BILL #1
GENERAL REQUIREMENTS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 2
SITE WORKS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 3
SUB-STRUCTURE
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 4
SUPER STRUCTURE
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 5
BILL # 6
METAL WORKS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 7
BILL # 8
FINISHES
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 9
BILL # 10
DRAINAGE WORKS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 11
HVAC WORKS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 12
LPG WORKS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 13
ELECTRICAL WORKS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
BILL # 14
BILL # 15
PROVISIONAL SUMS
EMSQUARE 3 No. B + G + 1 Villas
on Plot No. 323-459
GRAND SUMMARY
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
GENERAL REQUIREMENTS
General
Form of Tender
A The Contractor shall describe and list below and price 1.00 Item Included
Form of Agreement
B The Contractor shall describe and list below and price 1.00 Item Included
herein any obligation contained in the Form of
Agreement and Appendices for which he has not
allowed elsewhere and wishes to price separately
Conditions of Contract
C The Contractor shall describe and list below and price 1.00 Item Included
herein any obligation contained in the Conditions of
Contract (Part I & II) for which he has not allowed
elsewhere and wishes to price separately
Specifications
D The Contractor shall describe and list below and price 1.00 Item Included
herein any obligation contained in the Specifications
for which he has not allowed elsewhere and wishes to
price separately
1/18
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Preambles
A The Contractor shall describe and list below and price 1.00 Item Included
herein any obligation contained in the Preambles for
which he has not allowed elsewhere and wishes to
price separately
Bill of Quantities
B The Contractor shall describe and list below and price 1.00 Item Included
herein any obligation contained in the Bill of Quantities
for which he has not allowed elsewhere and wishes to
price separately
Provisional Sums
C The Contractor shall be deemed to have allowed here 1.00 Item Included
for any other special preliminaries requirements not
specifically stated in relation to all works listed under
Provisional Sum section of the Contract
Performance Bond
D The Contractor should allow for the provision of the Not Applicable
performance bond in accordance with the
requirements of the Contract
Insurances
E The Contractor should allow for the provision of the 1.00 Item 5,000.00
insurances in accordance with the requirements of the
Contract
1/19
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A The Contractor shall provide all constructional plant, 1.00 Item 134,500.00
lifting equipment, transport facilities, tools and
services required for the proper execution of the Works.
The facilities shall include the provision of protective
clothing and safety equipment complete. The
Contractor shall be responsible for delivery to the site
of all constructional plant, which he needs to carry out
the Works. This responsibility shall include shipment,
customs clearance, off-loading, loading and handling
and all transportation to site and the removal of all
redundant plant on completion of the Works.
B The Contractor shall be responsible for obtaining all 1.00 Item Included
approvals necessary for the Government Departments,
the Police, Local Service Authorities (ie. Dubai
Electricity and Water Authority. Etisalat / EITC, Civil
Defence, etc) as required in the performance of this
Contract, and for coordinating approvals and the like
with requirements of the master plan developer and
his representatives necessary for the works to proceed.
C The Contractor shall be responsible for obtaining the 1.00 Item Included
Site Boundary Demarcation Certificate form the
relevant Section of JAFZA, agree the location of the Site
Boundary markers with the Survey Section and to
carry out permanent demarcations. The Contractor
shall provide the Engineer with a copy of the certificate.
The Contractor shall be responsible for liaising with
JAFZA.
1/20
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Temporary Works
1/21
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Temporary Utilities
A The Contractor shall provide proper and adequate 1.00 Item Included
temporary utilities for his own use and for the use of
his own subcontractors
Existing Services
C The Contractor shall arrange and provide adequate 1.00 Item 91,500.00
temporary supply of all necessary electrical power and
lighting for the Works including paying all charges for
consumption of electricity or supplying, operating and
maintaining generators at his own expense including
final testing and commissioning and until final
handing over for the Works.
Water
D The Contractor shall arrange for a temporary supply of 1.00 Item Included
water for the Works, suitable for all purpose through
out the duration of the project and including final
testing and commissioning and until final handing
over. Furthermore, the Contractor shall pay all charges
for the consumption of water used. Portable water for
the project will be arranged by the contractor for the
entire duration of the project
1/22
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Temporary Drainage
B The Contractor is to allow for keeping the site dry at all 1.00 Item Included
times. The Contractor shall provide and maintain
temporary drainage installation as may be necessary
during the period of construction in a manner
approved by the Engineer and in accordance with the
local authorities regulation and direction. At
completion of work Engineer may direct to remove all
temporary drainage installation and make good
existing to Engineer's satisfaction
Fire Hazards
C The Contractor shall be responsible for ensuring that 1.00 Item Included
proper precautions are taken to protect the temporary
buildings and it's contents where naked flame is used.
He shall ensure that the extinguishers are available in
areas where such hazards exist.
D Provide and maintain efficient fire fighting facilities 1.00 Item Included
and equipment together with personnel trained in its
use as detailed in the specification
1/23
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A The Contractor shall provide temporary sheds, offices, 1.00 Item Included
mess rooms, sanitary accommodation, welfare
facilities, and like for the use of his agent and site staff
and such office shall be open at all reasonable hours to
receive instructions, notices or other communications
and clear away on completion of the Contract
B The Contractor shall provide and maintain proper 1.00 Item Included
office facilities on site for the sole use of the Employer,
Engineer and their staff complete with furniture and
equipment in accordance with the specification, all as
instructed by the Engineer.
D The Contractor is to provide and install native pattern 1.00 Item Included
fly proof latrines and urine pans for his employees
adjacent to the work, of a type which shall be approved
by the Local Medical Authorities and Engineer, and
shall be responsible for properly screening and
maintaining the site in a clean and sanitary condition
to the satisfaction of the Engineer through out the
period of the Contract.
1/24
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Temporary Hoardings
A The Contractor shall provide temporary fencing, gates, 1.00 Item 10,000.00
hoardings, fans, flanked footways, guard rails, gantries
and the like as may be necessary for protecting the
public or occupants for the proper execution of the
works
B The Contractor to provide and maintain 1 number site 1.00 Item 2,000.00
sign boards in steel posts painted and fixed in concrete
foundation and with lighting all as per drawing &
approval of Engineer
Protection
E The Contractor shall comply with enactments and 1.00 Item Included
regulations relating to safety, health and welfare of
workmen and the public at large. The Contractor shall
provide and maintain first aid facilities on the site to
the approval of the Engineer
1/25
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
B Allow for clearing away rubbish at regular intervals 1.00 Item 25,000.00
during the progress of the work and at the completion
and for leaving the site and perimeter tidy at
completion, to the satisfaction of the Engineer.
E The Contractor to allow for all tests required by the 1.00 Item 5,000.00
Specification to be carried out including providing all
necessary materials and samples. Duplicate final
approved samples are to be provided for the Engineer,
one for office use and one for site. Each sample to be
properly labelled with the following details name,
manufacturer's name, date of submission &
specification reference
1/26
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A The Contractor shall provide the Engineer each month 1.00 Item 7,000.00
with thirty coloured photographs showing work in
progress on the site from viewpoints selected by the
Engineer. In addition one set in digital format and two
copies of each progress photograph in post card size
shall be provided with a description of the viewpoint
and the sate of taking written or stamped in ink on the
back. A copy of all the above photographs together
with the negatives shall be forwarded to the Employer
at the same time.
1/27
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 1– GENERAL REQUIREMENTS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
1/28
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 2– SITE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
SITE WORKS
(Including Servant Block & Guard Room)
A Site Cleaning including removal of vegetation,
shrubs, bushes and surface excavation 1 LS 8,316.00
EARTHWORK SUPPORT
DE-WATERING
DISPOSAL
2/29
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 2– SITE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
2/30
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 2– SITE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
2/31
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 2– SITE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
2/32
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 3– SUB STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
SUB STRUCTURE
(Including Servant Block & Guard Room)
All works shall be carried out as per
specifications and Drawings and to the
approval and satisfaction of the Engineer
CONCRETE
Plain cement concrete of grade SRC C20
including all necessary form work complete as
required
A 75 mm thick below raft slab, ramp slab and footings. 1227 m2 50.00 61,350.00
B 100 mm thick below tie beam and solid block work 65 m2 55.00 3,575.00
3/33
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 3– SUB STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
3/34
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 3– SUB STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
F 50mm thick protection screed for Basement raft 624 m2 39.00 24,336.00
slab and footings (horizontal)
Masnory works
J 200mm thick block wall below the tie beam 144 m2 77.00 11,088.00
3/35
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 3– SUB STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
3/36
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 3– SUB STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
3/37
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 4– SUPER STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
SUPER STRUCTURE
(Including Servant Block & Guard Rooms)
Reinforced cement concrete compressive
characteristic strength 40 N/mm2 with of grade
OPC type II with necessary Approved
plasticizer and admixture. Cost inclusive of
Necessary form work, Reinforcement as per
the drawings, specifications. etc complete.
The reinforcement shall comply with relevant
British Standards.
C 250mm thick Suspended slabs (GF,FF & Roof) 545 m3 1,092.00 595,140.00
(Including 200mm & 140mm thk)
4/38
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 4– SUPER STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
BLOCK WORK
External
Internal
Lintel
4/39
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 4– SUPER STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
4/40
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 4– SUPER STRUCTURE
Item
Description Qty Unit Rate Amount / Dhs.
No.
SUPERSTRUCTURE (cont'd)
Collection
4/41
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 5– THERMAL & MOISTURE PROTECTION
Item
Description Qty Unit Rate Amount / Dhs.
No.
Roofing
A Flat roof water proofing system as shown in the drawing 1043 m2 94.00 98,042.00
and specification etc., complete including below roof clay
tiles
Moisture Protection
Sundries
5/42
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 5– THERMAL & MOISTURE PROTECTION
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
5/43
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 5– THERMAL & MOISTURE PROTECTION
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
5/44
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
METAL WORKS
(Including Servant Block & Guard Room)
ALUMINIUM DOORS AND WINDOWS
6/45
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
6/46
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A Window W/04
Size 5000x400mm high 2 No. 1,397.00 2,794.00
B Window W/06
Size 1000x2700mm high 13 No. 1,188.00 15,444.00
C Window W/07
Size 1200x2700mm high 12 No. 2,063.00 24,756.00
D Window W/07A
Size 1200x2800mm high 4 No. 2,063.00 8,252.00
E Window W/08
Size 1500x2700mm high 4 No. 1,562.00 6,248.00
F Window W/09
Size 1200x1800mm high 6 No. 1,562.00 9,372.00
G Window W/10
Size 1500x2700mm high 2 No. 6,798.00 13,596.00
H Window W/11
Size 1500x2700mm high 7 No. 2,541.00 17,787.00
J Window W/12
Size 950x2700mm high 5 No. 1,925.00 9,625.00
K Window W/13
Size 1800x2700mm high 7 No. 2,750.00 19,250.00
6/47
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A Window W/17
Size 800x1800mm high 3 No. 1,155.00 3,465.00
B Window W/21
Size 3000x2700mm high 4 No. 4,978.00 19,912.00
C Window W/25
Size 5000x1800mm high 1 No. 5,324.00 5,324.00
D Window W/07B
Size 950x2700mm high 1 No. 1,782.00 1,782.00
E Window W/27
Size 2200x2800mm high(Fixed) 1 No. 2,409.00 2,409.00
F Window W/28
Size 3100x2700mm high 2 No. 4,422.00 8,844.00
G Window W/29
Size 3300x2700mm high 2 No. 4,703.00 9,406.00
H Window W/30
Size 3800x2700mm high 2 No. 5,357.00 10,714.00
J Window W/11F
Size 3800x2700mm high 2 No. 2,519.00 5,038.00
6/48
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A Window W/06B
Size 1000x1900mm high 8 No. 908.00 7,264.00
B Window W/022A
2200x2700mm high 4 No. 3,658.00 14,632.00
C Window W/07FW
Size 1200x1900mm high 2 No. 1,056.00 2,112.00
D Window W/08FW
Size 1500x1900mm high 1 No. 1,254.00 1,254.00
E Window W/08B
Size 1600x1800mm high 1 No. 1,898.00 1,898.00
F Window W/08C
Size 1150x1800mm high 3 No. 1,513.00 4,539.00
G Window W/07C
Size 1200x2200mm high 2 No. 1,826.00 3,652.00
H Window W/08D
Size 1500x2200mm high 1 No. 2,013.00 2,013.00
J Window W/08E
Size 1200x1800mm high 5 No. 1,562.00 7,810.00
K Window W/06FW
Size 1000x2700mm high 2 No. 1,463.00 2,926.00
L Window W24,
Size 2250x2700mm high 1 No. 2,673.00 2,673.00
6/49
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
G.I Railing
H Supply and fix 60mm dia GI pipe railing, painted finish in 8 m 660.00 5,280.00
roof
Spiral Staircase
J 02 No of Supply & installation of Galvanised steel spiral
stair case as per the drawing - Provisional Sum -
1 PS 22,000.00
Dhs.22,000.00 Including 10% Overheads & Profit.
6/50
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Steel Doors
Miscellaneous
G Supply and fix MS epoxy painted access platform in OTS Not Applicable
H Supply and fix security grills for windows around OTS Not Applicable
J Supply and fix wrought iron grill to basement window 11 m 770.00 8,470.00
(PC supply and fix rate Dhs. 700/- per Rm)
6/51
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
6/52
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 6– METAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
6/53
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 7– WOODEN & JOINERY WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
WOODEN & JOINERY WORKS
(Including Servant Block & Guard Room)
Supply and fixing of 45mm thick semi solid wooden
door frame with flush shutter including all necessary
hardware, ironmongery, HW lippings, Architraves,
signage, sub frames, fire rating with appropriate
smoke seal & intumescent strips to door and meranti
finish/ polished/ painted/ Laminated as specified and
shown in the drawing's and specification, engineers
approval complete. All fire proofing shall be as per
the ID details/ civil defence /authority requirements
A 45mm thick semi solid core single leaf flush door with cherry
wood in laqured finish frames and Architraves as per
eng approval (Shutter External - Cherry wood finish.
Internal Cherry Wood Stained/polished finish)
(PC Rate Dhs. 3000/No)
7/54
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 7– WOODEN & JOINERY WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
WARDROBES
VANITY CABINETS
SHELVES
EXCLUDED
Supplying and fixing of shelves As per Drawing & specification
TIMBER PERGOLA
7/55
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 7– WOODEN & JOINERY WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
7/56
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 7– WOODEN & JOINERY WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
7/57
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
FINISHES
(Including Servant Block & Guard Room)
All the finishing items shall be as per the
schedule of finishes. The floor and wall tiles
Shall be fixed using approved epoxy adhesive
and epoxy grout Colour matching to the tiles,
and to approval. All the curved joint shall be
cut with water jet cutting as per drawing and
specification. (The material and workmanship
shall be to the approval of The engineer.)
INTERNAL
Floor Finishes
8/58
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
EXCLUDED
C1 300x300 Granite tile 53 m2 - -
PC Supply Rate Dhs.200/m2
8/59
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
8/60
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
D1 Main Staircase 38 m2 - -
PC Supply Rate Dhs.50/m2
8/61
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Skirting
8/62
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
INTERNAL FINISHES (Cont'd)
Skirting (Cont'd)
8/63
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Threshold
8/64
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Wall Finishes
B 4729
Emulsion Painting 1 coat Primer only for the plastered surface m2 3.00 14,187.00
8/65
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Ceiling finishes
8/66
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
ACCESSORIES
Sanitary Fittings
8/67
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Accessories (Cont'd)
Sundries
8/68
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
FINISHES (Cont'd)
EXTERNAL
F Heavy Texture 4 coats solvent based epoxy paint 3075 m2 39.00 119,925.00
system for all exposed surface
8/69
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
EXTERNAL (Cont'd)
A Supply and install 60mm thick inter lock paver with Refer Provisional Sum
all necessary base and kerb stone as per the
drawings
Pitched Roof
B1 Clay roof tiles red colour including Eaves, Ridges 135 m2 55.00 7,425.00
(PC Supply Rate Dhs.55/m2)
B2 Main Contractors rate for all items necessary 135 m2 100.00 13,500.00
For fixing, etc
GRC WORKS
C Supply & Fixing GRC Elements as per drawing and Refer Provisional Sum
specification.
8/70
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
8/71
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
8/72
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 8 – FINISHES
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
8/73
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 9 – WATER SUPPLY WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
9/74
Item
Description Qty Unit Rate Amount / Dhs.
No.
EXTERNAL WORKS
A Main water meter connection with accessories, Included in above Item-A, Page 9/1
valves, meter cabinet (meter by DEWA)
B ADDITIONAL ITEMS
The tenderer is to detail below any additional
Items with quantities and rates not previously
included to complete the build up of the lump
sum tender price for this section of the works.
Should the tenderer fail to insert any items here,
it will be deemed that his lump sum price for
the tender includes all items and no subsequent
claim for additional item will be entertained.
9/75
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
Page 9/2
9/76
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 10 – DRAINAGE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
MECHANICAL WORKS
DRAINAGE WORKS
10/77
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 10 – DRAINAGE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
EXTERNAL
ADDITIONAL ITEMS
C The tenderer is to detail below any additional
Items with quantities and rates not previously
included to complete the build up of the lump
sum tender price for this section of the works.
Should the tenderer fail to insert any items here,
it will be deemed that his lump sum price for
the tender includes all items and no subsequent
claim for additional item will be entertained.
10/78
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 10 – DRAINAGE WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
Page 10/2 -
10/79
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 11 – HVAC WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
MECHANICAL WORKS
HVAC
11/80
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 11 – HVAC WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
HVAC (Cont'd)
Collection
Page 11/1
11/81
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 12– LPG WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
LPG WORKS
12/82
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 12– LPG WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
12/83
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
ELECTRICAL WORKS
13/84
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
13/85
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
ELV SYSTEM
13/86
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Containment System.
Included in above Item-A, Page 13/1
E Supply and Install complete containment system
including cable tray, cable trunking, conduit,
ladder, covers, fittings, accessories, hardware's,
supports, etc. all as specified in drawing /
specification.
Heavy duty GI cable trays with necessary
accessories, supports, earthing links etc.
13/87
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
13/88
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
13/89
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Sundries/General Items
13/90
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
A The tenderer is to detail below any additional
Items with quantities and rates not previously
included to complete the build up of the lump
sum tender price for this section of the works.
Should the tenderer fail to insert any items here,
it will be deemed that his lump sum price for
the tender includes all items and no subsequent
claim for additional item will be entertained.
13/91
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 13 – ELECTRICAL WORKS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
13/92
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 14 – EXTERNAL WORKS WITHIN PLOT LIMIT
Item
Description Qty Unit Rate Amount / Dhs.
No.
14/93
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 14 – EXTERNAL WORKS WITHIN PLOT LIMIT
Item
Description Qty Unit Rate Amount / Dhs.
No.
COMPOUND WALL
14/94
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 14 – EXTERNAL WORKS WITHIN PLOT LIMIT
Item
Description Qty Unit Rate Amount / Dhs.
No.
Servant Block
14/95
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 14 – EXTERNAL WORKS WITHIN PLOT LIMIT
Item
Description Qty Unit Rate Amount / Dhs.
No.
ADDITIONAL ITEMS
A The tenderer is to detail below any additional
Items with quantities and rates not previously
included to complete the build up of the lump
sum tender price for this section of the works.
Should the tenderer fail to insert any items here,
it will be deemed that his lump sum price for
the tender includes all items and no subsequent
claim for additional item will be entertained.
14/96
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 14 – EXTERNAL WORKS WITHIN PLOT LIMIT
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
From Page 14/1 -
14/97
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 15 – PROVISIONAL SUMS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A2 Attendance
-
A3 Overheads & Profits 10% % 75,000.00 7,500.00
B2 Attendance
-
B3 Overheads & Profits 10% % EXCLUDED
15/98
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 15 – PROVISIONAL SUMS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A1 HVAC Works
Dhs.650,000 for all Villas 1 PS - EXCLUDED
A2 Attendance
-
A3 Overheads & Profits 10% % EXCLUDED
B2 Attendance
-
B3 Overheads & Profits 10% % EXCLUDED
C2 Attendance
-
C3 Overheads & Profits 10% % EXCLUDED
15/99
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 15 – PROVISIONAL SUMS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A2 Attendance
-
A3 Overheads & Profits 10% % 300,000.00 30,000.00
B2 Attendance
-
B3 Overheads & Profits 10% % 120,000.00 12,000.00
C2 Attendance
-
C3 Overheads & Profits 10% % EXCLUDED
15/100
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 15 – PROVISIONAL SUMS
Item
Description Qty Unit Rate Amount / Dhs.
No.
A2 Attendance
-
A3 Overheads & Profits 10% % 60,000.00 6,000.00
15/101
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
Bill No. 15 – PROVISIONAL SUMS
Item
Description Qty Unit Rate Amount / Dhs.
No.
Collection
15/102
EMSQUARE 3 No. B+G+1 VILLAS
CONTRACT BOQ PLOT NO. 323-459
GENERAL SUMMARY
Contract
Bill No. Description Page No.
Amount /Dhs
SUMMARY
11 HVAC 11/2 PS
SUB-TOTAL 6,662,000.00