RA For ROAD WORKS - EXCAVATION AND PIPES INSTALLATION
RA For ROAD WORKS - EXCAVATION AND PIPES INSTALLATION
RA For ROAD WORKS - EXCAVATION AND PIPES INSTALLATION
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 1 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
2. Unlikely 2. Harmful
Page 2 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 3 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
down
Avoid direct contact with bird, bat or snake
All workers
Encountering Wildlife 2 If you come across wildlife, remain calm.
Involved
during site clearing
Do not try to remove or kill any pest/wildlife found on site; Always
Operation which may
consult a qualified pest-removal expert.
result in Swelling, mild
or severe allergic Always walk, don’t run. Running away from wildlife screams “prey.”
reactions from stinging You could also trip and injure yourself if you take off running in a
insects Serious injury panic.
or death Do not swat at or make fast movements around stinging insects, Foreman
most bees and wasps will not sting unless they are provoked or Supervisor
2 4 1 2 2
startled. Safety Officer
First Aiders
Destroy standing water for mosquitoes
If you are allergic to bee or wasp stings, please notify your
Supervisor.
Use insect repellant to reduce the chance of receiving insect bites.
Keep a first aid kit on site.
Wear the appropriate clothing for your work environment to reduce
tick and other insect bites.
Underground services 3 9 PTW must be obtained prior the excavation works 1 3 3 Foreman
3
All workers - gas, electricity or Underground testing must be carried out to identify underground Supervisor
Excavation of involved water utilities. Safety officer
Page 4 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Trenches (Manual) Falling materials or Ground conditions established by a survey to identify the type of
3 plant ground in which the excavation is to be carried out; means of
Falls of persons trench support confirmed upon completion of trial holes
Collapse of sides Remember that even work in shallow trenches can be dangerous.
Weakening of adjacent You may need to provide support if the work involves bending or
structures Noise kneeling in the trench. No one should be in the trench unless it is
safe to be there.
Where possible ensure that all water sources are turned off before
entering an excavation .
Do not store spoil or other materials close to the sides of
excavations. The spoil may fall into the excavation and the extra
loading will make the sides more prone to collapse Plant and
materials kept away from the side of excavations to prevent undue
pressure or ingress of exhaust fumes.
If there is a risk of water ingress, suitable methods and/or
equipment provided to either prevent the entry of water or to
remove water, e.g. water pumps
If plant could fall into the excavation, baulks or earth bunds should
Where excavations are dug next to structures, suitable preventative
measures established in case of collapse, subsidence or damage
Inspections of excavations carried out prior to each shift, after any
event likely to affect strength or stability be provided
Suitable personal protective equipment [PPE]
The location of electric cables, drains, gas and water mains etc. will
Page 5 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 6 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 7 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 8 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Entrapment due to fall/ Vehicles should never be overloaded. Loads should be evenly
roll of pipe. Operators distributed, secured and not protruding beyond the sides or back of
direct field of vision the vehicle.
obscured by load Reverse beeper, flashing beacon,and or mirrors fitted
leading to contact with Heavy duty gloves to be worn by operatives handling skids. All
other persons or plant. engines guards and covers to be in position and secured.
Displacement of load Windows, lights, mirrors and camera lens to be kept clean at all
Unloading and times . Foreman
All workers in Person being struck by
7 Laying of Pipes 3 2 6 Warning signs will be erected to alert pedestrians of Unloading 1 2 2 Supervisor
volved suspended pipe
sleeves Operations. Safety officer
causing serious injury
of harm. Defective Traffic management must be in place where loading/unloading is
and broken skids being carried out on public roads. Loads to be tipped only on
causing crushing of suitably level ground to prevent overturning of skip
limbs of entrapment of Encourage team lifting of pipes
body parts. Manual Workers to wear Hi Visibility Vests at all times and Hard-Hats
Handling.
8. Manual Handling Workers Ligament strains. 3 6 Full training and instruction provided in both induction and STARRT 1 2 3 Foreman
2
Muscle strains. briefing Supervisor
Fatigue. Abdominal Mechanical aids used wherever possible Safety officer
hernias. Workers adhere to guideline weights & to only lift what they are
Prolapsed/herniated able to lift
discs. Assess the load Weights marked on all loads.
Paralysis. Lift smaller loads. Cutting pipes to length
Page 9 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 10 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Dust inhalation tools, make sure you have a good center of gravity and are
Noise hazard properly balanced. Hold tools securely with two hands to maintain
control.
Position yourself properly when pushing the die handle.
Appropriate PPE such as diusk mask and ear plug shall be worn
while using power tool.
Start briefing talk shall be conducted before the start of the Job.
Foreman
Cuts, pinches, Keep tools in good condition. Inspect tools before use. Ear safety
Supervisor
11 Use of Hand tools Labours smashes, Punctures, 2 2 4 glasses. Work away from yourself. Use normal caution required for 1 2 2
Safety officer
severing of fingers. all hand tools.
Supervisor Wear hard hat. Handle tools carefully with dry gloves or hands.
12. Movement & Plant Movement of Plant 3 6 Site Plant & Equipment / vehicles to keep away from all 1 3 3 Project
Labours
operating and vehicles - falling excavations. Engineer
Supervisors into excavations. All persons should keep a 10m safe distance away from Trencher Foreman
Operators Untrained Plant during operation. Supervisor
Operators. ONLY Authorised Competent Plant Operators with valid Licence All concerned
Poor Visibility 2 shall operate Plant Equipment.
Material Falling from Movement of Plant Equipment SHALL be controlled vehicle
Heights. Banksman at ALL TIMES – Especially Reversing Operations.
Reversing Plant & Equipment shall be maintained – pre- start checks.
Operations. Plant & Equipment to Maintained – 12 Monthly examination
Persons Crushed certificates.
Reduce Speed when operating Plant Equipment on site.
Environmental.
Trucks are not to be overloaded – persons in a safe place.
Page 11 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
Page 12 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
SIGNATURE DATE:
Prepared by HSE Manager
Michael Adeyemo Designation 25th June, 2020
Name
Page 13 of 14
RISK ASSESSMENT
INCLUDEPICTURE
"http://www.qpm.com.qa/Style
Library/images/logo.png" \* Infrastructure and Pitches for Training Sites
MERGEFORMATINET
CONTRACT #: TDO-19-TTC-0169
Task Description:
ROAD WORKS – EXCAVATION AND PIPES INSTALLATION
Revision No: Rev. 0
Assessment Team: HST Team, Foreman, Superviosr and Labour Date: June 25, 2020
SIGNATURE DATE
Reviewed By
Designation
Name
Page 14 of 14