPT Collected

2 13.03.2024 1.5 3.0 3.0 >50 >50 >50 >100 2 SDR DS - - DS Collected

3 13.03.2024 3.0 4.0 - - - - - - Rock Core 30 - Core Collected

4 13.03.2024 4.0 5.0 - - - - - - Rock Core 27 22 Core Collected

5 14.03.2024 5.0 6.0 - - - - - - Rock Core 32 32 Core Collected

6 14.03.2024 6.0 7.0 - - - - - - Rock Core 44 30 Core Collected

7 15.03.2024 7.0 8.0 - - - - - - Rock Core 50 30 Core Collected

Description: DS - Disturbed Sample CR - Core Recovery RQD - Rock Quality Designation SPT - Standard Penetration Test R.L - Reduced Level G.W.T - Ground Water Table

13 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

LABORATORY TEST DATA SUMMARY

14 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

15 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH
UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT
GRADE JUNCTION KM 157.8)

16 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-


LANE WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION
(KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE

CALCULATION OF SBC AND SETTLEMENT

17 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

18 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-03 at depth 4.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 60.96
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 609.6 kg/cm²

qs = qc x 0.25= 152.4 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
30.48 kg/cm²
304.8 t/m2
Taking a water reduction factor of 0.75,
2
The Allowable Bearing Capacity = 228.6 t/m

19 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-03 at depth 5.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 69.35
The safe bearing capacity is calculated using the following equation.
qs =qcN j
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 693.5 kg/cm²

qs = qc x 0.25= 173.4 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
34.68 kg/cm²
346.8 t/m2

Taking a water reduction factor of 0.75,


2
The Allowable Bearing Capacity = 260.1 t/m

20| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-03 at depth 7.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 42.45
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 424.5 kg/cm²

qs = qc x 0.25= 106.1 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
21.23 kg/cm²
212.3 t/m2
Taking a water reduction factor of 0.75,
2
The Allowable Bearing Capacity = 159.2 t/m

21| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-03 at depth 9.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 43.39
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 433.9 kg/cm²

qs = qc x 0.25= 108.5 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
21.7 kg/cm²
2
217 t/m
Taking a water reduction factor of 0.75,
2
The Allowable Bearing Capacity = 162.7 t/m

22| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

23 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

24| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Calculation of Safe Bearing Capacity from Standard Penetration Test at Depth 4.0m of BH-4 (A-2)
Soil Investigation Data

Site Information
1 Bore Hole No BH-04 (A-2)
2 Depth of Sample Collection Df 4.0 m
o
3 Inclination of load to the vertical a 0

Laboratory Investigations
1 Standard Penetration Value from Field = 50 SPT
Corrections as per Cl. 3.6. of IS 2131:1981
a) Due to Overburden 0.400 kg / cm2 50.00 Cohesionless Soil Factor = 1.000
2
Overburden presuure = q =(g' D)/1000 = 0.400 kg / cm
b) Due to Dilatancy N 50.00 Strata below Water Table=Other than Fine Sand & Silt
2 Angle of Internal Friction f 41.0 o Ref: Fig.1 of IS 6403: 1981
3 Specific Gravity of Soil G 2.62
3
4 Submerged Density of Soil g' 1.000 gm/cm

Assumptions
1 Width of Foundation B 600 cm
2 Depth of Foundation below Ground level Df 400 cm
3 Length of Foundation L 600 cm
4 Shape of Base Square
Effect of Water Table W' 0.5
5 Factor of Safety for Sand 3

Calculations
3
Submerged Density of Soil g' 1.000 gm/cm
o
f 41
Nf 4.815
2
Surcharge Intensity = q = g' D / 1000 0.400 kg/cm
o
Bearing Capacity Factors for f 41 Shape Factors Depth Factors Inclination Factors

Nq 78.336 sq 1.200 dq 1.1460 iq 1.0000


Ng 141.880 sg 0.800 dg 1.1460 ig 1.0000
Ultimate Net Bearing Capacity qd = q (N q - 1) s q d q i q + ½ B g N g s g d g i g W'
= 0.400 x ( 78.336 - 1) x 1.200 x 1.146 x 1.000
+ ½ x 600.0 x 0.001 x 141.880 x 0.800 x 1.146 x 1.000 x 0.500 / 1000
= 42.541 + 19.5113
2
Ultimate Net Bearing Capacity qd = 62.0523 kg/cm
Net Safe Bearing Capacity (NSBC)= 207 T/m2

25 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-04 at depth 5.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 37.45
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 374.5 kg/cm²

qs = qc x 0.25= 93.63 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
18.73 kg/cm²
187.3 t/m2

Taking a water reduction factor of 0.75,


2
The Allowable Bearing Capacity = 140.4 t/m

26 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-04 at depth 6.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 41.20
The safe bearing capacity is calculated using the following equation.
qs =qcN j
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 412 kg/cm²

qs = qc x 0.25= 103 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
20.6 kg/cm²
2
206 t/m
Taking a water reduction factor of 0.75,
2
The Allowable Bearing Capacity = 154.5 t/m

27| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-04 at depth 7.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 59.28
The safe bearing capacity is calculated using the following equation.
qs =qcN j
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 592.8 kg/cm²

qs = qc x 0.25= 148.2 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
29.64 kg/cm²
296.4 t/m2

Taking a water reduction factor of 0.75,


2
The Allowable Bearing Capacity = 222.3 t/m

28| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-04 at depth 8.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 89.63
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 896.3 kg/cm²

qs = qc x 0.25= 224.1 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
44.82 kg/cm²
448.2 t/m2

Taking a water reduction factor of 0.75,


2
The Allowable Bearing Capacity = 336.1 t/m

29| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

30 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

31 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-05 at depth 4.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 79.19
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 791.9 kg/cm²

qs = qc x 0.25= 198 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
39.6 kg/cm²
2
396 t/m
Taking a water reduction factor of 0.75,
2
The Allowable Bearing Capacity = 297 t/m

32 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-05 at depth 5.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 64.15
The safe bearing capacity is calculated using the following equation.
qs =qcNj
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 641.5 kg/cm²

qs = qc x 0.25= 160.4 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
32.08 kg/cm²
320.8 t/m2
Taking a water reduction factor of 0.75,
2
The Allowable Bearing Capacity = 240.6 t/m

33 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-05 at depth 6.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 65.94
The safe bearing capacity is calculated using the following equation.
qs =qcN j
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 659.4 kg/cm²

qs = qc x 0.25= 164.9 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
32.97 kg/cm²
329.7 t/m2

Taking a water reduction factor of 0.75,


2
The Allowable Bearing Capacity = 247.3 t/m

34| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

Rock Sample SBC Calculation for BH-05 at depth 7.0m:


The Bearing Capacity is calculated using the Uniaxial Compressive Strength of Rock Cores
(IS: 12070-1987) UCS 58.10
The safe bearing capacity is calculated using the following equation.
qs =qcN j
Where qs = Safe bearing capacity with a factor of safety of 3
qc = Average Uniaxial compressive strength of rock cores

Nj = Empirical coefficient depending on the spacing of


discontinuities. For the range of RQD value, this coefficient is
taken as 0.25 assuming the joint spacing of 1 m- 3 m.

Minimum uniaxial compressive strength, qc = 581 kg/cm²

qs = qc x 0.25= 145.3 kg/cm²

Taking a conservative factor of safety of 5 to account for settlements,


The allowable bearing capacity = qs/5
29.05 kg/cm²
290.5 t/m2

Taking a water reduction factor of 0.75,


2
The Allowable Bearing Capacity = 217.9 t/m

35| P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

36 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

37 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

38 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO
KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
(GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
157.8)

39 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

BILITATION AND UPGRADATION TO 2-LANE


NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHAL LAGUDA) SECTION (KM 27.480 TO
BHALLAGUDA)
516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
KM 51.772) OF NH-516
OAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
(GNHCP) WITH THE LOAN
157.8)

SITE PHOTOGRAPHS

BOREHOLE-03
40 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

BILITATION AND UPGRADATION TO 2-LANE


NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHAL LAGUDA) SECTION (KM 27.480 TO
BHALLAGUDA)
516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
KM 51.772) OF NH-516
OAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
(GNHCP) WITH THE LOAN
157.8)

BOREHOLE-04

41 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

BILITATION AND UPGRADATION TO 2-LANE


NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION
WITH PAVED SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHAL LAGUDA) SECTION (KM 27.480 TO
BHALLAGUDA)
516 E IN THE STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT
KM 51.772) OF NH-516
OAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS MINOR BRIDGE AT GRADE JUNCTION KM
(GNHCP) WITH THE LOAN
157.8)

BOREHOLE-05

42 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED
SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA)
BHAL SECTION (KM 27.480 TO KM 51.772) OF NH-516
NH E IN THE
STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF
WORLD BANK ON EPC MODE

LOCATION MAP

43 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED
SHOULDERS CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE
STATE OF ANDHRA PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF
WORLD BANK ON EPC MODE

SILT FACTOR CALCULATION


Location : BH-03 (P1)

Sampled at (m) : 1.500


Date of Testing : - Actual Wt Taken
Weight of Sample Taken (g) : 91.00 91.00 0.000000
Wt. Of Sample retained on 0.075mm Sieve (g) : 80.00
Wt. Of Sample Passing through 0.075mm Sieve (g) : 11.00

Cumulative
I.S Sieve Weight of Soil Cumulative Wt.of Cumulative Percentage
Percentage retained
Designation (mm) retained (g) Soil retained (g) Passing (%)
(%)
20.000 0.00 0.00 0.00 100.00
10.000 0.00 0.00 0.00 100.00
4.750 37.00 37.00 40.66 59.34 Sieve Size(mm)Wt Retained(g) Avg. sieve Size (%) Retained ( C) x (D)
2.000 14.00 51.00 56.04 43.96 (A) (B) ( C) (D) (E)
0.425 15.00 66.00 72.53 27.47 20.000 0.00 20.000 0.00 0.000
0.075 14.00 80.00 87.91 12.09 10.000 0.00 15.000 0.00 0.000
4.750 37.00 7.375 40.66 299.863
2.000 14.00 3.375 15.38 51.923
0.425 15.00 0.803 16.48 13.228
Grain Size Distribution Curve
0.075 14.00 0.250 15.38 3.846
Clay Silt FS MS CS Gravel
0.000 0.00 0.0375 0.00 0.000
100 395.069
90 Weighted mean Diameter 3.951
Percent Finer by Weight

80
SILT FACTOR 3.50
70
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000

Diameter in (mm)

Silt Factor = 3.498234908

Percentage of :
D60= 4.84
1. Gravel (+4.75mm) = 40.66 40.66 D30= 0.67
2. Coarse sand (4.75-2.00mm) = 15.38 D10= 0.06
3. Medium sand (2.0-0.425mm) = 16.48 47.25
4. Fine sand (0.425-0.075mm) = 15.38
5. Fines (- 0.075mm) = 12.09 12.09

44 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA
PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS
MINOR BRIDGE AT GRADE JUNCTION KM 157.8)
Location : BH-04 (A2)
Sampled at (m) : 1.500
Date of Testing : - Actual Wt Taken
Weight of Sample Taken (g) : 50.00 50.00 0.000000
Wt. Of Sample retained on 0.075mm Sieve (g) : 26.00
Wt. Of Sample Passing through 0.075mm Sieve (g) : 24.00

Cumulative
I.S Sieve Weight of Soil Cumulative Wt.of Cumulative Percentage
Percentage retained
Designation (mm) retained (g) Soil retained (g) Passing (%)
(%)
20.000 0.00 0.00 0.00 100.00
10.000 0.00 0.00 0.00 100.00
4.750 4.00 4.00 8.00 92.00 Sieve Size(mm)Wt Retained(g) Avg. sieve Size (%) Retained ( C) x (D)
2.000 2.00 6.00 12.00 88.00 (A) (B) ( C) (D) (E)
0.425 11.00 17.00 34.00 66.00 20.000 0.00 20.000 0.00 0.000
0.075 9.00 26.00 52.00 48.00 10.000 0.00 15.000 0.00 0.000
4.750 4.00 7.375 8.00 59.000
2.000 2.00 3.375 4.00 13.500
0.425 11.00 0.803 22.00 17.655
Grain Size Distribution Curve 0.075 9.00 0.250 18.00 4.500
Clay Silt FS MS CS Gravel
0.000 0.00 0.0375 0.00 0.000
129.635
100 Weighted mean Diameter 1.296
90
SILT FACTOR 2.00
Percent Finer by Weight

80
70
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter in (mm)

Silt Factor = 2.003889658

Percentage of :
D60= 0.31
1. Gravel (+4.75mm) = 8.00 8.00 D30= 0.05
2. Coarse sand (4.75-2.00mm) = 4.00 D10= 0.02
3. Medium sand (2.0-0.425mm) = 22.00 44.00
4. Fine sand (0.425-0.075mm) = 18.00
5. Fines (- 0.075mm) = 48.00 48.00

45 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA
PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS
MINOR BRIDGE AT GRADE JUNCTION KM 157.8)
Location : BH-05 (A1)
Sampled at (m) : 1.500
Date of Testing : Actual Wt Taken
Weight of Sample Taken (g) : 195.00 195.00 0.000000
Wt. Of Sample retained on 0.075mm Sieve (g) : 50.00
Wt. Of Sample Passing through 0.075mm Sieve (g) : 145.00

Cumulative
I.S Sieve Weight of Soil Cumulative Wt.of Cumulative Percentage
Percentage retained
Designation (mm) retained (g) Soil retained (g) Passing (%)
(%)
20.000 0.00 0.00 0.00 100.00
10.000 0.00 0.00 0.00 100.00
4.750 0.00 0.00 0.00 100.00 Sieve Size(mm)Wt Retained(g) Avg. sieve Size (%) Retained ( C) x (D)
2.000 2.00 2.00 1.03 98.97 (A) (B) ( C) (D) (E)
0.425 7.00 9.00 4.62 95.38 20.000 0.00 20.000 0.00 0.000
0.075 41.00 50.00 25.64 74.36 10.000 0.00 15.000 0.00 0.000
4.750 0.00 7.375 0.00 0.000
2.000 2.00 3.375 1.03 3.462
0.425 7.00 0.803 3.59 2.881
Grain Size Distribution Curve
0.075 41.00 0.250 21.03 5.256
Clay Silt FS MS CS Gravel
0.000 0.00 0.0375 0.00 0.000
17.306
100 Weighted mean Diameter 0.173
90
SILT FACTOR 0.73
Percent Finer by Weight

80
70
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter in (mm)

Silt Factor = 0.73217714

Percentage of :
D60= 0.06
1. Gravel (+4.75mm) = 0.00 0.00 D30= 0.03
2. Coarse sand (4.75-2.00mm) = 1.03 D10= 0.01
3. Medium sand (2.0-0.425mm) = 3.59 25.64
4. Fine sand (0.425-0.075mm) = 21.03
5. Fines (- 0.075mm) = 74.36 74.36

46 | P a g e
KDM ENGINEERS (INDIA) PVT.LTD.

NAME OF WORK- GEOTECHNICAL INVESTIGATION REPORT FOR REHABILITATION AND UPGRADATION TO 2-LANE WITH PAVED SHOULDERS
CONFIGURATION OF GONDIGUDA TO ARAKU (UP TO BHALLAGUDA) SECTION (KM 27.480 TO KM 51.772) OF NH-516 E IN THE STATE OF ANDHRA
PRADESH UNDER GREEN NATIONAL HIGHWAYS CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE (COS
MINOR BRIDGE AT GRADE JUNCTION KM 157.8)
Location : BH-05 (A1)
Sampled at (m) : 3.000
Date of Testing : - Actual Wt Taken
Weight of Sample Taken (g) : 122.00 122.00 0.000000
Wt. Of Sample retained on 0.075mm Sieve (g) : 109.00
Wt. Of Sample Passing through 0.075mm Sieve (g) : 13.00

Cumulative
I.S Sieve Weight of Soil Cumulative Wt.of Cumulative Percentage
Percentage retained
Designation (mm) retained (g) Soil retained (g) Passing (%)
(%)
20.000 0.00 0.00 0.00 100.00
10.000 0.00 0.00 0.00 100.00
4.750 42.00 42.00 34.43 65.57 Sieve Size(mm)Wt Retained(g) Avg. sieve Size (%) Retained ( C) x (D)
2.000 14.00 56.00 45.90 54.10 (A) (B) ( C) (D) (E)
0.425 44.00 100.00 81.97 18.03 20.000 0.00 20.000 0.00 0.000
0.075 9.00 109.00 89.34 10.66 10.000 0.00 15.000 0.00 0.000
4.750 42.00 7.375 34.43 253.893
2.000 14.00 3.375 11.48 38.730
0.425 44.00 0.803 36.07 28.943
Grain Size Distribution Curve 7.38
0.075 9.00 0.250 1.844
Clay Silt FS MS CS Gravel
0.000 0.00 0.0375 0.00 0.000
380.754
100 Weighted mean Diameter 3.808
90
SILT FACTOR 3.43
Percent Finer by Weight

80
70
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter in (mm)

Silt Factor = 3.434274152

Percentage of :
D60= 3.41
1. Gravel (+4.75mm) = 34.43 34.43 D30= 0.95
2. Coarse sand (4.75-2.00mm) = 11.48 D10= 0.07
3. Medium sand (2.0-0.425mm) = 36.07 54.92
4. Fine sand (0.425-0.075mm) = 7.38
5. Fines (- 0.075mm) = 10.66 10.66

47 | P a g e