PP MCQ

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

01. You want to use production/resource tools in your manufacturing process.

Which production type


do you use?
Please choose the correct answer.
a) Repetitive manufacturing
b) Production order
c) Process order
d) KANBAN

02. What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP)
requirements?
There are 3 correct answers to this question.
a) Availability check
b) Digital signature
c) Resource selection
d) Electronic batch record
e) Approved master recipes

03. When scheduling a routing in the SAP ECC system, which of the following time elements is a
interoperation time?
Please choose the correct answer.
a) Safety time
b) Float before production
c) Processing time
d) Setup time

04. Which functions can be triggered before releasing a production order?


There are 3 correct answers to this question.
a) Confirmation
b) Selection of a routing
c) Scheduling
d) Stock determination
e) Selection of a BOM

05. What does SAP ERP mean?


Please choose the correct answer.
a) SAP ERP is a planning system in which extended planning processes can be mapped.
b) SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials
management, production and so on.
c) SAP ERP is a technological platform, on the basis of which customer-specific extensions can be
imported.
d) SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

06. How can you convert planned orders into production orders in an SAP ECC system?
There are 3 correct answers to this question.
a) Automatically, in the planning run (MRP)
b) Set the conversion indicator in Customizing for the planned order.
c) Use mass processing.
d) Use the order progress report.
e) Use background processing.

07. Which SAP NetWeaver component realizes cross-system application processes?


Please choose the correct answer.
a) SAP Business Warehouse (SAP BW)
b) SAP Enterprise Portal (SAP EP)
c) SAP Master Data Management (SAP MDM)
d) SAP Exchange Infrastructure (SAP XI) / SAP Process Integration (SAP PI)

08. You are using MRP controllers in an SAP ECC system. Which of the following statements
concerning MRP controllers are correct?
There are 2 correct answers to this question.
a) The MRP controller is maintained in production versions.
b) In multilevel single-item planning, materials are selected using the MRP controller.
c) An employee responsible for the planning of materials can be assigned to multiple MRP controllers.
d) The MRP controller is a central selection criterion for evaluating material requirements planning.

09. Where can you define the valid receivers for production order costs?
Please choose the correct answer.
a) In the valuation variant
b) In the production scheduling profile
c) In the settlement profile
d) In the costing variant

10. For which of the following objects can you enter a confirmation?
There are 2 correct answers to this question.
a) Production order
b) Production order operation
c) Trigger Point
d) Work Center

01. How can you limit the number of master data objects to be created when the manufacturing
process is the same for many different products?

Please choose the correct answer.

a) By creating routings with alternative sequences

b) By assigning the same production version to different materials

c) By assigning different materials to the same routing

d) By creating routings with parallel sequences

02. Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

a) Purchase orders

b) Planned orders

c) Transfers from batch to batch

d) Stock transfers

e) Collective orders

03. You want to procure your material components based on a forecast for the finished material
derived from historical sales. When customers order, you produce the finished product and reserve it
for that particular order.

Which is the appropriate planning strategy to use?

Please choose the correct answer.

a) Production by lot size (30)

b) Planning without final assembly (50)

c) Planning with final assembly (40)

d) Make-to-order production (20)

04. In which ways can you implement confirmations for production orders?

There are 2 correct answers to this question.

a) Through a SAP Manufacturing Intelligence and Integration (SAP MII) server

b) Through the Advanced Planning and Optimization (APO) component

c) Through the SAP Integrated Business Planning (SAP IBP) cloud solution

d) Through automatic process messages using SAP NetWeaver Process Integration (PI)

05. Which of the following are prerequisites for running MRP in a plant?

There are 3 correct answers to this question.

a) Assign a valid planning strategy

b) Set up the planning file

c) Activate requirements planning


d) Configure MRP groups

e) Maintain plant parameters

06. Which of the following options can you use for automatic line loading of planned orders on
available production lines?

There are 3 correct answers to this question.

a) Planning table

b) Quota arrangement

c) Sequencing

d) Selection method

e) PP/DS heuristics

07. Which object in customizing controls the determination of planned total overhead process costs
for production orders?

Please choose the correct answer.

a) Cost log

b) Accounting type

c) Costing variant

d) Settlement profile

08. For which planning strategy does the reduction of planned independent requirements always
occur with the goods receipt?

Please choose the correct answer.

a) Planning with final assembly (40)

b) Gross requirements planning (11)

c) Planning without final assembly (50)

d) Net requirements planning (10)

09. What happens when a repetitive manufacturing planned order is assigned to a production line in
the planning table?
There are 2 correct answers to this question.

a) The planned order generates capacity requirements.

b) The planned order is converted to a production order.

c) The system status of the planned order changes.

d) The planned order type changes.

10. The settings for MRP can be maintained at different levels. If settings have been maintained in
different places, in which sequence does the system search for the MRP settings?

Please choose the correct answer.

a) Plant Settings → MRP Group → Material Master

b) Material Master → Plant Settings → MRP Group

c) Material Master → MRP Group → Plant Settings

d) MRP Group → Material Master → Plant Settings

01. Which activity can trigger an automatic availability check for the components of a production
order?
Please choose the correct answer.
a) Material staging
b) Order rescheduling
c) Order release
d) Goods receipt for a missing part

02. During the implementation of SAP ECC material requirements planning, the project team
defines MRP controller numbers in Customizing under the entry "Define MRP Controller" that can be
assigned to the planners responsible for the material.
Which of the following statements are correct concerning these MRP controllers?
There are 2 correct answers to this question.
a) The MRP controller number is a central selection
b) A planner responsible for a material can have multiple MRP controller numbers.
c) In multilevel single-item planning, materials are selected using the MRP controller number.
d) The MRP controller number is assigned using the production version.

03. Which of the following scheduling types can only be used in capacity planning?
Please choose the correct answer.
a) Midpoint
b) Forward
c) Only capacity requirements
d) Backward
04. The company you are advising uses a plant data collection system from company XYZ and would
like to distribute production orders to the terminals on this system and enter feedback using these
terminals.
Which integration possibilities would you recommend so that as little work as possible is required for
the customer to implement this?
Please choose the correct answer.
a) SAP Manufacturing Integration and Intelligence (SAP MII)
b) The plant data collection interface (PP-PDC)
c) Execution Steps (XSteps)
d) The process control system interface PI-PCS

05. The final assembly of a finished product should only be triggered when a customer order
arrives. Which planning strategy for the finished product do you use?
Please choose the correct answer.
a) Planning with make-to-stock (strategy 10)
b) Planning at the assembly level (strategy 70)
c) Planning without final assembly (strategy 50)
d) Planning with final assembly (strategy 40)

06. Which options can you use to convert planned orders into production orders in the
SAP ECC system?
There are 3 correct answers to this question.
a) Mass processing
b) Automatically in the planning run (MRP)
c) Background processing in a program
d) Customizing for the planned order
e) Order progress report

07. You want to use the function "Read PP master data" in the production order. However, while
calling the function you receive an error message. What could be the reason?
Please choose the correct answer.
a) The material availability check has been performed.
b) Goods movements have been posted.
c) The production order has been released.
d) Order papers have been printed.

08. Which statements about the reorganization of planned independent requirements in SAP ECC are
true?
There are 2 correct answers to this question.
a) The reorganization only affects planned independent requirements that lie on a time axis to the
past from a specified key date.
b) The reorganization can be parameterized using a plant-specific reorganization interval.
c) The reorganization only deletes planned independent requirements that have no fixed planned orders
to them.
d) The reorganization is a form of demand adjustment in which non-settled planned independent
requirements for the planning are set to inactive but are not deleted.
09. Which types of objects can be changed with Engineering Change Management (ECM)?
There are 3 correct answers to this question.
a) Task list
b) Work center
c) Production version
d) Bill of material
e) Material master

10. Which BOM selection possibilities are available for opening a production order?
There are 2 correct answers to this question.
a) Manual selection
b) Automatic selection controlled with Customizing settings
c) Selection by BOM number in the material master of the material to be produced
d) Selection using the production scheduling profile
e) Selection using a production version

Q 1 - Which of the following module deals with processes like capacity planning and material planning
and execution of production order, bill of material and goods movement?

A - Plant Maintenance

B - Supply Chain Management

C - Sales and Distribution

D - Production Planning

Q 2 - In SAP PP, which of the following object is at the top in an Organization structure?

A - Plant

B - Company Code

C - Sales Organization

D - Storage Location

Q 3 - A BOM can be used for which of the following?

A - Costing

B - Material Requirement Planning

C - Sales and Distribution

D-A&B
E - All of the above

Q 4 - SAP Production Planning is integrated with which of the following modules?

A - Material Management

B - Sales and Distribution

C - Controlling

D - SAP QM

E - All of the above

Q 5 - Which of the following movement type is used to transfer Posting to storage location?

A - 301

B - 302

C - 305

D - 311

Q 6 - Which of the following Transaction code is used to display Production Lot?

A - MDL5

B - MDL3

C - MDL1

D - MEL1

Q 7 - In an industry, there is a high product stability, high repetition rate, and product complexity is
low. Which type of manufacturing is suitable for this type of production?

A - Discrete Manufacturing

B - Bulk Manufacturing

C - Repetitive Manufacturing

D - All of these
Q 8 - Goods issue can be cancelled till order status is confirmed CNF in system?

A - True

B - False

Q 9 - Which of the following report is used to collect information about hierarchy of work center of a
shift?

A - Shift Transfer Report

B - Shift Report

C - Shift Work center Report

D - None of these

Q 10 - Which of the following Transaction can be used confirm a Production Order and for Goods
movement?

A - CO01

B - CO02

C - CO15

D - MD16

You might also like