RISK ASSESSMENT

INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

RISK LEVEL ACTION AND TIMESCALE


TRIVIAL Insignificant Risk, no action is required.
(1)
ACCEPTABLE Largely acceptable, subject to reviews periodically or after significant changes etc. Consideration maybe given to a more cost effective
(2) solution or improvement that imposes little or no additional cost burden.
MODERATE Medium Risk, Efforts shall be made to mitigate the risk. Risk should only be tolerated for the short term, and then only whilst further control
(3-4) measures to mitigate the risk are being planned and introduced, and these within a pre-defined time period. However, the costs of prevention
should be carefully measured.
Where the moderate risk is associated with extremely harmful consequences, further assessment maybe necessary to establish more
precisely the likelihood of harm, this as a basis for determining the need for improved control measures.
SUBSTANTIAL Work activities shall not be started until the risk has been mitigated. Significant resources may have to be allocated to mitigate the risk. Where
(5-6) the risk involves work in progress, urgent action should be taken.
UNACCEPTABLE Work should not be started or continued until the risk has been mitigated. If it is not possible to mitigate risk even with unlimited resources, the
(9) work should remain prohibited.

Likelihood (probability) Consequences (impact)

3. Likely 3. Extremely harmful

Page 1 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

2. Unlikely 2. Harmful

1. Highly unlikely 1. Slightly harmful

Risk Level Before Risk Level After


Who Might be Control Control
S/No Activity Hazard/Risk Control measures Action By
harm
L Sv R L Sv R
Trip
Foreman
hazards )scattered 2 Remove unnecessary materials and keep the area clean
1 2 1 1 1 Supervisor
materials, gravels,
1. Survey Setting Out pieces of rock etc)
All workers
involved Foreman
Protruding steels 2 2 2 Remove protruding steels or provide rebar caps 1 2 2 Supervisor

Operators must be trained and certifield by 3rd party


All workers
Collision with vehicles Traffic plan, signs, information at induction, lighting, suitable Foreman
Involved
and equipment such 2 4 entrance/exit points 1 2 2 Supervisor
as trucks and earth 2 Physical separation between pedestrians and vehicles, jersy Operators
moving equipment barriers and warning tapes including signboards to be installed

Page 2 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Banksman/Flagman must be provided and shall be trained as per


Site Clearing QCS 2014
2. Operation
All workers Foreman
involved 2 4 1 2 2 Supervisor
Unauthorized access 2 Fences or barriers around site with appropriate signs and lighting
Safety officer
General public
Suitable safety footwear should be worn Foreman
All workers
Slips, Trips and Fall 2 Regular cleaning and clearing of waste Supervisor
Involved 2 4 1 2 2
Provision of temporary paths Equipment
Suitable lighting provided for workers carried out at night time supervisor
Contact with overhead 2 4 Contact owner to arrange examination of locations of services 1 2 2 Project
All workers
and underground including site survey using available drawings, and location devices Engineer
Involved
services such as (cable detentions) Foreman
electric power lines, Ensure that all relevant work permit required are obtained prior to Supervisor
water lines and the execution of the activity Safety officer
telecom services The power supply must be disconnected before working on the line
(follow Lock-out Tag-out procedure)
2 Test the line to ensurethat it is not energized before work
commence
As built drawing must be obtained as reference along with a single
line diagram to determine the locations and correct circuit to Lock-
out/Tag-out.
Arrange for disconnection and where necessary purging/draining

Page 3 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

down
Avoid direct contact with bird, bat or snake
All workers
Encountering Wildlife 2 If you come across wildlife, remain calm.
Involved
during site clearing
Do not try to remove or kill any pest/wildlife found on site; Always
Operation which may
consult a qualified pest-removal expert.
result in Swelling, mild
or severe allergic Always walk, don’t run. Running away from wildlife screams “prey.”
reactions from stinging You could also trip and injure yourself if you take off running in a
insects Serious injury panic.
or death Do not swat at or make fast movements around stinging insects, Foreman
most bees and wasps will not sting unless they are provoked or Supervisor
2 4 1 2 2
startled. Safety Officer
First Aiders
Destroy standing water for mosquitoes
If you are allergic to bee or wasp stings, please notify your
Supervisor.
Use insect repellant to reduce the chance of receiving insect bites.
Keep a first aid kit on site.
Wear the appropriate clothing for your work environment to reduce
tick and other insect bites.
Underground services 3 9 PTW must be obtained prior the excavation works 1 3 3 Foreman
3
All workers - gas, electricity or Underground testing must be carried out to identify underground Supervisor
Excavation of involved water utilities. Safety officer

Page 4 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Trenches (Manual) Falling materials or Ground conditions established by a survey to identify the type of
3 plant ground in which the excavation is to be carried out; means of
Falls of persons trench support confirmed upon completion of trial holes
Collapse of sides Remember that even work in shallow trenches can be dangerous.
Weakening of adjacent You may need to provide support if the work involves bending or
structures Noise kneeling in the trench. No one should be in the trench unless it is
safe to be there.
Where possible ensure that all water sources are turned off before
entering an excavation .
Do not store spoil or other materials close to the sides of
excavations. The spoil may fall into the excavation and the extra
loading will make the sides more prone to collapse Plant and
materials kept away from the side of excavations to prevent undue
pressure or ingress of exhaust fumes.
If there is a risk of water ingress, suitable methods and/or
equipment provided to either prevent the entry of water or to
remove water, e.g. water pumps
If plant could fall into the excavation, baulks or earth bunds should
Where excavations are dug next to structures, suitable preventative
measures established in case of collapse, subsidence or damage
Inspections of excavations carried out prior to each shift, after any
event likely to affect strength or stability be provided
Suitable personal protective equipment [PPE]
The location of electric cables, drains, gas and water mains etc. will

Page 5 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

be determined and marked prior to the commencement work


Excavations or openings will be properly sloped or shored at all
times.
Warning lamps must be used during hours of darkness or low
visibility.
Excavations or openings in floors must be properly fenced at all
times.
During excavation work the surrounding areas must be maintained
in an orderly and tidy condition.
Where vehicles have to tip materials into excavations, stop blocks
can be used to prevent them from over-running.
Safe means of access will be provided to excavations.
Flooded trenches should be "de-watered" as quickly as possible.
Once emptied the trench is to be fully inspected prior to entry.
Appropriate safety equipment will be used when necessary
Unskilled operators Plant Operators MUST be competent & Hold Current licence of
Mechanical
using plant Equipment. Plant being operated.
Excavation
Falling materials- Operator MUST NOT overload Truck with material –preventing
Operations using:
Operators. Overloading of materials falling off vehicle. Foreman
4 Materials into Tipper 2 3 6 Segregation- Both people &Plant SHALL be segregated using 1 3 3 Supervisor
Excavator Labours
Trucks- barriers or post & Tape.
Tipper trucks Supervisors
unstable/unsafe Communication-ALL person shall be briefed Via STARRT
Loading Materials
Persons being struck TALK/Tool Box Talk of the Hazards & of the controls-Keeping clear
into Trucks.
by falling Objects of plant Machines.

Page 6 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Banks man- Banks man SHALL be appointed- controlling vehicle


(materials)-Head
movement & preventing persons entering danger area- operations.
injuries.
PPE- ALL persons SHALL wear the required Safety P.P>E- Hard
Hats/Safety Boots etc.
Excavations / Work areas shall be closed off at all times using
Plastic Barriers. Foreman
People falling into Signage - pergola to place appropriate signage's at place of work - Supervisor
Excavation - Slip / notifying General Public, i.e. Men at Work / Danger Deep Safety officer
Trips & Falls… Excavation - KEEP OUT etc.
Excavations / Edge Workers Broken Bones to Safe Access / Egress shall be provided – allowing site persons to
5 Protection / Access / Equipment Upper & Lower 2 3 6 walk safely without causing injuries. 1 3 3
Egress. Body Parts / Cuts & All Safety P.P.E to be worn.
Abrasions / Head Housekeeping – Good Housekeeping shall be maintained
Injuries. preventing Slip / Trip & Falls.
Access / Egress – Suitable Steps or Ladders with landing platform
shall be provided allowing safe access into excavations - Provide
suitable entry / exit point.
Collapse of the If the depth of excavation is more than 1.2m, shoring should be
excavation provided against slips and collapse
Cave-in Shoring system must be properly designed and approved by the
6 Shoring Installation Injury 2 3 6 consutant prior installation. 1 3 Foreman
Tripping harzards All shoring system must be assembled and installed in accordance Supervisor
Workers Possible of death with the site specific method statement. 3 Safety officer
Ensure all support work is secure and that props and other

Page 7 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

materials are tight.


Ensure that all hanging steel or other support means are in place
as specified in shoring design.
All shoring system must be checked regularly and maintained
properly for the duration of work. Check for visible damage, over
stress and leakage.
Provide adequate access and egress to the excavated area.
Prevent equipment moving close to the edge of the excavation.

Page 8 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Entrapment due to fall/ Vehicles should never be overloaded. Loads should be evenly
roll of pipe. Operators distributed, secured and not protruding beyond the sides or back of
direct field of vision the vehicle.
obscured by load Reverse beeper, flashing beacon,and or mirrors fitted
leading to contact with Heavy duty gloves to be worn by operatives handling skids. All
other persons or plant. engines guards and covers to be in position and secured.
Displacement of load Windows, lights, mirrors and camera lens to be kept clean at all
Unloading and times . Foreman
All workers in Person being struck by
7 Laying of Pipes 3 2 6 Warning signs will be erected to alert pedestrians of Unloading 1 2 2 Supervisor
volved suspended pipe
sleeves Operations. Safety officer
causing serious injury
of harm. Defective Traffic management must be in place where loading/unloading is
and broken skids being carried out on public roads. Loads to be tipped only on
causing crushing of suitably level ground to prevent overturning of skip
limbs of entrapment of Encourage team lifting of pipes
body parts. Manual Workers to wear Hi Visibility Vests at all times and Hard-Hats
Handling.
8. Manual Handling Workers Ligament strains. 3 6 Full training and instruction provided in both induction and STARRT 1 2 3 Foreman
2
Muscle strains. briefing Supervisor
Fatigue. Abdominal Mechanical aids used wherever possible Safety officer
hernias. Workers adhere to guideline weights & to only lift what they are
Prolapsed/herniated able to lift
discs. Assess the load Weights marked on all loads.
Paralysis. Lift smaller loads. Cutting pipes to length

Page 9 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Mandatory PPE must be worn


Collision with plant or Consultation to occur with the local authority; appropriate permits
Labours
traffic obtained & appropriate controls implemented
Supervisors Traffic Accidents. Traffic management plan in accordance with Site approved TMP
Operators Inadequate Traffic SC-C20-CAG-PCG-HSE-AD-0003. Rev 1
Project
Public Management Correct signing/coning/barriers in place for all roadwork’s and path
Engineer
Working on or near Arrangements work
9 3 3 9 1 3 3 Foreman
roads, Misleading signs Longitudinal & size safety zones in place
Supervisor
Close proximity of the Where there is two way traffic, repeat the procedure for traffic going
Safety officer
public. in the opposite direction
Hard hats; Hi-visibility clothing & steel toe capped boots must be
worn at all times
Safe access must be provided for vehicles, plant and persons
Electrical shock. Train personnel only shall be allowed to use a
All workers
Tripping over or particular type of power tool.
involved
cutting power cord All electrical power tools shall be double insulated
Injury from flying bits Inspect cord before use. Keep power cord away from work area.
Cutting or Asphalt Foreman
of Material. Plug tools into GFCI protected outlets. Do not use electric tools if
using Power tools Supervisor
10 . 2 3 6 work area is wet. 1 3 3
such as Drilling and Safety officer
Back strain Power tools shall be 110v cable used with industrial type male and
cutting machine
Drill or saw catching; female connector.
drill bit breaking; Only power tools with handles or guards shall be used at the site.
severe lacerations; Keep tools in good condition. Inspect tools before use. Verify that
Dismemberment. guards work properly. Do not put hands near blades. When using

Page 10 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Dust inhalation tools, make sure you have a good center of gravity and are
Noise hazard properly balanced. Hold tools securely with two hands to maintain
control.
Position yourself properly when pushing the die handle.
Appropriate PPE such as diusk mask and ear plug shall be worn
while using power tool.
Start briefing talk shall be conducted before the start of the Job.
Foreman
Cuts, pinches, Keep tools in good condition. Inspect tools before use. Ear safety
Supervisor
11 Use of Hand tools Labours smashes, Punctures, 2 2 4 glasses. Work away from yourself. Use normal caution required for 1 2 2
Safety officer
severing of fingers. all hand tools.
Supervisor Wear hard hat. Handle tools carefully with dry gloves or hands.
12. Movement & Plant  Movement of Plant 3 6 Site Plant & Equipment / vehicles to keep away from all 1 3 3 Project
Labours
operating and vehicles - falling excavations. Engineer
Supervisors into excavations. All persons should keep a 10m safe distance away from Trencher Foreman
Operators  Untrained Plant during operation. Supervisor
Operators. ONLY Authorised Competent Plant Operators with valid Licence All concerned
 Poor Visibility 2 shall operate Plant Equipment.
 Material Falling from Movement of Plant Equipment SHALL be controlled vehicle
Heights. Banksman at ALL TIMES – Especially Reversing Operations.
 Reversing Plant & Equipment shall be maintained – pre- start checks.
Operations. Plant & Equipment to Maintained – 12 Monthly examination
 Persons Crushed certificates.
Reduce Speed when operating Plant Equipment on site.
 Environmental.
Trucks are not to be overloaded – persons in a safe place.

Page 11 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

Plant & People shall be segregated – Operations planned.


Fuelling up of Plant & Equipment shall be controlled using a Pump
– pumping into Suitable approved Containers – Care is to be taken
when filling – NEVER overfill!!
Report / Clean up Spills immediately.
Hot weather, humidity, Site staff to regularly inform site persons of the temperature when it
sand storms where is increasingly getting hotter. Via Daily STARRT Talks & Tool Box
Working in adverse workers will be Talks.
weather condition exposed to heat 2 Method statement/Risk assessment shall be communicated.
All Concerned
13. related illness (i.e heat Provision of adequate cool drinking water stations enable them to
Foreman
stroke/stress). Eye keep hydrated.
Supervisor
injury. Respiratory 3 6 Water Thermos filled with cool water/filled regularly. 1 3 3
Safety officer
illness. Provide suitable rest area. Means Shelters/Shading.
Frequent breaks – alternating work with other person.
All site staff/Operatives shall look out for each other showing sign
of heat stress symptoms.
If any signs of illness, report immediately to supervisor/First aider
Periodic training will be conducted for heat related disorders
Wet Weather-Rainy 3 6 Avoid working in rainy condition. 1 3 3 Foreman
where workers are Stop the excavation works and come out of the excavation area. Supervisor
being expose to cold Do not use electrical tools and equipment that are not specifically Safety officer
stress: risk of rated for outdoor use when working in the rain. When using hand
hypothermia, frostbite, tools, use tools with textured, nonslip grip handles.
slippery and fall and Make sure that you can be seen. If working in an area where there

Page 12 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

2 is vehicular traffic (trucks, cars, forklifts, etc.), always wear bright-


colored, reflective vests or rain gear, even during the day.
Do not wear rain gear or vests that have become worn and are dull
and/or no longer reflective.
Wear appropriate footwear. Footwear for use in inclement weather
should have deep treads to help prevent slipping
Dust-if inhaled may Maintain good housekeeping on regular basis
Labour Foreman
cause respiratory Proper arrangement of materials, tools & Equipment shall be at
Supervisor
Supervisor related ailments and 1 2 2 proper place 1 2 2
All Concerned
eye irritation Wear face mask, Safety glasses, restrict access to location
Other workers Waste skips shall be provided at the designated areas.
14. Housekeeping in the area
Slip/Fall hazards – Ensure that housekeeping operation are done on a daily basis
Foreman
caused by water used 2 leaving the premises clean & tidy, free from any obstructions such
Supervisor
in cleaning the area 3 6 as material, tools and equipment lift in the middle of work area 1 3 3
Labour
dried up
Do not leave tools/equipment on site.

SIGNATURE DATE:
Prepared by HSE Manager
Michael Adeyemo Designation 25th June, 2020
Name

Page 13 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites

MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020

SIGNATURE DATE
Reviewed By
Designation
Name

Page 14 of 14

You might also like