Chennai Metro Phase ||

Project˖ DZ1040 Ring˖ 86

Begin time˖ 1/11/2024 10:09:45 PM End time˖ 1/12/2024 3:19:45 AM Page˖ 1/4

Work efficiency:

Advance : 99 Min Ring Building: 102 Min Standby time: 110 Min Total : 311 Min

Cutter Wheel: Avg Max Min


Speed[rpm]: 1.6 1.7 1.1

Torque[kNm]: 1782 2363 697

Rolling[mm]: 6 16 -4

Thrust: Avg Max Min

Thrust[kN] : 16188 17441 2663

Speed[mm/min] : 12 19 1

Penetration[mm/r] : 7.6 12.3 0.6

Thrust cylinder:
Avg(bar) Max(bar) Min(bar)

Group A
69 76 47
Group B
75 91 57
Group C

Group D 179 195 76

0 Avg pressure(bar)
400 171 187 81

2300

0 A B C D A B C D A B C D

Min stroke(mm) Max stroke(mm) Accumulate stroke(mm)


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 86

Begin time˖ 1/11/2024 10:09:45 PM End time˖ 1/12/2024 3:19:45 AM Page˖ 2/4

Articulation cylinder:
200 200

0 0
A B C D A B C D
Min stroke(mm) Max stroke(mm)
Avg Max Min
Contact Forcr(kN): 9401 14422 3592

Grout Injection: AVG(bar) Max(bar) Min(bar) Vol(L/Line) Total(L)


1 1 4.9 -0.2 1400.0 5000.0

2 1.7 5.7 -0.2 1200.0


1# Liquid
A 3 1.6 5.8 0.2 1000
2#
4 1.1 4.9 -0.4 1400.0
3# 1.7 5.8 1 140.0 490.0
1
4# 2 1.5 5.6 0.3 120.0
Liquid
B 3 1.7 6.2 0.8 90.0
0
4 1.4 6 0.4 90.0
Avg pressure at Ports 25
Total(A And B) 5490.0 L

Earth Pressure(Excavation Chamber): Avg(bar) Max(bar) Min(bar)


1.9 2.2 1.5
1#
1.7 1.9 1.4
2#
2.1 2.5 1.7
3#
4# 2 2.3 1.6
5# 2.1 3.2 1.2
6#
1.9 2.9 1.1

0 Avg pressure(bar) 6 Total:


Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 86

Begin time˖ 1/11/2024 10:09:45 PM End time˖ 1/12/2024 3:19:45 AM Page˖ 3/4

Screw Conveyor: Avg Max Min


Speed[rpm]: 4 6 0

Pressure[bar]: 47 57 26
Torque[KNm]: 11 16 0

Front(Bar) Center(Bar) Rear(Bar)


Earth Pressure Sensor(AVG):

Tail skin grease:


1 2 3 4 5 6 7 8

Front 52 34 34 41 19 33 34 36

Rear 51 33 34 60 26 9 30 45

Front 283 Impluses Total Weight: 140.3 kg

Rear 288 Impluses Total pulses: 571 Impluses

Foam:
Avg pressure(bar) Max pressure(bar) Min pressure(bar) Sum air(m³)Litres Sum liquid(m³)Litres

1 3.4 6.9 2.2 0 0.21

2 2.7 6.7 1.4 0.1 0.91

3 2.8 5.2 2 4.4 2.14

4 2.6 3.8 1.8 14.8 2.1

5 2.4 3.4 1.8 20.3 2.15

6 2.1 3.2 1.1 23.7 2.15

Foam concentrate : 129 L polymers: 0 L


Water : 0 L Bentonite : 0 L
Chennai Metro Phase ||
Project˖ DZ1040 Ring˖ 86

Begin time˖ 1/11/2024 10:09:45 PM End time˖ 1/12/2024 3:19:45 AM Page˖ 4/4

Grease: EP2: HBW:


Impluses 5.68 Kg
Outer Seal : 4734
Impulses HBW: 2496 Impluses

Screw Conveyor: 626 Impluses 1.5 Kg 1248


Total Weight of HBW: Kg
Rotary Joint : 209 Impluses 0.42 Kg
Articulation joint : 0 Impluses 0 Kg
Erector Bearing: 0 Impluses 0 Kg
Erector Wheel: 0 Impluses 0 Kg

Total Weight of EP2: 8.22 Kg Total Impluses of EP2: 35 Impluses

Gas Measuring: Avg Max Min


Methane Gad(CH4) : 0 0 0

Hydrogen sulfide(H2S) : 0 0 0
Carbon Monoxide(CO): 0.1 5.8 0

Oxygen(O2): 19.2 20.4 18.3