ADDITIONAL NOTE:

AL MARYAH ISLAND
01. CONTRACTOR SHALL CONSIDER END CAP AT INTERFACE LOCATION BETWEEN
REGIONAL AND LOCAL INFRASTRUCTURE.
02. ALL PLOT CONNECTIONS INSIDE THE PLOT WILL BE UNDER LOCAL ROAD CONTRACT.
001 002 003 004 005 006 Bus
Stop

Bus
Stop

Bus
Stop

Stop
Bus

Stop
Bus

Bus
Stop
Stop
Bus

Stop
Bus

Stop
Bus
007 008 009 010 011 012
Stop
Bus

Stop
Bus

Stop
Bus

Bus
Stop

Bus
Stop

Stop
Bus
Bus
Stop

Stop
Bus
Stop
Bus
013 014 015 016 017 018

Stop
Bus

Stop
Bus
Stop
Bus

Stop
Bus
Stop
Bus

AL REEM ISLAND

19
18
17

16
20
15

14
21
13

12
22
11

10

23

8
7
24
6

25 4

3
2
1

KEY PLAN
NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
STATED.
2. ALL COORDINATES ARE IN WGS 84 UTM ZONE IN 40N.
ALL ELEVATIONS ARE REFERED TO NEW ABUDHABI
DATUM (NADD).
3. ALL DUCTS CROSSING UNDER THE CARRIAGE/
DRIVEWAY SHALL BE CONCRETE ENCASED.
LEGEND
EXISTING:
TELECOM NETWORK
TELECOM NETWORK TO BE REMOVED
PROPOSED:
9 WAY D54 100 mm PVC
MAIN DUCT
6 WAY D54 100 mm PVC
MAIN DUCT
4 WAY D54 100 mm PVC
MAIN DUCT
MATCHLINE SEE DWG. NO. CI-TP-01-04-003

MATCHLINE SEE DWG. NO. CI-TP-01-04-005


2 WAY D54 100 mm PVC
MAIN DUCT

RT4-C51
2 WAY D54 100 mm PVC
LEAD - IN DUCT

RT4-P42
TELECOM NETWORK
UNDER LOCAL PACKAGE
TELECOM 9WAY DUCT
BY OTHERS
RT4-P28

DUCT CONCRETE
RT4-P61

ENCASEMENT PROTECTION
4WAY MRT4
RT4-P65

JOINT BOX / MANHOLE


ROAD CC4-6 JRC 14
ROAD FF

JOINT BOX / MANHOLE


JRC 12
POP
TELECOM POP
INSIDE THE BUILDING
GREEN FIELD GSM
(10m x 10m) PLOT
BUILDING ROOF TOP GSM
MUSHTARAK
SCOPE UNDER REGIONAL ROADS
RT4-C31

PROJECT BOUNDARY
ROAD CC4-1

4WAY
CONSTRUCTION DOCUMENT

4WAY
RT4-C54

RT4-C55

RT4-C58
L.O.C
ROAD CC4-2
REV. DATE DESCRIPTION APPR'D
Client

4WAY

ROAD CC3-3 Consultant


4WAY
L.O.C

C4-5
DC

RT4-P53
A
RO Project / Contract
L.O.C

CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE


WORKS FOR PACKAGE II (A) (REGIONAL
4WAY INFRASTRUCTURE) AND PACKAGE II (B)
4W

(SEA BRIDGE) REEM ISLAND, ABU DHABI


AY

ROAD CC4-4 Drawing Title


RT4-P29

4WA
TELECOM NETWORK LAYOUT
4WA SHEET 04 OF 18
RT4-C27

ROA

Y
4WAY

Y
DF

RT4-C60
CONTRACT No: JOB No:
RT4-C56
F-1

DRAWN DESIGNED CHECKED APPROVED


RT4-C57

TAT JC MWA IS
DATE APRIL 2021 ACTUAL SIZE A1
Drawing Scale. 1:500 @ A1, 1:1000 @ A3

. O .C 0 5 10 20 30 40 50m

L Drawing No.
RT4-SS4

MATCHLINE SEE DWG. NO. CI-TP-01-04-010 CI-TP-01-04-004 C0


S:\PROJECTS\000000 Reem Island Pkg-IIA\04 Users\CADD\PDF\IFC DRAWINGS REGIONAL_(09-DEC-2021)\CAD\PART-6 UTILITIES\27-TELECOME NETWORK LAYOUT\CI-TP-01-04-001 TO 018.dwg
Last Saved By: P0090252 Last Saved Date: 12/9/2021 2:19 PM Printed Date: 12/9/2021 4:23 PM Printed By: Varghese, Sinu