111/6 111/8 111/10 111/12 111/14 111/16 111/18 111/18A 111/20 111/20A 111/24 111/26 111/28 111/30 111/32 111/34 111/36 111/38 111/40 112/02 112/12 112/16 112/18 112/19A 112/21A 112/22 112/24 112/26 112/28 112/30 112/32 112/34 112/36 112/38 112/40 112/42 112/44 112/46 112/48 112/50 112/52
111/22 111/42 111/44 112/04 112/06 112/08 112/10 112/14
111/2 111/22.30 111/85.30 111/130.30 111/161.80 111/193.30 111/224.80 111/256.30 111/287.80 111/329.80 111/356.80 111/382.30 111/413.80 111/422.80 111/476.80 111/512.80 111/548.80 111/598.30 111/652.30 111/715.30 111/769.30 111/823.30 111/872.80 111/940.30 111/989.80 112/12.30 112/52.80 112/88.80 112/133.80 112/187.80 112/237.30 112/282.30 112/314.80 111/346.30 112/349.80 112/381.30 112/38130 112/408.80 112/426.30 112/440.30 112/471.80 112/503.30 112/539.30 112/575.30 112/620.30 112/665.30 112/710.30 112/746.30 112/791.30 112/845.30 112/899.30 112/939.80 LEGEND
N-14 {NE-1,NB-6.00,NE-2} N-13{NE-1,NB-6.00,NE-1} N-12{NE-2,NB-4.50,NE-2} N-12{NE-2,NB-4.50,NE-2} N-10{NE-2,NB-4.50,NE-2} O-11{OE-1,OB-4.50,OE-1} O-4{OE-1,OB-4.50,OE-1} O-3{OE-2,OE-2} 0-4{OE-1,OB-1.50,OE-1} O-4{OE-1,OB-1.5,OE-1} O-3{OE-2,OE-2} TTC(5.50) O-5{OE-1,OB-1.50,OE-2} O-18{OE-2,OB-7.50,OE-2} O-18{OE-2,OB-7.50,OE-2} O-21{OE-2,OB-9.00,OE-2} O-6{OE-2,OB-1.50,OE-2} O-18{OE-2,OB-7.50,OE-2} 0-18{OE-2,OB-7.50,OE-2} O-12{OE-2,OB-7.50,OE-2} G-12{GE-2,OB-4.50,GE-1} G-12{GE-2,OB-3.00,GE-1} O-9{OE-2,OB-3.00,OE-2} O-9{OE-2,OB-3.00,OE-2} O-12{OE-2,OB-4.50,OE-2} O-9{OE-2,OB-3.00,OE-2} O-10{OE-1,OB-4.50,OE-1} O-12{OE-2,OB-4.50,OE-2} O-9{OE-2,OB-3.00,OE-2} NU-BU{NE-1,NB-4.50,BE-2} NU-BU{NE-1,NB-1.50,BE-2} NU-BU{NE-1,NB-4.50,BE-2} B-200 O-21{OE-2,OB-9.00,OE-1} O-18{OE-2,OB-7.50,OE-2} O-18{OE-2,OB-7.50,OE-2} TTC(5.50) N-19{NE-1,NB-9.00,NE-1} N-17{NE-1,NB(7.50),NE-2} O-2{OE-1,OE-2} B-175 B-175 N-10{NE-1,NB-4.50,NE-1} N-12{NE-2,NB-4.50,NE-2} B-200 B-175 B-175 6X6BFB SCHEDULE OF CONDUCTORS
111/22.30 B-200 O-12{OE-2,OB-4.50,OE-2} 6X6BFB
SL.No. DESCRIPTION SYMBOL
N-14 {NE-1,NB-6.00,NE-2} FROM TO TENSION LENGTH DRUM No MAKE
WIRE TYPE OF TYPE OF 1 SIGNAL
ROB END
CLS
CULVERT START
CULVERT START
ST.BLDG END
FOB STEPS
S/HUMP START
PATH
GANTRY END
ST.BLDG STR
SH.SIG
CULVERT END
BLDG START
CULVERT END
FOB END
CULVERT END
S/HUMP END
TOE
NOSE
NOSE
NOSE
TOE
TOE
ROB START
NOSE
NOSE
TOE
NOSE
TOE
NOSE
TOE
TOE
NOSE
TOE
NOSE
NOSE
TOE
NOSE
NOSE
TOE
FOB STR.
BLDG END
CULVERT STR.
RUN NO LOC.NO CHAINAG ANCHO LOC.NO CHAINAG ANCHO CATENAR CONTAC AC WIRE CATENAR CONTAC CATENAR CONTAC
1014.85
TOE
LSB FEEDER
E E Y T Y T Y T
R R 2 NORMAL MAST WITH CANTILEVER ASSEMBLY
110 685.60 111 382.30 612.57 612.57
W- 27 BWA 19 FTA
1/01 110 111
3 EXISTING MAST
W- 40 802.15 BWA 06 130.30 FTA 363.20 363.20
24.50
B-150 W-1 110
996.10 BWA 111
422.80 FTA 254.50 254.50 203.20 4 TWO TRACK CANTILEVER WITH DROP ARM
SIGNAL POST
47 21
UP &
PAR DN W-2 110
1000.15 BWA 111
652.30 FTA 588.70 588.70 98.50
LI (
369.436
48 32 5 PORTAL WITH DROP ARM
PRL
115.30
157.70
164.30
173.90
264.50
300.70
312.55
313.90
327.00
348.55
367.30
368.40
404.00
405.80
423.50
459.10
485.10
572.30
576.50
576.50
653.10
709.00
742.00
746.40
809.30
913.30
935.10
951.10
953.30
197.20
205.50
222.00
232.30
251.20
282.00
325.70
356.50
369.70
404.00
423.70
476.50
523.80
99.10
I) VKB/1002
W-3 VKB/1006 44.80 FTA 112
26 512.80 BWA 436.50 436.50 31.50
6 ANCHOR MAST WITH BALANCE WEIGHT TERMINATION
998.85 111 112
W-4 05 130.30 BWA 35 57080 BWA 1405.00 1405.00 58.00
B-150
KM:000.00(PRLI)
7 ANCHOR MAST WITH FIXED TERMINATION
300
36.00 W-5 VKB/1012 161.30 BWA 112
26 426.30 BWA 1287.50 1287.50
i = 3.05 0/F-2 111 112
0/F-1 W-6 11 224.80 BWA 39 665.30 BWA 1405.00 1405.00 58.00 8 CONVENTIONAL OHE (CATY. & CONT.)
0/108.20
0/45.20
B-150 W-7 VKB/1012 224.80 BWA 111
25 512.80 BWA 145.00 145.00 139.50 143.00
B-150 9 TRAMWAY OHE (CONT.)
W-8 111 256.30 112 503.30 807.00 807.00 130.50 462.50
VKB/1006 11 BWA 31 BWA
i=5.10 VKB/XO-1 VKB/1013 10 LARGE SPAN WIRE (130 Sq.mm)
111/44.80 VKB/1008 111 BWA(TW 112
VKB/1004 111/170.80 111/197.80
W-9 12 287.80
) 33 539.30 BWA 1274.00 1274.00 130.50
B-150 111/85.30
111/4.30 B-150 B-150 111 112 11 OUT OF RUN OHE (CATY. & CONT.)
B-175 W-10 13 382.30
BWA 38 620.30 BWA 1171.00 1171.00 247.50 89.50
B-150
111 BWA(TW VKB/1071
1/F-1 W-11 15 652.30
)
688.80 BWA 959.00 959.00 12 FEEDER F F F F
B
01/4.70
B-175
45.00 i=6.55 i=10.48 300 40.50 VKB/1010 VKB/1012 W-12 111
20 670.30
BWA(TW VKB/1071
) A
583.80 BWA 936.00 936.00 13 AUXILIARY TRANSFORMER
111/134.80 111/161.30 VKB/1014
i = 3.05 111/F-1 BWA(TW
B-150 B-175 111/193.30 111/22A W-13 VKB/1019 300.30 VKB/1071 583.80 BWA 274.50 274.50 ACC
) 14 ANTICREEP CENTRE
111/13.30 B-175 111/445.30
i=7.2 112
63.00 0
B-175 B-150 W-14 VKB/1021 314.80 FTA
BWA(TW
48 845.30 BWA 530.50 530.50
15 UN-INSULATED OVERLAP
W-15 VKB/1055 498.30 VKB/1071 583.80 BWA 175.50 175.50
58.5 )
0 300
40.50 111/F-2 TL=1362.70 ANTICREEP CENTRE ANTICREEP CENTRE
W-16 112/21A 381.30 BWA 113
39 912.85 BWA 1442.30 1442.30 53.50 16 INSULATED OVERLAP
A A
TC=40.20 54.00 i=3.00
SDG-02 VKB/1039 1021.30 ACA VKB/1047 192.30 ACA
22 SINGLE POLE ISOLATOR MANUALLY OPERATED
27(ACT31.50) i=3.05 H=6.25 ABDN GOODS PLATFORM
BWA SDG-03 VKB/1041 57.30 ACA VKB/1045 142.80 ACA 23 SINGLE POLE ISOLATOR WITH EARTHING HEEL
TC=25.00
i=12.19
FA
150 350
300
31.50 i = 7.15
BR. NO. 120
i = 4.80 i = 5.36 i = 9.25 i = 9.06 i = 3.05 24 DOUBLE POLE ISOLATOR WITH EARTHING HEEL
w.r.to DN MN ACA FTA ACA ACA(DMA)
i=3.00 200 i = 3.00 600 i = 3.07 DMA DMA DMA i = 9.06 i = 3.00 i = 5.02 i = 5.64 i = 4.82 i = 4.84 i = 4.95 i = 5.13
400 31.50 BWA i = 3.02 i = 3.55 OHE U/S i = 4.78 BWA i = 4.86 ACA
TC: MORE THAN 15.00m 31.50(ACT35.00) TC=2.35
27.50 200 400 i = 3.25 42.00 i = 3.07 i = 3.20 i = 3.05 OHE U/S 150 X-OVER 400
i = 4.85 STRUCTURE REQUIREMENTS 25 SECTIONING AND PARALLELING POST
BWA BWA 200 i = 3.02
300 i=7.00 31.50 300 500 31.50 200 31.50 100 Ø 31.50 50 200 31.50 200 i=2.57 200 200 200 200 200 200 200 200 200 200 200 200 DN LOOP 200 300 300 TC=2.32
111/F-4 TC=3.73 BFB 6X6 B-150 B-175 B-200 DWARF MAST
SM/1500 300 TS:1200 OHE U/S Br. 26 SUB-SECTIONING AND PARALLELING POST
111/107.80 i = 2.95 TC=3.99 OHE U/S KM TTU NU OU RU GU BFBU T-150 GU
150 TC=1.78 i = 3.09 9.50m 9.50m 9.50m 9.50m 3.85m 4.35m 4.85m
300 31.50 TC:4.73 FTA(X-OVER) 200 MAST
i = 3.00 i=6.40 S-1 i = 3.00 TC=9.90 TC=3.72 TC=4.77 TC=4.71 Ø 300 i=3.10 200 i = 3.00 i = 3.40 i = 3.72 i = 3.04 i = 3.00 i = 3.05 i = 3.50 i = 3.63 i = 3.90 i = 4.10 i = 2.80 i = 2.85 DN MAIN
i = 3.00 w.r.to DN MN 27.00 TC=4.85 TC=4.72 54.00 54.00 49.50 TC=5.30 67.50 49.50 45.00 40.50 36.00 45.00 54.00 49.50 45.00 i = 3.16 i = 3.10 i = 3.00 27 FEEDING POST AND SUB-STATION
i = 2.98 i = 3.00i = 2.95 300 TC=4.98 TC=5.01 TC=4.89 TC=4.80 54.00 T=4.76 63.00 TC=4.77 TC=4.76 TC=5.30 4.73 TC=4.73 TC=4.79 TC=4.86 TC=4.17 TC=5.30 TC=5.29 TC=5.24
31.50 35.00 48.50 BWA BWA 45.00 BWA 45.00
i = 3.00 350 150 FTA TC=15.60 TC=5.44 25.50 200 TS=430 TC=3.24 200 200 200 200 200 200 200 200 200 200 300 300 200
TC=4.37 300
800 200 500 Ø 36.00 150 50 54.00 i=2.31 111 - 6 3 03 - 11 - - 01 10 50 - - - 01 4
350 150 200
200 TC=2.38 Ø
200 100 Ø 100 Ø Ø 200 100 100 200 Ø 200 200 DN MN TC=2.51
Ø 200 TS=340 Ø 200 31.50 300 300 45.00 150 50 150 50 200 54.00 200 40.50 200 41.80
DN MAIN 100 28 WIRED TRACK
300 TC:3.15 TC=2.31 LINGAMPALLI 112 07 27 6 7 - 02 - - 04 20 26 - - 12 02 -
i=2.37 TC=2.70 150 TS=420 TC=2.29 TS=270
TS=450 Ø TC=2.31 300
100 TC=5.55 i = 3.25 45.00
TC=3.47 TC=5.13
TC=5.00 31.50 31.50 100 300 TS=250 TC=4.57 TC=4.27 TC=4.75
49.50 TC=5.00 TC=4.79 TC=4.85 TC=4.88 TC=5.16 TC=5.45 TC=5.55 TC=5.35
i = 3.04 400 300 TC=7.47 TOTAL 7 28 9 10 - 13 - - 5 30 76 - - 12 03 4 29 UN WIRED TRACK
TC=5.12 TC=4.90 TC=4.76 31.50 300TC=4.50 TC=5.95 36.00 TC=4.73 TC=4.56 TC=5.00 TC=4.76 32.50 TC=6.10 TC=6.91 TC=6.87 100 TC=5.32 31.50 TC=7.02
150
TC=5.00 63.00
i=2.20
63.00 350 150
i=2.63 45.00
350 150
TC=2.54
31.50 TC=4.91 100
TC=2.85
TS=510 45(ACT-42) 200 Ø
27.00 TC=2.55
Ø 200
TS=430
40.50
TS=440
54.00 200
TC=4.85
200
TC=5.30 36.00
200 200
TC=4.75
200 200
TC=4.61
200 200 200 200 200
36.00 200 200 200 UP MN 200 300 300 300 200 35.00 200 i=3.02
35.00 BWA
100 350 i=3.02 300
TC=6.11
100 31.50 TC=5.00 TS=400 100 36.00
500 Ø
31.50
TS=400 300
45.00
100
45.00
TC=3.25
TC=6.52
4.05
i=22.70
i=39.60
VKB/1019 ANTICREEP CENTRE
49.50
oil depot wall 112/F-24 i=12.00 i=12.00 i=12.00 189.6876 i=11.50 i=11.50 SM/1500 i=9.70 112/441.90
111/625.30 111/652.30 111/F-18 i=9.00 i=9.00 10.80 i=10.70 BUILDING WITH i = 3.10 200
111/710.80 594.00 680.00 112/7.80 ANTICREEP CENTRE EP EP EP 112/F-29 i=6.00
TL=220.50 TL=378.00 B-200 B-200 OIL DEPOT 16 18 SOLAR PANELS EP EP EP S-8 FTA
i = 3.01
8.00m
111/F-19 111/F-20 112/322.80 i=8.05 i = 3.03 PQRS-3
TO LOC:-111/F-9 TO LOC:-111/F-22 B-150 ACC UP LOOP i=20.00 i=20.00 i=11.30 i=20.00 ON TOP B-150 i=20.00 112/F-25 468.00
12 14
491.00 112/F-26 112/F-27 54.00 FA
111/764.80 111/827.80 111/F-21 B-175 i=13.51
CH:-111/341.80 CH:-111/940.30 EP EP EP EP 112/66.30 AC-2 112/129.30 112/183.30 112/F-28
VKB/1023A B-150 B-150 111/890.80 i=39.60 112/255.30 15.60 APPROVED AS ERECTED
111/701.80 B-150 B-150 B-175
VKB/1015 CENTRAL LINE OF LOADING & UNLOADING LINE B-150 i=22.70
VKB/1025A VKB TSS APPROCHING ROAD 23.0000 VKB TSS APPROCHING ROAD VKB TSS APPROCHING ROAD B-175
O-3(21.15)
111/589.30
VKB/1021 111/728.80 VKB/1027A
B-200 VKB/1029A VKB/1031 VKB/1033A VKB/1035A VKB/1037A VKB/1039A VKB/1041A VKB/1043A VKB/1045A VKB/1047A VKB/1049A VKB/1051A VKB/1053A VKB/1055A 112/F-30 112/F-31
111/670.30 O-8(23.65) 111/753.80 111/F-22 111/F-23
CH: 112/438.40
CH: 112/444.70
CH: 112/457.30
VKB/1019A O-3(21.15) TL=472.50
111/728.80 VKB/1027 TL=378.00 TO LOC:-111/F-23
111/665.80 VKB/1029 VKB/1031 VKB/1033 VKB/1035 VKB/1037 TO LOC:-112/F-31 VKB/1039 VKB/1041 VKB/1043 VKB/1045 VKB/1047 VKB/1051 VKB/1053 VKB/1055
CL OF
O-8(23.65) 111/753.80 TO LOC:-111/F-14 VKB/1049 CH:-111/980.80
B-150 111/791.80 CH:-112/426.30 VKB TSS VKB/1065
O-9(24.15)
O-11(25.35)
111/836.80 111/881.80 111/917.80 CH:-111/562.30 111/701.80 111/1021.30 112/57.30 112/97.80 112/142.80 112/192.30 112/223.80 112/246.30 112/273.30 112/309.30 KM:112/451.00
112/489.30 VKB/1067 VKB/1069 VKB/1071 TITLE:- FEEDER LAYOUT PLAN
O-3(21.15) OE-2,OB-1.50,OE-2 OE-1,OB-1.50,OE-2 OE-2,OB-1.50,OE-2 OE-2,OB-1.50,OE-2 OE-2,OB-1.50,OE-2 OE-2,OB-1.50,OE-2 OE-2,OB-1.50,OE-2 BE-2,NB-3.00,BE-2 BE-2,NB-3.00,BE-2 BE-1,NB-7.50,BE-1 BE-1,NB-7.50,BE-1 NE-2,NB-6.00,BE-2 VKB/1057 VKB/1059 VKB/1063 112/516.30 112/547.80 112/583.80
VKB/1017 NE-1,NB-4.50,NE-1
112/390.30 112/408.30 112/430.80 111/625.30 NE-1,NB-7.50,NE-1 NE-1,NB-7.50,NE-2 NE-1,NB-7.50,NE-2
B-200 B-200
FROM KM : 111/000.00(Incl.) For Dy.CEE/RE/SC
TTC(8.00) B-200
TO KM : 113/000.00 (Excl.)
1009.10
1014.85
703.00
210.10
212.30
248.50
270.60
306.60
308.80
345.20
366.80
402.80
405.80
441.90
461.30
485.10
497.10
500.40
509.20
535.40
570.20
605.80
608.20
629.00
644.00
655.80
656.80
681.70
686.25
703.80
720.60
757.90
829.80
874.10
896.80
963.70
994.60
110.80
147.00
148.30
154.00
110.80
263.30
299.30
373.50
384.10
384.40
429.70
454.30
466.10
493.10
519.20
541.40
571.70
591.60
593.35
640.70
719.63
766.80
770.60
610.50
413.00
598.50
720.40
115.30
151.30
SECTION : VIKARABAD STATION
40.30
890.30
898.40
555.50
ANTICREEP CENTRE ANTICREEP CENTRE ANTICREEP CENTRE
684.00
14 15
585.50 738.00
19 19
725.00 450.00
11 15
486.00 FOR KEC INTERNATIONAL LTD
RAMP &PATH
RAMP START
S/HUMP STR.
S/HUMP END
OIL DEPOT
OIL DEPOT
FOB STEPS
ROAD STRS
RAILWAY ELECTRIFICATION
GANTRY STR
DATE REV NO. NATURE OF MOD INITIAL
CLS
D.S TOE
E/P CH:
E/P CH:
E/P CH:
NB& PF
E/P CH:
E/P CH:
E/P CH:
BLNDG
BLNDG
D. END
TOE
CLS
CLS
CLS
NAME DATE SIGN
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
NOSE
CLS
CLS
CLS
CLS
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
TOE
CLS
CLS
CLS
DSGN SH
HAR
112/11 112/13 112/15 112/23 112/29 112/37 112/43 112/45 112/47 112/49 112/51 NA
111/01 111/3 111/5 111/7 111/9 111/11 111/13 111/15 111/17 111/17A 111/19 111/21 111/23 111/25 111/27 111/29 111/31 111/33 111/35 111/37 111/39 111/41 111/43 112/01 112/03 112/05 112/07 112/09 112/19 112/21 111/27 112/31 112/33 112/39 112/41 CHKD
CHIN SCALE :- 1 : 500
111/01
111/22.30
111/22.30
N-14 {NE-1,NB-6.00,NE-2}
111/85.30
N-13{NE-1,NB-6.00,NE-1}
111/130.30
N-12{NE-2,NB-4.50,NE-2}
111/161.80
N-12{NE-2,NB-4.50,NE-2}
111/193.30
N-10{NE-2,NB-4.50,NE-2}
111/224.80
O-11{OE-1,OB-4.50,OE-1}
111/256.30
O-4{OE-1,OB-4.50,OE-1}
111/287.80
O-3{OE-2,OE-2}
111/329.80
0-4{OE-1,OB-1.50,OE-1}
111/356.80
O-4{OE-1,OB-1.5,OE-1}
111/382.30
O-3{OE-2,OE-2}
111/422.80
O-5{OE-1,OB-1.50,OE-2}
111/476.80
O-18{OE-2,OB-7.50,OE-2}
111/512.80
O-18{OE-2,OB-7.50,OE-2}
111/548.80
O-21{OE-2,OB-9.00,OE-2}
111/598.30
0-6{OE-2,OB-1.50,OE-2}
111/652.30
O-18{OE-2,OB-7.50,OE-2}
111/715.30
0-18{OE-2,OB-7.50,OE-2}
111/769.30
O-12{OE-2,OB-7.50,OE-2}
111/823.30
G-12{GE-2,OB-4.50,GE-1}
111/872.80
G-12{GE-2,OB-3.00,GE-1}
111/940.30
O-9{OE-2,OB-3.00,OE-2}
111/989.80
O-9{OE-2,OB-3.00,OE-2}
112/12.30
O-12{OE-2,OB-4.50,OE-2}
112/52.80
O-9{OE-2,OB-3.00,OE-2}
112/88.80
O-10{OE-1,OB-4.50,OE-1}
112/133.80
O-12{OE-2,OB-4.50,OE-2}
112/187.80
O-9{OE-2,OB-3.00,OE-2}
112/237.30
NU-BU{NE-1,NB-4.50,BE-2}
112/282.30
NU-BU{NE-1,NB-1.50,BE-2}
112/314.80
NU-BU{NE-1,NB-4.50,BE-2}
112/349.80
O-21{OE-2,OB-9.00,OE-1}
112/381.30
O-18{OE-2,OB-7.50,OE-2}
112/408.80
O-18{OE-2,OB-7.50,OE-2}
112/440.30
O-12{OE-2,OB-4.50,OE-2}
112/471.80
N-19{NE-1,NB-9.00,NE-1}
112/503.30
N-17{NE-1,NB(7.50),NE-2}
112/539.30
O-2{OE-1,OE-2}
112/615.80
B-200
112/665.30
N-10{14.66}
112/710.30
N-12{15.56}
112/746.30
B-150
112/791.30
B-150
112/836.30
B-150
112/885.80
6X6BFB
112/939.80
B-150
APPD GAN
ESH SUB SCALE:- NTS
IR
N-14 {NE-1,NB-6.00,NE-2}