PODIUM P1 RC BEAM
RC SLAB NT-A T1-Z RC SLAB SSL +49.315
SSL +45.950 m PODIUM P1 RC WALL
SSL +45.950 m T1 T2
RC SLAB
SSL +45.575 RC SLAB 50 T3
SSL +45.575 RC SLAB
EXPANSION JOINT
PODIUM P2 (PARKING)
SSL +48.575 m
T1-H T1-E T1-D 3 SECTION ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE
SPECIFICATIONS. ANY DISCREPANCIES ARE TO BE BROUGHT TO
TWR1-P2-100-00 1 : 25 THE ATTENTION OF THE ENGINEER AND RESOLVED BEFORE
COMMENCEMENT OF ANY WORK.
5. OPENINGS LESS THAN 300MM ARE NOT SHOWN FOR CLARITY.
FOR DETAILS OF ANY OPENINGS/SLEEVES BELOW 300MM IN
DIMENSION SHALL BE REFERED TO MEP DRAWINGS.
T1-01 T1-02 T1-04 T1-B T1-A 6. REVISION DESCRIPTION
RC WALL
T1-B T1-A A). REVISION SEQUENCE, R0, R1, R2, R3.....Rn DESCRIBES
DRAWING ISSUED FOR CONSTRUCTION (IFC).
PODIUM P2 (PARKING) RC SLAB PODIUM P2 (PARKING) RC SLAB PODIUM P2 (PARKING) RC SLAB RC SLAB PODIUM P2 (PARKING) RC SLAB B). REVISION SEQUENCE, 00, 01, 02, 03.....nn DESCRIBES
SSL +48.575 m SSL +48.575 m SSL +48.575 m SSL +48.575 m DRAWING ISSUED FOR APPROVAL/COORDINATION.
RC SLAB RC SLAB
SSL +48.275 SSL +48.275 SSL +48.275
SSL +48.100
RC SLAB
RC BEAM DATE: SCALE @ A1: DRN BY: CHKD BY: APP BY: REVISION