AL MARYAH ISLAND
01. CONTRACTOR SHALL CONSIDER END CAP AT INTERFACE LOCATION BETWEEN
REGIONAL AND LOCAL INFRASTRUCTURE.
02. ALL PLOT CONNECTIONS INSIDE THE PLOT WILL BE UNDER LOCAL ROAD CONTRACT.
001 002 003 004 005 006 Bus
Stop
Bus
Stop
Bus
Stop
Stop
Bus
Stop
Bus
Bus
Stop
Stop
Bus
Stop
Bus
Stop
Bus
007 008 009 010 011 012
Stop
Bus
Stop
Bus
Stop
Bus
Bus
Stop
Bus
Stop
Stop
Bus
Bus
Stop
Stop
Bus
Stop
Bus
013 014 015 016 017 018
Stop
Bus
Stop
Bus
Stop
Bus
Stop
Bus
Stop
Bus
AL REEM ISLAND
19
18
17
16
20
15
14
21
13
12
22
11
10
23
8
7
24
6
25 4
3
2
1
KEY PLAN
NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
STATED.
2. ALL COORDINATES ARE IN WGS 84 UTM ZONE IN 40N.
ALL ELEVATIONS ARE REFERED TO NEW ABUDHABI
DATUM (NADD).
3. ALL DUCTS CROSSING UNDER THE CARRIAGE/
DRIVEWAY SHALL BE CONCRETE ENCASED.
LEGEND
EXISTING:
TELECOM NETWORK
TELECOM NETWORK TO BE REMOVED
PROPOSED:
9 WAY D54 100 mm PVC
MAIN DUCT
6 WAY D54 100 mm PVC
MAIN DUCT
4 WAY D54 100 mm PVC
MAIN DUCT
MATCHLINE SEE DWG. NO. CI-TP-01-04-003
RT4-C51
2 WAY D54 100 mm PVC
LEAD - IN DUCT
RT4-P42
TELECOM NETWORK
UNDER LOCAL PACKAGE
TELECOM 9WAY DUCT
BY OTHERS
RT4-P28
DUCT CONCRETE
RT4-P61
ENCASEMENT PROTECTION
4WAY MRT4
RT4-P65
PROJECT BOUNDARY
ROAD CC4-1
4WAY
CONSTRUCTION DOCUMENT
4WAY
RT4-C54
RT4-C55
RT4-C58
L.O.C
ROAD CC4-2
REV. DATE DESCRIPTION APPR'D
Client
4WAY
C4-5
DC
RT4-P53
A
RO Project / Contract
L.O.C
4WA
TELECOM NETWORK LAYOUT
4WA SHEET 04 OF 18
RT4-C27
ROA
Y
4WAY
Y
DF
RT4-C60
CONTRACT No: JOB No:
RT4-C56
F-1
TAT JC MWA IS
DATE APRIL 2021 ACTUAL SIZE A1
Drawing Scale. 1:500 @ A1, 1:1000 @ A3
. O .C 0 5 10 20 30 40 50m
L Drawing No.
RT4-SS4