Installation of BMS System. Corrected
Installation of BMS System. Corrected
SCOPE OF WORK:
Contract No. H - Hold Point R - Review Point
Construction of Infrastructure & Operation & Maintenance Building
Discipline MEP ITP Reference No. Rev. No. 00 Date W - Witness Point S - Surveillance
Prequalification
As per Design
Submittal Prior to start of work Approved PQ
1.1 Document Review Drawings and Engineer’s Approval - H - R R R -
Approval (100%) Submittal
Project Specification
Approved Shop
As per Design Engineer’s approval Drawing,
Prior to start of work
1.3 Shop Drawings Document Review Drawings and on latest revision of Pre- - H - R R R -
(100%)
Project Specification relevant Drawings commencement.
Checklist.
3.0 Installation
Compliance with
Mock-Up IR for As per Design approved shop Inspection Request.
Visual Inspection of Prior to each activity
3.1 installation of Drawings and drawing, Checklist. - H - H R R -
installation (100%)
Panels & Devices Project Specification Specification and Survey Report
MES
Compliance with
Marking, Anchoring, As per Design approved shop Inspection Request.
Visual Inspection of Each Installation
3.2 drilling & support Drawings and drawing, Checklist. - H - W R/S R/S -
installation (100%)
installation Project Specification Specification and Survey Report
MES
Compliance with
Installation of Cable
As per Design approved shop Approved Inspection
containment, boxes, Visual Inspection of Each Installation
3.3 Drawings and drawing, Request - R - R R/S R/S -
Flexible conduit & installation (100%)
Project Specification Specification and
accessories
MES
Compliance with
Positioning & As per Design approved shop
Visual inspection of Each Installation Inspection Request.
3.5 Installation of Drawings and drawing, - H - H R/S R/S -
installation (100%) Checklist.
Control Panels Project Specification Specification and
MES
Compliance with
Installation of As per Design approved shop
Visual inspection of Each Installation Inspection Request.
3.6 Instrumenation field Drawings and drawing, - H - H R/S R/S -
installation (100%) Checklist.
devices Project Specification Specification and
MES
Compliance with
Positioning & As per Design approved shop
Visual inspection of Each Installation Inspection Request.
3.7 Installation of Drawings and drawing, - H - H R/S R/S -
installation (100%) Checklist.
workstation Project Specification Specification and
MES
Compliance with
Glanding &
As per Design approved shop
termination of Visual inspection of Each Installation Inspection Request.
3.8 Drawings and drawing, - H - H R/S R/S -
Wire/Cables installation (100%) Checklist.
Project Specification Specification and
(Control)
MES
Compliance with
Electrical Wire/ As per Design approved shop
Visual Inspection of Each Installation Approved Inspection
3.9 Cable Pulling & Drawings and drawing, - R - R R/S R/S -
installation (100%) Request
termination Project Specification Specification and
MES
Compliance with
As per Design approved shop
Installation of Body Visual inspection of Each Installation Approved Inspection
3.10 Drawings and drawing, _ R _ R R/S R/S -
earthing installation (100%) Request
Project Specification Specification and
MES
Compliance with
As per Design approved shop
Identification & Visual inspection of Each Installation Inspection Request.
3.11 Drawings and drawing, - H - W R/S R/S -
Labeling installation (100%) Checklist.
Project Specification Specification and
MES
Compliance with
Final Inspection for As per Design approved shop
Visual inspection of Each Installation Inspection Request.
3.12 Installation of BMS Drawings and drawing, - H - H R/S R/S -
installation (100%) Checklist.
System Project Specification Specification and
MES
4.0 Testing
Compliance with
approved shop
As per Design
BMS Cable Visual Inspection of Each Installation drawing, Inspection Request. Calibration certificate of
4.1 Drawings and - H - H R/S R/S -
Continuity Test installation (100%) Specification/ MES/ Checklist. testing equipment
Project Specification
As per manufacturer
recommendation
Compliance with
approved shop
Operational & As per Design Inspection Request.
Each Installation drawing, Calibration certificate of
4.2 Functional Testing Visual (Testing) Drawings and Checklist. - H - H R/S R/S -
(100%) Specification/ MES/ testing equipment
of BMS System Project Specification
As per manufacturer
recommendation