28-01-2019
CONTRACTOR DOCUMENT REVIEW
(B) NO EXCEPTION TAKEN.
(A) NO EXCEPTION TAKEN. COMPLY WITH COMMENTS.
WORK MAY PROCEED.
(C) NO EXCEPTION TAKEN
EXCEPT CLOUDED AREAS. (D) REVISE AND RESUBMIT.
RESUBMIT CLOUDED AREAS. WORK NOT TO PROCEED.
CONTENTS
SCOPE
HSE PLAN
SUPERVISION ACTIVITIES
EQUIPMENTS TO BE UNLOADED
METHOD OF STATEMENT
ATTACHMENTS
1. SCOPE
The purpose of generating this method statement is to define the procedure step by step to
implement the correct practices for loading, Transportation, Unloading and Installation of 11
KV Switchgear thorough the Guideline contained herein so as to ensure that the job execution
complies with the requirement’s and serves the intended function to satisfactory level.
Unloading the 11KV Switchgear at Designated area near DG set /11kv switchgear room
Shifting the 11KV Switchgear from offloading area to inside11kv switchgear room
Inspection
2. HSE PLAN
All the activities related to HSE shall be carried out as according to existing site HSE plan of the Main
Contractor.
2. a. Risk Assessment
Risk assessment for the activity is done and hazards are identified and precautionary
measures are in place.
Ensure that all required PPE’s are available with the crew member’s
It may be noted that, anyone is authorized to stop the work if there any unsafe condition
is encountered.
All required equipment’s, Tools are checked before starting any work for suitability.
Ensure that competent personnel with adequate experience and skill handle the assigned
job.
3. SUPERVISION ACTIVITIES
The Whole activity of Loading, Transportation, Unloading, Placement of assigned Locations shall be
carried out under site “supervisor”
It is the Responsibility of “Site supervisor” to Ensure Safe Execution of complete works including and
Not Limited To:
4. EQUIPMENTS TO BE UNLOADED
Lifting Belts
7. METHOD OF STATEMENT
Make sure that the Switchgear room Floor painted and ready for final installation of
11KV Switchgear
Make sure that the Switchgear Room is clear and Free from any form of Debris
Ensure that the access for the Switchgear Installation is free from obstruction
Make sure that all the accessories and Tools required for Installation of Switchgear are in
Place
Park the Truck with Loaded 11Kv panel cubicles In Designated area near DG set Room
Offload each cubicle carefully on the designated area. Make sure that all cubicles are
seated on wooden Planks.
* When the switchgear or panels are shipped in more than one module, it will be necessary to bolt in individual section
together, in the presence of manufacturer/supplier representative.
* IFC drawings will indicate the relative positions of each section being supplied and shipped.
Ensure work area shall be free from debris and obstruction free.
Make sure that all the accessories and Tools required for Installation of 11KV Panels are
in Place
The equipment shall be checked and inspected against the relevant General arrangement
drawing.
* Clean the interior and exterior of switchboard using manufacturer’s approved methods and materials.
8. ATTACHMENTS
Drawings
AURECON
22-01-2018
A
METHOD STATEMENT FOR OFFLOADING AND INSTALLATION
OF 11KV SWITCHGEAR
DRAWING
1100
1100
CHAMBER DOOR LOCKING CHAMBER DOOR LOCKING CHAMBER DOOR LOCKING
2665
2665
VIEWING WINDOW VIEWING WINDOW VIEWING WINDOW
1565
1565
PROVISION FOR INSERTING PROVISION FOR INSERTING PROVISION FOR INSERTING
RACK IN/OUT HANDLE RACK IN/OUT HANDLE RACK IN/OUT HANDLE
B
PROVISION FOR
500
370
370
831
831
831
90 410 90 90 410 90
2150
1650
1650
78 444 78 78 444 78 78 444 78
1184
1184
CONTROL CONTROL CONTROL
CABLE ENTRY CABLE ENTRY CABLE ENTRY
B
35 35 35
732
732
732
CUTOUT FOR CUTOUT FOR CUTOUT FOR
CONTROL CABLE ACCESS CONTROL CABLE ACCESS CONTROL CABLE ACCESS
270
270
270
FOUNDATION FOUNDATION FOUNDATION
HOLES (2xØ12.5) HOLES (2xØ12.5) HOLES (2xØ12.5)
113
113
113
27 27 27
39 145.5 309 145.5 39 145.5 309 145.5 39 145.5 309 145.5
PANEL NO. PANEL-01 PANEL-02 PANEL-03 PANEL-04 PANEL-05 PANEL-06 PANEL-07 PANEL-08 PANEL-09 PANEL-10 PANEL-11 PANEL-12 PANEL-13 PANEL-14 PANEL-15 PANEL-16
FEEDER NAME OUTGOING OUTGOING GENERATOR GENERATOR GENERATOR BUS PT + GENERATOR GENERATOR OUTGOING BUS PT + BUS PT CUM UTILITY UTILITY OUTGOING
BUSCOUPLER BUSCOUPLER INCOMER INCOMER
DESCRIPTION FEEDER-1 FEEDER-2 INCOMER INCOMER INCOMER BUSRISER INCOMER INCOMER FEEDER-3 BUSRISER BUS EARTHING FEEDER-4
FEEDER-1 FEEDER-2 FEEDER-3 PANEL-1 FEEDER-1 FEEDER-4 FEEDER-5 PANEL-2 FEEDER-2 PANEL FEEDER-1 FEEDER-2
D
R.H.S SIDE
L.H.S SIDE
DEFLECTOR
DEFLECTOR
C
FFL (0.0)
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
9600
FRONT VIEW
PROVISION FOR
DEFLECTOR
B
800
PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR
LINE PT LINE PT LINE PT LINE PT LINE PT LINE PT LINE PT
>=825
1650
A
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
9600
FOUNDATION VIEW
1100
BUSBAR LINE PT
CHAMBER
C
L3 L1
BREAKER
CHAMBER
L2
2665
CURRENT TRASFORMER
B
CT
1565
EARTHING SWITCH
710
CABLE
CHAMBER
FFL (0.0)
EARTHING BAR
CIRCUIT BREAKER TROLLEY
1650 500
A
1100
BUSBAR LINE PT
CHAMBER
C
L3 L1
BREAKER
CHAMBER
L2
2665
CURRENT TRASFORMER
B
CT
1565
EARTHING SWITCH
710
CABLE
CHAMBER
FFL (0.0)
EARTHING BAR
CIRCUIT BREAKER TROLLEY
1650 500
A
1100
CHAMBER
BUSBAR
CHAMBER
C
L3 L1
BREAKER
CHAMBER
L2
2665
CURRENT TRASFORMER
CT
B
1565
EARTHING SWITCH
FFL (0.0)
EARTHING BAR
1650
CIRCUIT BREAKER TROLLEY
A
1100
BUSBAR
CHAMBER
C
BREAKER
CHAMBER L3 L1
L2
2665
CURRENT TRASFORMER
CT
B
1565
EARTHING SWITCH
CABLE
CHAMBER
FFL (0.0)
DEFLECTOR
1100
RELAY &
INSTRUMENT
CHAMBER
BUSBAR
CHAMBER
C
L3 L1
BUS PT
CHAMBER
L2
2665
1565
B
EARTHING SWITCH
FFL (0.0)
EARTHING BAR
1650
BUS PT TROLLEY
A
1100
CHAMBER
BUSBAR
CHAMBER
C
L3 L1
BUS PT
CHAMBER
L2
2665
1565
B
FFL (0.0)
EARTHING BAR
1650
BUS PT TROLLEY
A