Professional Documents
Culture Documents
Ci TP 01 04 015
Ci TP 01 04 015
CI-TP-01-04-009
ROAD EE-3
AL MARYAH ISLAND
RT4-C42
RT4-C41
RT4-C40
RT4-P25
001 002 003 004 005 006
RT4-P63
Bus
Stop
Bus
Stop
Bus
Stop
Stop
Bus
Stop
Bus
RT4-P71
Bus
Stop
Stop
Bus
Stop
Bus
Stop
Bus
007 008 009 010 011 012
Stop
Bus
Stop
Bus
Stop
Bus
Bus
Stop
Bus
Stop
Stop
Bus
Bus
Stop
Stop
Bus
Stop
Bus
013 014 015 016 017 018
Stop
Bus
Stop
Bus
Stop
Bus
Stop
Bus
Stop
Bus
AL REEM ISLAND
19
18
17
16
20
15
14
21
13
12
22
11
10
23
8
7
24
6
25 4
3
2
1
KEY PLAN
9WAY NOTES
9WAY
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
STATED.
L.O.C 2. ALL COORDINATES ARE IN WGS 84 UTM ZONE IN 40N.
ALL ELEVATIONS ARE REFERED TO NEW ABUDHABI
DATUM (NADD).
3. ALL DUCTS CROSSING UNDER THE CARRIAGE/
L.O.C DRIVEWAY SHALL BE CONCRETE ENCASED.
LEGEND
EXISTING:
TELECOM NETWORK
ROAD AA2
TELECOM NETWORK TO BE REMOVED
ROAD AA2 PROPOSED:
JN-09 9 WAY D54 100 mm PVC
MAIN DUCT
RT4-P26
TELECOM POP
RT4-C46
POP
RT4-P15
RT4-C45
BUILDING ROOF TOP GSM
RT4-P64
MUSHTARAK
SCOPE UNDER REGIONAL ROADS
PROJECT BOUNDARY
CONSTRUCTION DOCUMENT
Consultant
RT4-P50
Project / Contract
CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE
RT4-P52
Drawing No.
CI-TP-01-04-015 C0
S:\PROJECTS\000000 Reem Island Pkg-IIA\04 Users\CADD\PDF\IFC DRAWINGS REGIONAL_(09-DEC-2021)\CAD\PART-6 UTILITIES\27-TELECOME NETWORK LAYOUT\CI-TP-01-04-001 TO 018.dwg
Last Saved By: P0090252 Last Saved Date: 12/9/2021 2:19 PM Printed Date: 12/9/2021 4:24 PM Printed By: Varghese, Sinu