DFRK4141000183
5 SONA-TECH / 3
Shift arm 5th Rev
Repeated
Rejection details Probelem Area PPM Problem
(Yes / No)
1.During cooling of casting due to cross section variation, thin wall section
tense to bend, So we have provided Lug connectivity tie bar in casting itself
2.After stress reliving tie bar is removed & machining is completed.
3.During machining component been clamped position machining stress
develop, is relived when component is out of fixture
4.During induction hardening & tempering again stresses are induced in
component.
Action Take
2
1.During Root
coolingCause
of casting due ICA
to cross section variation, thin
wall section tense to bend, So
we have provided Lug
connectivity tie bar in casting
itself
2.After stress reliving tie bar is
removed & machining is
completed. Part 100 % verifed using
3.During machining receving Gauge
component been clamped
position machining stress
develop, is relived when
component is out of fixture
4.During induction hardening
& tempering again stresses
are induced in component.
Available part 43 mm ID
Setting Part mix up verifed using matting part
PCA Remarks
Probelem
SL.No Vendor name Part des Rej qty Rejection details
Area
DFRK4141000183
1 SONA-TECH / 3 XY off set Gauge Assembly
Shift arm 5th Rev not ok Line
Details of Top Vendor Rejection on trhe month Jan-24
Repeated
PPM Problem
(Yes / No)
no
Details of Top Vendor Rejection on trhe month Jan-24
Root Cause
1.During cooling of casting due to cross section variation, thin wall section
tense to bend, So we have provided Lug connectivity tie bar in casting itself
2.After stress reliving tie bar is removed & machining is completed.
3.During machining component been clamped position machining stress
develop, is relived when component is out of fixture
4.During induction hardening & tempering again stresses are induced in
component.
Action Take